“Marina Pluski — leisure and nautical education” (Q132639): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Removed claim: summary (P836): As a result of the implementation of the project, a training centre for sailing nurseries with the Marina building, the marina with the bomanu bomanu building, the bridge and the pier for the mooring of the boat to the sailing boat in Plusne, on plot No 35/47, 881 and on plot 41/144, on the town of Pluski, will be created. The project covers the following tasks: And architectural design, investor supervision + architectural supervision II Boma...)
Property / summary
As a result of the implementation of the project, a training centre for sailing nurseries with the Marina building, the marina with the bomanu bomanu building, the bridge and the pier for the mooring of the boat to the sailing boat in Plusne, on plot No 35/47, 881 and on plot 41/144, on the town of Pluski, will be created. The project covers the following tasks: And architectural design, investor supervision + architectural supervision II Bomansnok-tap water supervision II Bomanatu-Muszawa point for the provision of bomanate downbomanate (floor + window (no floor) + window (no floor) 150 m² The project is part of the SZOOP ROP WiM, Measure 6.2 Natural Heritage, Action 6.2.3 Efficient use of resources/Thematic Objective 6 and pursues the objectives of the Action — Reset the infrastructure will be able to accommodate the demand for training and sailing camps and will also be an additional investment for the public target, since the planned infrastructure will be open and accessible to the inhabitants of the municipality of Staviguda — mostly children and young people, and is planned to make it operational at the Primary School in Staviguda. (English)
 
Property / summary: As a result of the implementation of the project, a training centre for sailing nurseries with the Marina building, the marina with the bomanu bomanu building, the bridge and the pier for the mooring of the boat to the sailing boat in Plusne, on plot No 35/47, 881 and on plot 41/144, on the town of Pluski, will be created. The project covers the following tasks: And architectural design, investor supervision + architectural supervision II Bomansnok-tap water supervision II Bomanatu-Muszawa point for the provision of bomanate downbomanate (floor + window (no floor) + window (no floor) 150 m² The project is part of the SZOOP ROP WiM, Measure 6.2 Natural Heritage, Action 6.2.3 Efficient use of resources/Thematic Objective 6 and pursues the objectives of the Action — Reset the infrastructure will be able to accommodate the demand for training and sailing camps and will also be an additional investment for the public target, since the planned infrastructure will be open and accessible to the inhabitants of the municipality of Staviguda — mostly children and young people, and is planned to make it operational at the Primary School in Staviguda. (English) / rank
Normal rank
 

Revision as of 18:10, 21 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
“Marina Pluski — leisure and nautical education”
Project in Poland financed by DG Regio

    Statements

    0 references
    3,480,928.0 zloty
    0 references
    835,422.72 Euro
    13 January 2020
    0 references
    4,351,160.0 zloty
    0 references
    1,044,278.4 Euro
    13 January 2020
    0 references
    80.0 percent
    0 references
    11 September 2017
    0 references
    31 July 2020
    0 references
    FUNDACJA YACHT KLUB JUNGA
    0 references
    0 references

    53°39'30.6"N, 20°24'4.3"E
    0 references
    W wyniku realizacji projektu powstanie wyposażona w sprzęt baza szkoleniowa szkółki żeglarskiej z budynkiem Mariny, przystań z budynkiem bosmanatu, pomostem oraz pirsem do cumowania łodzi szkółki żeglarskiej nad jeziorem Pluszne na działce nr 35/47, 881 oraz działce 41/144 miejscowość Pluski. Projekt obejmuje realizację zadań: I Projekt architektoniczny, nadzór inwestorski + nadzór architektoniczny II Cześć wodna Bosmanatu-ławy ciągłe + ruszt do punkowego posadowienia Bosmanatu na palach lub studniach + gabiony+ slip betonowy na łodzie III Budynek Bosmanat-stan zamknięty + okna ( bez podłóg) 150 m2 IV Pompa cieplna do Bosmanatu+ montaż V Wykończenie (podłogi + malowanie) + wyposażenie Bosmanatu 150 m2 VI Rolety antywłamaniowe zewnętrzne do Bosmanatu VII Pirs (pomost pływający) + kładka z montażem VIII Ogrodzenie + oświetlenie +nawierzchnia i otoczenie Bosmanatu IX Budynek Mariny stan surowy zamknięty (z oknami bez podług) 310 m2 X Pompa cieplna do Budynku Mariny+ montaż XI Wykończenie (podłogi + malowanie) + wyposażenie Budynku Mariny 310 m2 XII Ogrodzenie + oświetlenie + nawierzchnia i otoczenie -zaplecze Mariny w tym parking na sprzęt XIII Budynek zaplecza Mariny Pluski na magazyn sprzętu żeglarskiego i wodnego XIV Zakupu sprzętu żeglarskiego i wodnego /planowany jest zakup łodzi wykorzystywanych wyłącznie na rzecz pozaszkolnych form szkoleń żeglarskich /. Projekt wpisuje się w SZOOP RPO WiM Działania 6.2 Dziedzictwo naturalne, podziałania 6.2.3 Efektywne wykorzystanie zasobów/cel tematyczny 6 i realizuje cele Działania - Powstała infrastruktura będzie w stanie obsłużyć popyt na szkolenia i obozy żeglarskie oraz dodatkowo stanowić będzie także inwestycję celu publicznego – ponieważ planowana infrastruktura będzie otwarta i dostępna dla mieszkańców gminy Stawiguda – głównie dzieci i młodzieży, oraz planowana jest dzięki niej do uruchomienia szkółka żeglarska w Szkole Podstawowej w Stawigudzie. (Polish)
    0 references

    Identifiers

    RPWM.06.02.03-28-0011/17
    0 references