Energy renovation of public buildings in the municipality of Orneta (Q132291): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The project consists of the thermal refurbishment of the public buildings of the Municipality of Orneta and will be carried out within its borders, including in areas such as: • Primary school at ul. Highlands 17a, 11-130 Orneta (dz. No 113/1, 114/1; 114/2 rim 2, Orneta, Orneta municipality,• Pre-school no. 1 at Ornecie located at ul. Kopernika 4, 11-130 Orneta (dz. 149/3, strip 3, City of Orneta),• City House of Culture in Orléans, ul. 1 May...) |
(Created claim: summary (P836): The project consists of the thermomodernisation of public utility buildings of the Municipality of Orneta and will be implemented within its limits, including in such places as: • Primary school in Bażyny located at ul. Pheasants 17a, 11-130 Orneta (c. No 113/1, 114/1; 114/2 region 2 Bażyny, commune Orneta), • Kindergarten No 1 in Ornet located at ul. Copernicus 4, 11-130 Orneta (d. No. 149/3, perimeter 3, City of Orneta), • Municipal House of C...) |
||||||||||||||
Property / summary | |||||||||||||||
The project consists of the thermomodernisation of public utility buildings of the Municipality of Orneta and will be implemented within its limits, including in such places as: • Primary school in Bażyny located at ul. Pheasants 17a, 11-130 Orneta (c. No 113/1, 114/1; 114/2 region 2 Bażyny, commune Orneta), • Kindergarten No 1 in Ornet located at ul. Copernicus 4, 11-130 Orneta (d. No. 149/3, perimeter 3, City of Orneta), • Municipal House of Culture in Ornet, located at ul. 1 May 45, 11-130 Orneta (d. No. 305, 187/12, 187/52, 188/2, perimeter 1 Ornet). The implementation of this project consists of a comprehensive energy modernisation of the above-mentioned public utility buildings of the Municipality of Orneta, taking into account: replacement of installation wires, warming of ceiling and roof, insulation of external walls, replacement of old windows and doors, replacement of radiators with thermostatic heater valves, installation of vents on verticals and adjustment of the installation. The detailed scope of this work, broken down by building, is set out in Chapter 2. Project identification, feasibility study. The result of such a planned project will be to reduce the consumption of energy by the public buildings of the municipality of Orneta by 60.40 %, reducing their maintenance costs from the scope of energy consumption by PLN 112 907.21/year, as well as reducing the emissions of pollutants generated by these facilities, including a reduction of CO2 emissions by 63.95 %, thanks to which it fits into its objectives under Measure 4.3.1 RPO WiM 2014-2020, which is: Increased energy efficiency of public buildings. All preparatory activities for the implementation of the project, as well as those already related to its execution and settlement, will be carried out or supervised by employees of the Municipal Office in Ornet. (English) | |||||||||||||||
Property / summary: The project consists of the thermomodernisation of public utility buildings of the Municipality of Orneta and will be implemented within its limits, including in such places as: • Primary school in Bażyny located at ul. Pheasants 17a, 11-130 Orneta (c. No 113/1, 114/1; 114/2 region 2 Bażyny, commune Orneta), • Kindergarten No 1 in Ornet located at ul. Copernicus 4, 11-130 Orneta (d. No. 149/3, perimeter 3, City of Orneta), • Municipal House of Culture in Ornet, located at ul. 1 May 45, 11-130 Orneta (d. No. 305, 187/12, 187/52, 188/2, perimeter 1 Ornet). The implementation of this project consists of a comprehensive energy modernisation of the above-mentioned public utility buildings of the Municipality of Orneta, taking into account: replacement of installation wires, warming of ceiling and roof, insulation of external walls, replacement of old windows and doors, replacement of radiators with thermostatic heater valves, installation of vents on verticals and adjustment of the installation. The detailed scope of this work, broken down by building, is set out in Chapter 2. Project identification, feasibility study. The result of such a planned project will be to reduce the consumption of energy by the public buildings of the municipality of Orneta by 60.40 %, reducing their maintenance costs from the scope of energy consumption by PLN 112 907.21/year, as well as reducing the emissions of pollutants generated by these facilities, including a reduction of CO2 emissions by 63.95 %, thanks to which it fits into its objectives under Measure 4.3.1 RPO WiM 2014-2020, which is: Increased energy efficiency of public buildings. All preparatory activities for the implementation of the project, as well as those already related to its execution and settlement, will be carried out or supervised by employees of the Municipal Office in Ornet. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The project consists of the thermomodernisation of public utility buildings of the Municipality of Orneta and will be implemented within its limits, including in such places as: • Primary school in Bażyny located at ul. Pheasants 17a, 11-130 Orneta (c. No 113/1, 114/1; 114/2 region 2 Bażyny, commune Orneta), • Kindergarten No 1 in Ornet located at ul. Copernicus 4, 11-130 Orneta (d. No. 149/3, perimeter 3, City of Orneta), • Municipal House of Culture in Ornet, located at ul. 1 May 45, 11-130 Orneta (d. No. 305, 187/12, 187/52, 188/2, perimeter 1 Ornet). The implementation of this project consists of a comprehensive energy modernisation of the above-mentioned public utility buildings of the Municipality of Orneta, taking into account: replacement of installation wires, warming of ceiling and roof, insulation of external walls, replacement of old windows and doors, replacement of radiators with thermostatic heater valves, installation of vents on verticals and adjustment of the installation. The detailed scope of this work, broken down by building, is set out in Chapter 2. Project identification, feasibility study. The result of such a planned project will be to reduce the consumption of energy by the public buildings of the municipality of Orneta by 60.40 %, reducing their maintenance costs from the scope of energy consumption by PLN 112 907.21/year, as well as reducing the emissions of pollutants generated by these facilities, including a reduction of CO2 emissions by 63.95 %, thanks to which it fits into its objectives under Measure 4.3.1 RPO WiM 2014-2020, which is: Increased energy efficiency of public buildings. All preparatory activities for the implementation of the project, as well as those already related to its execution and settlement, will be carried out or supervised by employees of the Municipal Office in Ornet. (English) / qualifier | |||||||||||||||
point in time: 21 October 2020
|
Revision as of 17:11, 21 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Energy renovation of public buildings in the municipality of Orneta |
Project in Poland financed by DG Regio |
Statements
1,398,158.8 zloty
0 references
1,827,658.57 zloty
0 references
76.5 percent
0 references
29 December 2016
0 references
31 August 2021
0 references
GMINA ORNETA
0 references
Przedmiotowe przedsięwzięcie polega na termomodernizacji budynków użyteczności publicznej Gminy Orneta i realizowane będzie w jej granicach, w tym w takich miejscach, jak: • Szkoła Podstawowa w Bażynach zlokalizowana przy ul. Bażyny 17a, 11-130 Orneta (dz. Nr 113/1, 114/1; 114/2 obręb 2 Bażyny, gmina Orneta), • Przedszkole nr 1 w Ornecie zlokalizowane przy ul. Kopernika 4, 11-130 Orneta (dz. Nr 149/3, obręb 3, Miasto Orneta), • Miejski Dom Kultury w Ornecie zlokalizowany przy ul. 1 maja 45, 11-130 Orneta (dz. Nr 305, 187/12, 187/52, 188/2, obręb 1 Orneta). Realizacja niniejszego projektu polega na wykonanie kompleksowej modernizacji energetycznej ww. budynków użyteczności publicznej Gminy Orneta, uwzględniającej: wymianę przewodów instalacji, docieplenie stropodachu i dachu, docieplenie ścian zewnętrznych, wymianę starych okien i drzwi, wymianę grzejników na nowe z zaworami termostatycznymi przygrzejnikowymi, montaż odpowietrzników na pionach oraz regulacja instalacji. Szczegółowy zakres niniejszych prac w podziale na poszczególne budynki znajduje się w rozdziale 2. Identyfikacja projektu, Studium Wykonalności. Efektem tak zaplanowanego przedsięwzięcia będzie redukcja zużycia przez przedmiotowe budynki użyteczności publicznej Gminy Orneta energii o 60,40%, zmniejszając przy tym koszty ich utrzymania z zakresu zużycia energii o 112 907,21 zł/ rok, a także redukując emisję zanieczyszczeń generowanych przez obiekty te, w tym ograniczenie emisji CO2 o 63,95%, dzięki czemu wpisuje się ono w swoich założeniach w cel Poddziałania 4.3.1 RPO WiM 2014-2020, jakim jest: „Zwiększona efektywność energetyczna budynków użyteczności publicznej". Wszelkie czynności przygotowawcze do realizacji przedmiotowego przedsięwzięcia, a także te związane już z samym jego wykonaniem oraz rozliczeniem, będą prowadzone lub nadzorowane przez pracowników Urzędu Miejskiego w Ornecie. (Polish)
0 references
The project consists of the thermomodernisation of public utility buildings of the Municipality of Orneta and will be implemented within its limits, including in such places as: • Primary school in Bażyny located at ul. Pheasants 17a, 11-130 Orneta (c. No 113/1, 114/1; 114/2 region 2 Bażyny, commune Orneta), • Kindergarten No 1 in Ornet located at ul. Copernicus 4, 11-130 Orneta (d. No. 149/3, perimeter 3, City of Orneta), • Municipal House of Culture in Ornet, located at ul. 1 May 45, 11-130 Orneta (d. No. 305, 187/12, 187/52, 188/2, perimeter 1 Ornet). The implementation of this project consists of a comprehensive energy modernisation of the above-mentioned public utility buildings of the Municipality of Orneta, taking into account: replacement of installation wires, warming of ceiling and roof, insulation of external walls, replacement of old windows and doors, replacement of radiators with thermostatic heater valves, installation of vents on verticals and adjustment of the installation. The detailed scope of this work, broken down by building, is set out in Chapter 2. Project identification, feasibility study. The result of such a planned project will be to reduce the consumption of energy by the public buildings of the municipality of Orneta by 60.40 %, reducing their maintenance costs from the scope of energy consumption by PLN 112 907.21/year, as well as reducing the emissions of pollutants generated by these facilities, including a reduction of CO2 emissions by 63.95 %, thanks to which it fits into its objectives under Measure 4.3.1 RPO WiM 2014-2020, which is: Increased energy efficiency of public buildings. All preparatory activities for the implementation of the project, as well as those already related to its execution and settlement, will be carried out or supervised by employees of the Municipal Office in Ornet. (English)
21 October 2020
0 references
Identifiers
RPWM.04.03.01-28-0045/18
0 references