‘Thermal upgrade of a production and storage building at ul. Malborska in Elbląg.’ (Q132218): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The project is a thermo-modernisation of a production and storage facility located at ul. Malborska 93C on plot 1057/1, 0022 M. Elbląg, number KW EL1E/00079940/8 in the resources of the WROEXPO Spółka z o. o. this is 596 m². According to the facility’s energy audit, the technical documentation and the electricity audit in order to achieve the optimal energy parameters for the facility, the following material scope of the renovation work is nec...)
(‎Created claim: summary (P836): The subject of the project is the thermal modernisation of the production and storage facility located at ul. Malborska 93C on plot number 1057/1 of 0022 M. Elbląg number KW EL1E/00079940/8 which is in the resources of WROEXPO Spółka z o. o. Used area of the building undergoing thermal modernisation: that’s 596 m². According to the energy audit of the facility, the technical documentation and the audit of electricity in order to achieve optimal...)
Property / summary
 
The subject of the project is the thermal modernisation of the production and storage facility located at ul. Malborska 93C on plot number 1057/1 of 0022 M. Elbląg number KW EL1E/00079940/8 which is in the resources of WROEXPO Spółka z o. o. Used area of the building undergoing thermal modernisation: that’s 596 m². According to the energy audit of the facility, the technical documentation and the audit of electricity in order to achieve optimal energy parameters for the facility, it is necessary to carry out the following material range of thermal retrofitting works: The building on the street. Malborska 93C: — Energy audit and technical documentation – Installation of central heating – purchase of 50 kW biomass boiler. — Hot usable water – Roof/Stropodach – Outer wall No 2 – Outer wall No. 1 – Installation of mechanical ventilation – External doors for modernisation – Window for modernisation – Change of light sources into LEDs with luminaires according to the breakdown of lighting by purpose: modernisation of the installation in order to adapt to new lamp positioning systems, making in building switchgears appropriate overcurrent, differentcoprad and countercurrent protections. — Installation of PV panels with power up to 10 kWe supporting internal lighting – the installation of 32 units of photovoltaic panels (100x1670x32mm) of 305 W The project fits into the assumptions set out in the SzOOP RPO WiM due to the assumed rationalisation and reduction of energy consumption in the SME sector achieved as a result of a deep, comprehensive energy modernisation of the building in an enterprise used for economic purposes. (English)
Property / summary: The subject of the project is the thermal modernisation of the production and storage facility located at ul. Malborska 93C on plot number 1057/1 of 0022 M. Elbląg number KW EL1E/00079940/8 which is in the resources of WROEXPO Spółka z o. o. Used area of the building undergoing thermal modernisation: that’s 596 m². According to the energy audit of the facility, the technical documentation and the audit of electricity in order to achieve optimal energy parameters for the facility, it is necessary to carry out the following material range of thermal retrofitting works: The building on the street. Malborska 93C: — Energy audit and technical documentation – Installation of central heating – purchase of 50 kW biomass boiler. — Hot usable water – Roof/Stropodach – Outer wall No 2 – Outer wall No. 1 – Installation of mechanical ventilation – External doors for modernisation – Window for modernisation – Change of light sources into LEDs with luminaires according to the breakdown of lighting by purpose: modernisation of the installation in order to adapt to new lamp positioning systems, making in building switchgears appropriate overcurrent, differentcoprad and countercurrent protections. — Installation of PV panels with power up to 10 kWe supporting internal lighting – the installation of 32 units of photovoltaic panels (100x1670x32mm) of 305 W The project fits into the assumptions set out in the SzOOP RPO WiM due to the assumed rationalisation and reduction of energy consumption in the SME sector achieved as a result of a deep, comprehensive energy modernisation of the building in an enterprise used for economic purposes. (English) / rank
 
Normal rank
Property / summary: The subject of the project is the thermal modernisation of the production and storage facility located at ul. Malborska 93C on plot number 1057/1 of 0022 M. Elbląg number KW EL1E/00079940/8 which is in the resources of WROEXPO Spółka z o. o. Used area of the building undergoing thermal modernisation: that’s 596 m². According to the energy audit of the facility, the technical documentation and the audit of electricity in order to achieve optimal energy parameters for the facility, it is necessary to carry out the following material range of thermal retrofitting works: The building on the street. Malborska 93C: — Energy audit and technical documentation – Installation of central heating – purchase of 50 kW biomass boiler. — Hot usable water – Roof/Stropodach – Outer wall No 2 – Outer wall No. 1 – Installation of mechanical ventilation – External doors for modernisation – Window for modernisation – Change of light sources into LEDs with luminaires according to the breakdown of lighting by purpose: modernisation of the installation in order to adapt to new lamp positioning systems, making in building switchgears appropriate overcurrent, differentcoprad and countercurrent protections. — Installation of PV panels with power up to 10 kWe supporting internal lighting – the installation of 32 units of photovoltaic panels (100x1670x32mm) of 305 W The project fits into the assumptions set out in the SzOOP RPO WiM due to the assumed rationalisation and reduction of energy consumption in the SME sector achieved as a result of a deep, comprehensive energy modernisation of the building in an enterprise used for economic purposes. (English) / qualifier
 
point in time: 21 October 2020
Timestamp+2020-10-21T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 16:59, 21 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
‘Thermal upgrade of a production and storage building at ul. Malborska in Elbląg.’
Project in Poland financed by DG Regio

    Statements

    0 references
    447,155.99 zloty
    0 references
    107,317.44 Euro
    13 January 2020
    0 references
    526,065.87 zloty
    0 references
    126,255.81 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    12 April 2018
    0 references
    30 June 2022
    0 references
    WROEXPO SPÓŁKA Z OGRANICZONA ODPOWIEDZIALNOŚCIĄ
    0 references
    0 references

    54°11'56.0"N, 19°26'28.0"E
    0 references
    Przedmiotem projektu jest termomodernizacja obiektu produkcyjno - magazynowego położonego przy ul. Malborskiej 93C na działce o numerze 1057/1 obręb 0022 M. Elbląg numer KW EL1E/00079940/8 będącego w zasobach WROEXPO Spółka z o. o. Powierzchnia użytkowa budynku poddawanego termomodernizacji: to 596 m2. Zgodnie z przeprowadzonym audytem energetycznym obiektu, dokumentacją techniczną oraz audytem energii elektrycznej dla uzyskania optymalnych dla obiektu parametrów energetycznych niezbędna jest realizacja następującego zakresu rzeczowego robót termomodernizacyjnych: Budynek przy ul. Malborska 93C: - Audyt energetyczny i dokumentacja techniczna - Instalacja centralnego ogrzewania - zakup kotła na biomasę o mocy 50 kW. - Ciepła woda użytkowa - Dach/Stropodach - Ściana zewnętrzna nr 2 - Ściana zewnętrzna nr 1 - Instalacja wentylacji mechanicznej - Drzwi zewnętrzne do modernizacji - Okna do modernizacji - Wymianę źródeł światła na LED wraz z oprawami zgodnie z podziałem oświetlenia według przeznaczenia: modernizację instalacji celem dostosowania do nowych układów usytuowania lamp, wykonanie w rozdzielniach budynkowych odpowiednich zabezpieczeń nadprądowych, róznicopradowych oraz przeciwprądowych. - Montaż układu płyt PV o mocy do 10 kWe wspomagających oświetlenie wewnętrzne - zakłada się montaż 32 szt. paneli fotowoltaicznych (100x1670x32mm) o mocy 305 W Projekt wpisuje się w założenia określone w SzOOP RPO WiM z uwagi na założoną racjonalizację i spadek zużycia energii w sektorze MŚP osiągniętą w efekcie głębokiej, kompleksowej modernizacji energetycznej budynku w przedsiębiorstwie wykorzystywanego na cele gospodarcze. (Polish)
    0 references
    The subject of the project is the thermal modernisation of the production and storage facility located at ul. Malborska 93C on plot number 1057/1 of 0022 M. Elbląg number KW EL1E/00079940/8 which is in the resources of WROEXPO Spółka z o. o. Used area of the building undergoing thermal modernisation: that’s 596 m². According to the energy audit of the facility, the technical documentation and the audit of electricity in order to achieve optimal energy parameters for the facility, it is necessary to carry out the following material range of thermal retrofitting works: The building on the street. Malborska 93C: — Energy audit and technical documentation – Installation of central heating – purchase of 50 kW biomass boiler. — Hot usable water – Roof/Stropodach – Outer wall No 2 – Outer wall No. 1 – Installation of mechanical ventilation – External doors for modernisation – Window for modernisation – Change of light sources into LEDs with luminaires according to the breakdown of lighting by purpose: modernisation of the installation in order to adapt to new lamp positioning systems, making in building switchgears appropriate overcurrent, differentcoprad and countercurrent protections. — Installation of PV panels with power up to 10 kWe supporting internal lighting – the installation of 32 units of photovoltaic panels (100x1670x32mm) of 305 W The project fits into the assumptions set out in the SzOOP RPO WiM due to the assumed rationalisation and reduction of energy consumption in the SME sector achieved as a result of a deep, comprehensive energy modernisation of the building in an enterprise used for economic purposes. (English)
    21 October 2020
    0 references

    Identifiers

    RPWM.04.02.00-28-0075/18
    0 references