Increasing the integration of different forms of transport together with improved access to public transport by expanding the integrated hub system in the city of Szamotuła (Q134940): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Fixing rounding issue)
(‎Removed claim: summary (P836): This will be done through 2 tasks: 1. Extension of the ZWP at Szamotuach railway station: the parking area for Pampi; r, Bamp; r from the wind will be created. There will be access roads to the car parks, the pavement and the cycle path of the pass. The facility will become operational with the ITS system informing, inter alia, the available number of parking slots. The plant will be equipped with a modern installation of street lighting (15 l...)
Property / summary
This will be done through 2 tasks: 1. Extension of the ZWP at Szamotuach railway station: the parking area for Pampi; r, Bamp; r from the wind will be created. There will be access roads to the car parks, the pavement and the cycle path of the pass. The facility will become operational with the ITS system informing, inter alia, the available number of parking slots. The plant will be equipped with a modern installation of street lighting (15 lamps) and a monitoring system, and aesthetics will highlight the elements of a small architecture and develop green features. Storm water drainage will also be created. It shall also include the development of the complete documentation necessary for the correct implementation of the continued presence and the carrying out of the investor surveillance.2. Implementation of information and promotion measures: Factsheet on the funding awarded; in the press, there will be 3 articles dealing with the theme of the ecolog. transp. urban transport, information about the public in the media and the information on information on public news., social information on news., social information on information and posters., social media leaflets and posters, the organisation of picnic posters and posters, the organisation of picnic bicologist, cycle and pedestrian cycle, promotion of the idea of public transport activities taking place in the municipality. Car parks, R and Bamop, will be free and open to all users as a result of the project. The beneficiary of the project will be the local community of Szamotuła and, in particular, those benefiting from the ZWP. The planned effects in kind obtained from the project (2019): l. park-and-ride facilities (1). (English)
 
Property / summary: This will be done through 2 tasks: 1. Extension of the ZWP at Szamotuach railway station: the parking area for Pampi; r, Bamp; r from the wind will be created. There will be access roads to the car parks, the pavement and the cycle path of the pass. The facility will become operational with the ITS system informing, inter alia, the available number of parking slots. The plant will be equipped with a modern installation of street lighting (15 lamps) and a monitoring system, and aesthetics will highlight the elements of a small architecture and develop green features. Storm water drainage will also be created. It shall also include the development of the complete documentation necessary for the correct implementation of the continued presence and the carrying out of the investor surveillance.2. Implementation of information and promotion measures: Factsheet on the funding awarded; in the press, there will be 3 articles dealing with the theme of the ecolog. transp. urban transport, information about the public in the media and the information on information on public news., social information on news., social information on information and posters., social media leaflets and posters, the organisation of picnic posters and posters, the organisation of picnic bicologist, cycle and pedestrian cycle, promotion of the idea of public transport activities taking place in the municipality. Car parks, R and Bamop, will be free and open to all users as a result of the project. The beneficiary of the project will be the local community of Szamotuła and, in particular, those benefiting from the ZWP. The planned effects in kind obtained from the project (2019): l. park-and-ride facilities (1). (English) / rank
Normal rank
 

Revision as of 18:19, 21 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Increasing the integration of different forms of transport together with improved access to public transport by expanding the integrated hub system in the city of Szamotuła
Project in Poland financed by DG Regio

    Statements

    0 references
    2,153,401.34 zloty
    0 references
    516,816.32 Euro
    13 January 2020
    0 references
    2,533,413.35 zloty
    0 references
    608,019.2 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 July 2018
    0 references
    31 December 2019
    0 references
    MIASTO I GMINA SZAMOTUŁY
    0 references
    0 references
    Proj. realizowany będzie w ramach 2 zadań:1. Rozbudowa ZWP przy dworcu kolejowym w Szamotułach: w ramach zad. powstaną parkingi Pamp;R, Bamp;R z wiatą. Do parkingów prowadzić będzie droga dojazdowa, chodnik oraz ścieżka rowerowa z dopuszcz. ruchu pieszego. Obiekt zyska funkcjonalność dzięki systemowi ITS informującemu m.in. o dostępnej ilości msc parkingowych. Bezp. obiektu zapewni nowoczesny syst. oświetlenia ulicznego (15 lamp) oraz syst. monitoringu, a estetykę podkreślą elementy małej architektury, oraz zagospodarowana zieleń. Powstanie również kanalizacja deszczowa. Zad. obejmuje również opracowanie kompletnej dokumentacji niezbędnej do prawidłowej realizacji zad. oraz prowadzenie nadzoru inwestorskiego.2. Realizacja działań informacyjno-promocyjnych: Tab. inform. o przyznanym dofinansowaniu; w lok. prasie pojawią się 3 artykuły poruszające tematykę ekolog. transp. miejskiego, informacje o proj. w mediach społ. i na portalach inform., spot rekl., oprac. z udziałem mieszk. ulotek i plakatów dot. proj., organizacja pikniku ekolog., cykl rajdów rowerowych i pieszych, promocja idei transportu publ. podczas imprez plenerowych odbywających się na terenie Gminy. Powstałe w wyniku realizacji projektu parkingi Pamp;R oraz Bamp;R będą bezpłatne i ogólnodostępne dla wszystkich użytkowników. Beneficjentem projektu będzie społeczność lokalna Gminy Szamotuły, a w szczególności osoby korzystające z ZWP. Planowane efekty rzeczowe uzyskane w wyniku realizacji projektu (2019):L. wybudowanych obiektów „parkuj jedź” - 1 szt.L. miejsc postojowych w wybudowanych obiektach „parkuj i jedź” - 143 szt.L. miejsc postojowych dla osób niepełnosprawnych w wybudowanych obiektach „parkuj i jedź” - 2 szt.L. wybudowanych obiektów „Bikeamp;Ride” - 1 szt.L. stanowisk postojowych w wybudowanych obiektach „Bikeamp;Ride” - 20 szt.L. zainstalowanych inteligentnych systemów transportowych - 1 szt.Dł. dróg, na których zainstalowano inteligentne systemy transportowe - 102,4 kmDł. wybudowanych dróg dla (Polish)
    0 references

    Identifiers

    RPWP.03.03.03-30-0013/17
    0 references