Thermal modernisation of the City Hall building in Lidzka WarMinsk City Hall (Q132236): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Fixing rounding issue)
(‎Removed claim: summary (P836): The object of the project is the thermal renovation of the building of the City Hall of the Lizshoulder of Warmicski Street at ul. Aleksandra Świętochowski 14, a plot of land: 98 in the 6 cadastral unit 128 No of the Rural Book No OL1L/00009851/3; 1. Preparatory work phase: selection and implementation: audit of energy. (ex ante), including the design document, the lighting efficiency audits of the lighting, the ulter of ornithological studies...)
Property / summary
The object of the project is the thermal renovation of the building of the City Hall of the Lizshoulder of Warmicski Street at ul. Aleksandra Świętochowski 14, a plot of land: 98 in the 6 cadastral unit 128 No of the Rural Book No OL1L/00009851/3; 1. Preparatory work phase: selection and implementation: audit of energy. (ex ante), including the design document, the lighting efficiency audits of the lighting, the ulter of ornithological studies and chirophoterology, and the study of the sketch. — Q2018 2. Investment phase: selection and implementation: Investment supervision, construction works, compensatory measures, project promotion — Q2019 to the fourth quarter of 2020. scope of work: 1. insulation of building envelope, 2. replacement of window and door frames (including modernisation of ventilation system by means of ventilation of the air and door (3) insulation of costume 4. insulation of the ceiling under non-heated 5th replacement of lighting on LED 6. replacement of light on LED. upgrade of the system Co and CWU, cooling system, (montaz pc (4 air/water heat pump, replacement of distribution pipes) 7. installation of pv 86 items x 290 W/power of the panel shall be entered in the annex included in the OOP RPOWWM Subject matter. 4, specific objective: Increased efficiency in public buildings. The investment in question aims to improve the efficiency of buildings. The work envisaged is part of the types of projects to be implemented and is carried out in order to implement the indicators. Energy efficiency is at the heart of Europe’s energy policy and is one of the main goals of Europe 2020 losses. Energy efficiency can make a significant contribution towards achieving the target of a low-carbon economy and combating climate change. investment for energy efficiency in buildings yields significant energy savings, while supporting growth and sustainability. https://maks2.warmia.mazury.pl/index.php/projekt/index (English)
 
Property / summary: The object of the project is the thermal renovation of the building of the City Hall of the Lizshoulder of Warmicski Street at ul. Aleksandra Świętochowski 14, a plot of land: 98 in the 6 cadastral unit 128 No of the Rural Book No OL1L/00009851/3; 1. Preparatory work phase: selection and implementation: audit of energy. (ex ante), including the design document, the lighting efficiency audits of the lighting, the ulter of ornithological studies and chirophoterology, and the study of the sketch. — Q2018 2. Investment phase: selection and implementation: Investment supervision, construction works, compensatory measures, project promotion — Q2019 to the fourth quarter of 2020. scope of work: 1. insulation of building envelope, 2. replacement of window and door frames (including modernisation of ventilation system by means of ventilation of the air and door (3) insulation of costume 4. insulation of the ceiling under non-heated 5th replacement of lighting on LED 6. replacement of light on LED. upgrade of the system Co and CWU, cooling system, (montaz pc (4 air/water heat pump, replacement of distribution pipes) 7. installation of pv 86 items x 290 W/power of the panel shall be entered in the annex included in the OOP RPOWWM Subject matter. 4, specific objective: Increased efficiency in public buildings. The investment in question aims to improve the efficiency of buildings. The work envisaged is part of the types of projects to be implemented and is carried out in order to implement the indicators. Energy efficiency is at the heart of Europe’s energy policy and is one of the main goals of Europe 2020 losses. Energy efficiency can make a significant contribution towards achieving the target of a low-carbon economy and combating climate change. investment for energy efficiency in buildings yields significant energy savings, while supporting growth and sustainability. https://maks2.warmia.mazury.pl/index.php/projekt/index (English) / rank
Normal rank
 

Revision as of 17:00, 21 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Thermal modernisation of the City Hall building in Lidzka WarMinsk City Hall
Project in Poland financed by DG Regio

    Statements

    0 references
    2,310,417.05 zloty
    0 references
    554,500.09 Euro
    13 January 2020
    0 references
    2,852,718.92 zloty
    0 references
    684,652.54 Euro
    13 January 2020
    0 references
    80.99 percent
    0 references
    15 March 2018
    0 references
    31 December 2020
    0 references
    GMINA MIEJSKA LIDZBARK WARMIŃSKI
    0 references
    0 references

    54°7'50.2"N, 20°33'53.6"E
    0 references
    Przedmiotem projektu jest termomodernizacja budynku Urzędu Miasta w Lidzbarku Warmińskim przy ul. Aleksandra Świętochowskiego 14, działki: 98 w obrębie ewidencyjnym 6 w jednostce ewidencyjnej 128 nr Księgi Wieczystej OL1L/00009851/3; 1. Etap prac przygotowawczych: wybór wyk. i realizację zad.: oprac. audytu energet. (ex-ante) wraz z dok. projektową, oprac. audytów efektywności energet. oświetlenia, wyk. ekspertyz ornitologicznych i chiropterologicznych, oprac.studium wykon. - III kwartał 2018 r. 2. Etap prac inwestycyjnych: wybór wyk. i realizację zad.: Nadzór inwestorski, Roboty budowlane, Działania kompensacyjne, Promocja projektu - III kwartał 2019 r. do IV kwartał 2020 r. Zakres prac: 1. docieplenie przegród zewnętrznych, 2. wymiana stolarki okiennej i drzwiowej (w tym modernizacja systemu wentylacji poprzez zastosowanie nawiewników powietrza i drzwiowej, 3. docieplenie stropodachu 4. docieplenie stropu pod nieogrzewanym poddaszem 5. wymiana oświetlenia na LED 6. modernizacja systemu co i cwu, systemu chłodzenia, (montaz pc (4 pompy ciepła powietrze/woda, wymiana przewodów rozprowadzających) 7. montaż pv 86 szt. x 290 W/moc panela Projekt wpisuje się w zał. wpisane w SzOOP RPOWWM Cel temat. 4, cel szczegółowy: Zwiększona efekt. energet. w budynkach użyteczności publicznej. Przedmiotowa inwestycja zmierza do poprawy efektyw. budynków. Przewidziane prace wpisują się w typy projektów przewidzianych do realizacji oraz realizują założone do realizacji wskaźniki. Efektywność energet. leży u podstaw europejskiej polityki energet. i jest jednym z głównych celów strat.„Europa 2020”. Efektywne zużycie energii może znacząco przyczynić się do osiągnięcia celu w postaci gospodarki niskoemisyjnej i walki ze zmianami klimatycznymi.Inwestycja na rzecz efektywności energetycznej w budynkach przynosi znaczne oszczędności energii, jednocześnie wspierając wzrost gosp. i zrównoważony rozwój.https://maks2.warmia.mazury.pl/index.php/projekt/index (Polish)
    0 references

    Identifiers

    RPWM.04.03.01-28-0006/18
    0 references