Thermal modernisation of the building at ul. Weather 2 in Pozistra (Q132368): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Fixing rounding issue)
(‎Removed claim: summary (P836): The project will include the preparation of a feasibility study, construction work, investor supervision and the promotion of the project. The project will consist of a comprehensive energy modernisation of the building SP (including the residential part) in Pozdruz. The work to be carried out will include: • insulation of the outer walls• the insulation of the ceiling for the last one, the mineral wool• The change in window frames for the new...)
Property / summary
The project will include the preparation of a feasibility study, construction work, investor supervision and the promotion of the project. The project will consist of a comprehensive energy modernisation of the building SP (including the residential part) in Pozdruz. The work to be carried out will include: • insulation of the outer walls• the insulation of the ceiling for the last one, the mineral wool• The change in window frames for the new• The change in old doors to a new project within a project will be carried out as a ineligible cost: Building the foundation — the school part of 60.67 %; — insulation of the building wall — 60.67 % school building; — repairing the roof and insulation the school — 60.67 % school; Accompanying works: input platform, ramp for incomplete persons., replacement of emerging roof (s), installation of roof buoys and tables, replacement of the taps and painting, renovation of the staircase to the basement; — Building a PV power of 4 kW; Upgrade of the existing light LED light; Modernisation of service water installations, construction of a new piping system, and replacement of individual old radiators. The project is in line with the Unit. 4.3. Comprehensive Moderate of Buildings, D. 4.3.2 Energy efficiency. The project will help to reduce the energy intensity of the building. The project aims at improving ambient air quality as well as reducing heat losses in the building, by improving the efficiency of the plant. The implementation of the investment will improve the protection of the environment and ensure a fair standard of living for the inhabitants. The applicant and the beneficiary of this project are Gm. The project will be coordinated by the workers of the UG in Pozupze in connection with the implementation of projects, work on financing projects from external sources, in particular as part of their monitoring and monitoring. The tasks covered by the project are carried out by Mr Pozezny, within the framework of the applicant’s organisational structures. (English)
 
Property / summary: The project will include the preparation of a feasibility study, construction work, investor supervision and the promotion of the project. The project will consist of a comprehensive energy modernisation of the building SP (including the residential part) in Pozdruz. The work to be carried out will include: • insulation of the outer walls• the insulation of the ceiling for the last one, the mineral wool• The change in window frames for the new• The change in old doors to a new project within a project will be carried out as a ineligible cost: Building the foundation — the school part of 60.67 %; — insulation of the building wall — 60.67 % school building; — repairing the roof and insulation the school — 60.67 % school; Accompanying works: input platform, ramp for incomplete persons., replacement of emerging roof (s), installation of roof buoys and tables, replacement of the taps and painting, renovation of the staircase to the basement; — Building a PV power of 4 kW; Upgrade of the existing light LED light; Modernisation of service water installations, construction of a new piping system, and replacement of individual old radiators. The project is in line with the Unit. 4.3. Comprehensive Moderate of Buildings, D. 4.3.2 Energy efficiency. The project will help to reduce the energy intensity of the building. The project aims at improving ambient air quality as well as reducing heat losses in the building, by improving the efficiency of the plant. The implementation of the investment will improve the protection of the environment and ensure a fair standard of living for the inhabitants. The applicant and the beneficiary of this project are Gm. The project will be coordinated by the workers of the UG in Pozupze in connection with the implementation of projects, work on financing projects from external sources, in particular as part of their monitoring and monitoring. The tasks covered by the project are carried out by Mr Pozezny, within the framework of the applicant’s organisational structures. (English) / rank
Normal rank
 

Revision as of 17:13, 21 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Thermal modernisation of the building at ul. Weather 2 in Pozistra
Project in Poland financed by DG Regio

    Statements

    0 references
    0 references
    215,302.41 zloty
    0 references
    51,672.58 Euro
    13 January 2020
    0 references
    256,312.39 zloty
    0 references
    61,514.97 Euro
    13 January 2020
    0 references
    84.0 percent
    0 references
    21 March 2017
    0 references
    30 September 2020
    0 references
    GMINA POZEZDRZE
    0 references

    54°8'26.9"N, 21°51'35.3"E
    0 references
    Przedsięwzięcie obejmowało będzie przygotowanie studium wykonalności, prace budowlane, nadzór inwestorski oraz promocję projektu. Projekt polegał będzie na kompleksowej modernizacji energetycznej budynku SP (w tym cz. mieszkalnej) w Pozezdrzu. Prace termom. będą obejmowały: • Ocieplenie ścian zewnętrznych • Docieplenie stropu nad ostatnią kond. wełną mineralną • Wymianę stolarki okiennej na nową • Wymianę starych drzwi na nowe W ramach projektu w obiekcie wykonane zostaną prace, stanowiące koszt niekwalifikowalny: - ocieplenie fundamentów – część szkolna 60,67%; - ocieplenie ścian budynku – część szkolna 60,67%; - naprawa dachu i ocieplenie poddasza – część szkolna 60,67%; - prace towarzyszące: podest wejściowy, pochylnia dla osób niepełnos., wymiana wyłazów dach., montaż płotków przeciwwilg. i ław komin., wymiana krat czyszczenie i malowanie krat, remont schodów do piwnicy; - budowa inst. fotowoltaicznej o mocy 4 kW; - modernizacja istniejącej inst. oświetlenia na LED; - modernizacja instalacji c.w.u., - budowa nowej instalacji rurowej C.O. oraz wymiana pojedynczych starych grzejników. Projekt jest zgodny z dział. 4.3. Kompleksowa modern. energ. budynków, podd. 4.3.2 Efektywność energ. w budynkach mieszk. Projekt przyczyni się do zmniejszenia energochłonności budynku. Przedmiotowy projekt ma na celu poprawę jakości powietrza atmosferycznego, a także ograniczenie strat ciepła w budynku, za sprawą poprawy efektywności energ. obiektu. Realizacja inwestycji przyczyni się do poprawy ochrony środowiska przyr. oraz zapewni mieszkańcom odpowiedni standard życia. Wnioskodawcą oraz beneficjentem tego projektu jest Gm. Wiejska Pozezdrze. Koordynacją proj. zajmować się będą pracownicy UG w Pozezdrzu posiadający dośw. w zakresie wdrażania projektów, prac związanych z projektami finansow. ze źródeł zewn., w szczególności w ramach ich kontroli i monitoringu. Zadania objęte projektem prowadzone są przez G. Pozezdrze, w ramach struktur organizacyjnych Wnioskodawcy (Polish)
    0 references

    Identifiers

    RPWM.04.03.02-28-0021/19
    0 references