Comprehensive thermal modernisation of the buildings of nurseries and public kindergartens of Kalisz City. (Q134867): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in 1 language: remove_english_label)
(‎Changed label, description and/or aliases in 1 language: translated_label)
label / enlabel / en
 
Comprehensive thermal modernisation of the buildings of nurseries and public kindergartens of Kalisz City.

Revision as of 18:17, 21 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Comprehensive thermal modernisation of the buildings of nurseries and public kindergartens of Kalisz City.
Project in Poland financed by DG Regio

    Statements

    0 references
    6,594,995.38 zloty
    0 references
    1,582,798.89 Euro
    13 January 2020
    0 references
    7,758,818.11 zloty
    0 references
    1,862,116.35 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    3 October 2017
    0 references
    8 February 2019
    0 references
    MIASTO KALISZ
    0 references
    0 references
    Proj. zawiera działania realizujące postulaty strategii niskoemis. Wynika z PGN dla Miasta Kalisza (MK). Zadania proj. wykazują pozyt. wpływ na środ. nat. – charakteryzują się oddziaływaniem łagodzącym na zmiany klimatu – ogranicz. niskiej emisji. Zakres rzecz. proj. obejmuje kompleksową modern. energet. bud. użyt. publ. stanowiących własność MK, w których zlokaliz. są żłobki (nr 2,3,4) oraz przedszkola (nr 1,9,18,20,27i30). Zakres rzecz. robót bud. przy każdym z ww. bud. został określony w audytach energet. oraz oprac. na ich podstawie projektach bud. Kompleks. głęboka modern. energet. każdego z ww. bud. będzie obejmowała przede wsz.: modernizację systemu grzewczego (c.o. oraz c.w.u. w tym pomy ciepła-OZE), docieplenie stropów, stropodachów, ścian zewn. i fundament., zamurowanie i/lub wymiana na energooszczędne okien (wraz z montażem nawiewników) i/lub stolarki drzwiowej, zastosowanie wentylacji. Uzupełnieniem niniejszego będzie montaż we wszystkich bud. paneli fotowoltan.-OZE oraz moderniz. energet. oświetlenia wewn. Wszystkie prace będą wykonywane w obrębie działek, na których zlokalizowane są przedmiotowe budynki. Dla zapewn. właściwego nadzoru nad realizacją całego frontu robót zaplan. wielobranż nadzór inwest. Szczeg. wykaz prac zaplan. w ramach poszczeg. zad. zawiera pkt. 3.4 wniosku oraz pozostała dok. aplikac. Proj. zawiera również działania z obszaru promocji źródeł jego finas.Proj. realizuje następujące wsk. prod.: liczba zmoderniz. energet. bud. – 9 szt. (2018r.-4 szt., 2019r.-5szt.), dod. zdolność wytw. en. elektr. ze źródeł odn. – 0,0633 MWe (2018r.-0,0323 MWe; 2019r.-0,031 MWe), dod. zdolność wytw en. ciepl. ze źródeł odn. – 0,05 MWt (2019 r.), liczba wybud. jedn. wytw. en. cieplnej z OZE – 4 szt. (2019 r.), liczba wybud. jedn. wytw. en. elektr. z OZE – 9 szt. (2018 r.-4 szt., 2019 r.-5 szt.), pow. użytk. bud. poddanych term. 7352,51 m2 (2018 r.-3683,63 m2, 2019 r.-3668,88 m2), liczba zmoderniz. źródeł ciepła – 9 szt. (2018 r.-4 szt., 2019 r.-5 szt.). (Polish)
    0 references
    The project contains actions that implement low-carbon strategies. It results from PGN for the City of Kalisz (MK). Project tasks show positive effects on Wednesday. — are characterised by mitigating effects on climate change – reducing low emissions. The scope of the item. project includes a comprehensive modern. energet. bud. use. publ. owned by the MK, in which the locations are nurseries (no. 2,3,4) and kindergartens (no. 1,9,18,20,27i30). The scope of construction works at each of the above-mentioned constructions has been defined in energet audits and development on the basis of these construction projects. The complex. deep modern. energet. of each of the above-mentioned building will include first of all: modernisation of the heating system (c.o. and hot water including heat RES), warming of ceilings, stropodache, exterior walls and foundation, bricking and/or replacement for energy-saving windows (including the installation of vents) and/or door carpentry, use of ventilation. This will be complemented by installation in all buildings. photovoltan panels.-RES and moderniz. energet. interior lighting. All works will be carried out within the plots on which the buildings are located. For sure. proper supervision over the execution of the entire front works plan. multi-discipline investment supervision. For details, the list of works planned. is included in the section. 3.4 of the proposal and the remainder of the application. The project also includes activities from the area of promotion of sources of its financials.Proj. implements the following: number of modernises. energet. bud. — 9 pcs. (2018-4 pcs, 2019-5 pcs), added ability of en. Electr. from sources of ren. — 0,0633 MWe (2018-0,0323 MWe; 2019-0.031 MWe), added capacity of en. heat output from springs. — 0,05 MWt (2019), number of constructions of one heat RES – 4 pcs. (2019), number of constructions of one electric RES – 9 pcs. (2018-4 pcs, 2019-5 pcs), area of buildings subjected to thermal treatment. 7352,51 m² (2018-3683.63 m², 2019-3668.88 m²), number of modernised heat sources – 9 pcs. (2018-4 pcs, 2019-5 pcs). (English)
    21 October 2020
    0 references

    Identifiers

    RPWP.03.02.04-30-0013/16
    0 references