Improving energy efficiency in BIONA PLUS SP. WITH O. LIMITED PARTNERSHIP (Q132198): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Fixing rounding issue)
(‎Removed claim: summary (P836): The object of the project is the work of thermo-modem in the buildings of Kęczenńska 18, 11-200Bartoszyce (123/137, 123/136 123/138 (before the division 123/87), 123/139 123/140 (before division 123/86). — Strict external (styrop.-? = 0,040W/m * K, 1 496.4 m²) — basement in the basement (contact plate — p.-? = 0,040W/m * K, 183.8 m²) — round (wool,? = 0,037 W/m * K, 523.6 m²) — costumes (wool,? = 0,040 W/m * K, 318.0 m², styropap, wood wool,?...)
Property / summary
The object of the project is the work of thermo-modem in the buildings of Kęczenńska 18, 11-200Bartoszyce (123/137, 123/136 123/138 (before the division 123/87), 123/139 123/140 (before division 123/86). — Strict external (styrop.-? = 0,040W/m * K, 1 496.4 m²) — basement in the basement (contact plate — p.-? = 0,040W/m * K, 183.8 m²) — round (wool,? = 0,037 W/m * K, 523.6 m²) — costumes (wool,? = 0,040 W/m * K, 318.0 m², styropap, wood wool,? = 0,037 W/m * K, 446.5 m²) -Strop above the heated basement (tin plates, 0,040W/m * K, 1 342.7 m²) — Partial replacement of windows to more leakproof and energy efficient (the heat transfer coefficient U? 0,90 [W/m² * K] (WT2021), 5.2 m²) -5 items. — Modernisation of the system through the replacement of window and door frames. Photovoltaic panels (105 units of panels 310 In each) Detailed description and scope are included in the energy and technical audit. The phases of the implementation of the project: — submission of the application — signature of contract — selection of contractor in accordance with the contract rule. Conclusion of the contract with the contractor and start of works to be carried out in accordance with the harp. — Completion of the project and signature of the final statement — final statement of the project is fully in line with the assumptions made in the SzOOP, RPOWiM, pursuing the objective pursued: Increased efficiency in companies. The investment in question aims to improve the impact of the undertaking. The work envisaged within the framework of the investment is in line with the types of projects to be implemented and is carried out in order to implement the indicators. Energy efficiency. (EE) is at the heart of Europe’s energy policy and is one of the main objectives of the Europe 2020 strategy for smart, sustainable and inclusive growth. efficient energy consumption can make a significant contribution to achieving the goal of achieving low carbon and low emissions and combating climate change. Investment for effect (English)
 
Property / summary: The object of the project is the work of thermo-modem in the buildings of Kęczenńska 18, 11-200Bartoszyce (123/137, 123/136 123/138 (before the division 123/87), 123/139 123/140 (before division 123/86). — Strict external (styrop.-? = 0,040W/m * K, 1 496.4 m²) — basement in the basement (contact plate — p.-? = 0,040W/m * K, 183.8 m²) — round (wool,? = 0,037 W/m * K, 523.6 m²) — costumes (wool,? = 0,040 W/m * K, 318.0 m², styropap, wood wool,? = 0,037 W/m * K, 446.5 m²) -Strop above the heated basement (tin plates, 0,040W/m * K, 1 342.7 m²) — Partial replacement of windows to more leakproof and energy efficient (the heat transfer coefficient U? 0,90 [W/m² * K] (WT2021), 5.2 m²) -5 items. — Modernisation of the system through the replacement of window and door frames. Photovoltaic panels (105 units of panels 310 In each) Detailed description and scope are included in the energy and technical audit. The phases of the implementation of the project: — submission of the application — signature of contract — selection of contractor in accordance with the contract rule. Conclusion of the contract with the contractor and start of works to be carried out in accordance with the harp. — Completion of the project and signature of the final statement — final statement of the project is fully in line with the assumptions made in the SzOOP, RPOWiM, pursuing the objective pursued: Increased efficiency in companies. The investment in question aims to improve the impact of the undertaking. The work envisaged within the framework of the investment is in line with the types of projects to be implemented and is carried out in order to implement the indicators. Energy efficiency. (EE) is at the heart of Europe’s energy policy and is one of the main objectives of the Europe 2020 strategy for smart, sustainable and inclusive growth. efficient energy consumption can make a significant contribution to achieving the goal of achieving low carbon and low emissions and combating climate change. Investment for effect (English) / rank
Normal rank
 

Revision as of 16:59, 21 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Improving energy efficiency in BIONA PLUS SP. WITH O. LIMITED PARTNERSHIP
Project in Poland financed by DG Regio

    Statements

    0 references
    723,638.35 zloty
    0 references
    173,673.20 Euro
    13 January 2020
    0 references
    890,303.09 zloty
    0 references
    213,672.74 Euro
    13 January 2020
    0 references
    81.28 percent
    0 references
    6 July 2015
    0 references
    30 September 2019
    0 references
    BONA PLUS SP Z O O SPÓŁKA KOMANDYTOWA
    0 references
    0 references

    54°15'20.9"N, 20°48'24.5"E
    0 references
    Przedmiotem projektu są prac termomod. w budynku-Kętrzyńska 18, 11-200Bartoszyce (123/137, 123/136 123/138 (przed podziałem 123/87), 123/139 123/140 (przed podziałem 123/86). zakres: -Ściany zewn.(płyty styrop.-?=0,040W/m*K,1496,4m2) -ściany zewn. piwnicy (płyty styrop.-?=0,040W/m*K, 183,8m2) - ściana zewn. przy gruncie (płyty styrop.-?=0,040W/m*K, 523,6m2) -stropodach (wełna min.,?=0,037W/m*K,318,0m2, styropapa z papą asflatową, 0,040W/m*K,1041,9m2, płyt styrop.) -Strop pod nieogrzewanym poddaszem (płyt wełny min., ?=0,037W/m*K,446,5m2) -Strop nad nieogrzewaną piwnicą (płyt styrop,0,040W/m*K,1342,7m2) -Częściowa wymiana okien na bardziej szczelne i energooszczędne (współczynnik przenikania ciepła U?0,90 [W/m2*K] (WT2021), 5,2m2)-5 szt. -Modernizacja systemu went. pośrednio realizowana poprzez wymianę stolarki okiennej i drzwiowej. -panele fotowoltaiczne (105 szt. paneli 310 W każdy) Szczegółowy opis i zakres zawarto w audycie energetycznym i dok techn. Etapy realizacji projektu: -złożenie wniosku -podpisanie umowy -wybór wykonawcy zgodnie z zasadą konk. -zawarcie umowy z wykonawcą i rozpoczęcie prac -realizacja prac zgodnie z harm. -zakończenie projektu i podpisanie protokołu końcowego -końcowe rozliczenie Projekt w pełni wpisuje się w założenia wpisane w SzOOP RPOWiM realizując założony cel: Zwiększona efektywność energet. w przedsiębiorstwach. Przedmiotowa inwestycja zmierza do poprawy efekt. przedsiębiorstwa. Prace przewidziane w ramach inwestycji wpisują się w typy projektów przewidzianych do realizacji oraz realizują założone do realizacji wskaźniki. Efektywność energet. (EE) leży u podstaw europejskiej polityki energet. i jest jednym z głównych celów strategii „Europa 2020” na rzecz inteligentnego, zrównoważonego wzrostu sprzyjającego włączeniu społecznemu.Efektywne zużycie energii może znacząco przyczynić się do osiągnięcia celu w postaci gosp.i niskoemisyjnej i walki ze zmianami klimatycznymi. Inwestycja na rzecz efekt (Polish)
    0 references

    Identifiers

    RPWM.04.02.00-28-0057/17
    0 references