“Marina Pluski — leisure and nautical education” (Q132639): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): As a result of the implementation of the project, a training centre for sailing nurseries with the Marina building, the marina with the bomanu bomanu building, the bridge and the pier for the mooring of the boat to the sailing boat in Plusne, on plot No 35/47, 881 and on plot 41/144, on the town of Pluski, will be created. The project covers the following tasks: And architectural design, investor supervision + architectural supervision II Boma...) |
(Created claim: summary (P836): As a result of the project, there will be a training base equipped with equipment for a sailing school with Marina building, a marina with a bosmanate building, a pier and a pier for berthing boats of a sailing school on Lake Pluszne on plot no 35/47, 881 and plot 41/144 of the town of Pluski. The project covers the implementation of the following tasks: And the architectural design of the interior, the supervision of the building + architectura...) |
||||||||||||||
Property / summary | |||||||||||||||
As a result of the project, there will be a training base equipped with equipment for a sailing school with Marina building, a marina with a bosmanate building, a pier and a pier for berthing boats of a sailing school on Lake Pluszne on plot no 35/47, 881 and plot 41/144 of the town of Pluski. The project covers the implementation of the following tasks: And the architectural design of the interior, the supervision of the building + architectural supervision II The water part of the bosmanate-continuous + grate for the punk seating of the bosmanate + the flooring of the bosmanate on the poles + gabions + slip concrete on the boats III Building Bosman-closed state + windows (without flooring) 150 m² indoor furniture 150 m² indoor swimming pool for the bosmanate + installation V Finishing (floor + painting) + flooring equipment The project is part of SZOOP RPO WiM Measures 6.2 Natural heritage, division 6.2.3 Efficient use of resources/thematic objective 6 and fulfils the objectives of Action – The infrastructure will be able to support demand for training and sailing camps and will also constitute an investment of public objective – because the planned infrastructure will be open and accessible to residents of the municipality of Stawiguda – mainly children and young people, and is planned to launch a sailing school in the Primary School. (English) | |||||||||||||||
Property / summary: As a result of the project, there will be a training base equipped with equipment for a sailing school with Marina building, a marina with a bosmanate building, a pier and a pier for berthing boats of a sailing school on Lake Pluszne on plot no 35/47, 881 and plot 41/144 of the town of Pluski. The project covers the implementation of the following tasks: And the architectural design of the interior, the supervision of the building + architectural supervision II The water part of the bosmanate-continuous + grate for the punk seating of the bosmanate + the flooring of the bosmanate on the poles + gabions + slip concrete on the boats III Building Bosman-closed state + windows (without flooring) 150 m² indoor furniture 150 m² indoor swimming pool for the bosmanate + installation V Finishing (floor + painting) + flooring equipment The project is part of SZOOP RPO WiM Measures 6.2 Natural heritage, division 6.2.3 Efficient use of resources/thematic objective 6 and fulfils the objectives of Action – The infrastructure will be able to support demand for training and sailing camps and will also constitute an investment of public objective – because the planned infrastructure will be open and accessible to residents of the municipality of Stawiguda – mainly children and young people, and is planned to launch a sailing school in the Primary School. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: As a result of the project, there will be a training base equipped with equipment for a sailing school with Marina building, a marina with a bosmanate building, a pier and a pier for berthing boats of a sailing school on Lake Pluszne on plot no 35/47, 881 and plot 41/144 of the town of Pluski. The project covers the implementation of the following tasks: And the architectural design of the interior, the supervision of the building + architectural supervision II The water part of the bosmanate-continuous + grate for the punk seating of the bosmanate + the flooring of the bosmanate on the poles + gabions + slip concrete on the boats III Building Bosman-closed state + windows (without flooring) 150 m² indoor furniture 150 m² indoor swimming pool for the bosmanate + installation V Finishing (floor + painting) + flooring equipment The project is part of SZOOP RPO WiM Measures 6.2 Natural heritage, division 6.2.3 Efficient use of resources/thematic objective 6 and fulfils the objectives of Action – The infrastructure will be able to support demand for training and sailing camps and will also constitute an investment of public objective – because the planned infrastructure will be open and accessible to residents of the municipality of Stawiguda – mainly children and young people, and is planned to launch a sailing school in the Primary School. (English) / qualifier | |||||||||||||||
point in time: 21 October 2020
|
Revision as of 18:10, 21 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | “Marina Pluski — leisure and nautical education” |
Project in Poland financed by DG Regio |
Statements
3,480,928.0 zloty
0 references
4,351,160.0 zloty
0 references
80.0 percent
0 references
11 September 2017
0 references
31 July 2020
0 references
FUNDACJA YACHT KLUB JUNGA
0 references
W wyniku realizacji projektu powstanie wyposażona w sprzęt baza szkoleniowa szkółki żeglarskiej z budynkiem Mariny, przystań z budynkiem bosmanatu, pomostem oraz pirsem do cumowania łodzi szkółki żeglarskiej nad jeziorem Pluszne na działce nr 35/47, 881 oraz działce 41/144 miejscowość Pluski. Projekt obejmuje realizację zadań: I Projekt architektoniczny, nadzór inwestorski + nadzór architektoniczny II Cześć wodna Bosmanatu-ławy ciągłe + ruszt do punkowego posadowienia Bosmanatu na palach lub studniach + gabiony+ slip betonowy na łodzie III Budynek Bosmanat-stan zamknięty + okna ( bez podłóg) 150 m2 IV Pompa cieplna do Bosmanatu+ montaż V Wykończenie (podłogi + malowanie) + wyposażenie Bosmanatu 150 m2 VI Rolety antywłamaniowe zewnętrzne do Bosmanatu VII Pirs (pomost pływający) + kładka z montażem VIII Ogrodzenie + oświetlenie +nawierzchnia i otoczenie Bosmanatu IX Budynek Mariny stan surowy zamknięty (z oknami bez podług) 310 m2 X Pompa cieplna do Budynku Mariny+ montaż XI Wykończenie (podłogi + malowanie) + wyposażenie Budynku Mariny 310 m2 XII Ogrodzenie + oświetlenie + nawierzchnia i otoczenie -zaplecze Mariny w tym parking na sprzęt XIII Budynek zaplecza Mariny Pluski na magazyn sprzętu żeglarskiego i wodnego XIV Zakupu sprzętu żeglarskiego i wodnego /planowany jest zakup łodzi wykorzystywanych wyłącznie na rzecz pozaszkolnych form szkoleń żeglarskich /. Projekt wpisuje się w SZOOP RPO WiM Działania 6.2 Dziedzictwo naturalne, podziałania 6.2.3 Efektywne wykorzystanie zasobów/cel tematyczny 6 i realizuje cele Działania - Powstała infrastruktura będzie w stanie obsłużyć popyt na szkolenia i obozy żeglarskie oraz dodatkowo stanowić będzie także inwestycję celu publicznego – ponieważ planowana infrastruktura będzie otwarta i dostępna dla mieszkańców gminy Stawiguda – głównie dzieci i młodzieży, oraz planowana jest dzięki niej do uruchomienia szkółka żeglarska w Szkole Podstawowej w Stawigudzie. (Polish)
0 references
As a result of the project, there will be a training base equipped with equipment for a sailing school with Marina building, a marina with a bosmanate building, a pier and a pier for berthing boats of a sailing school on Lake Pluszne on plot no 35/47, 881 and plot 41/144 of the town of Pluski. The project covers the implementation of the following tasks: And the architectural design of the interior, the supervision of the building + architectural supervision II The water part of the bosmanate-continuous + grate for the punk seating of the bosmanate + the flooring of the bosmanate on the poles + gabions + slip concrete on the boats III Building Bosman-closed state + windows (without flooring) 150 m² indoor furniture 150 m² indoor swimming pool for the bosmanate + installation V Finishing (floor + painting) + flooring equipment The project is part of SZOOP RPO WiM Measures 6.2 Natural heritage, division 6.2.3 Efficient use of resources/thematic objective 6 and fulfils the objectives of Action – The infrastructure will be able to support demand for training and sailing camps and will also constitute an investment of public objective – because the planned infrastructure will be open and accessible to residents of the municipality of Stawiguda – mainly children and young people, and is planned to launch a sailing school in the Primary School. (English)
21 October 2020
0 references
Identifiers
RPWM.06.02.03-28-0011/17
0 references