Thermo-modernisation of the building by F.H. SADO Zbigniew Yanukovych (Q132187): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The investment consists of the thermal modernisation of the building by Zbigniew Janusak, Firma Handlowy “SADO” Zbigniew Yanukovych, mij.Owiki.20, aiming at reducing heat demand by reducing heat transmission losses by reducing the transfer of heat from the building divisions and by modernising the ventilation system. the project is in line with the project type referred to in SzOOP ROP WiM 2014-2020 for action 4.2-2.Modernisation of technical...)
(‎Created claim: summary (P836): The investment consists of the thermal modernisation of the building by the Commercial Company “sado” Zbigniew Januszczyk, in the city.Olecko,ul.Sembrzycki 20, plot No.275 aimed at reducing heat transfer losses as a result of reduction of heat transfer through the construction divisions and modernisation of the ventilation system.The project fits into the type of project mentioned in SzOOP RPO WiM 2014-2020 for operation 4.2-2. The project meets...)
Property / summary
 
The investment consists of the thermal modernisation of the building by the Commercial Company “sado” Zbigniew Januszczyk, in the city.Olecko,ul.Sembrzycki 20, plot No.275 aimed at reducing heat transfer losses as a result of reduction of heat transfer through the construction divisions and modernisation of the ventilation system.The project fits into the type of project mentioned in SzOOP RPO WiM 2014-2020 for operation 4.2-2. The project meets all the shore conditions specified in the Shoop. As part of this project, it is planned to: The interchange of the interior of the system is the internalisation of the internal heating system, the interior of the interior, the interior of the interior, the interior of the interior, the interior of the interior, the interior of the interior, the interior of the interior, the interior of the interior, the interior of the interior. (English)
Property / summary: The investment consists of the thermal modernisation of the building by the Commercial Company “sado” Zbigniew Januszczyk, in the city.Olecko,ul.Sembrzycki 20, plot No.275 aimed at reducing heat transfer losses as a result of reduction of heat transfer through the construction divisions and modernisation of the ventilation system.The project fits into the type of project mentioned in SzOOP RPO WiM 2014-2020 for operation 4.2-2. The project meets all the shore conditions specified in the Shoop. As part of this project, it is planned to: The interchange of the interior of the system is the internalisation of the internal heating system, the interior of the interior, the interior of the interior, the interior of the interior, the interior of the interior, the interior of the interior, the interior of the interior, the interior of the interior, the interior of the interior. (English) / rank
 
Normal rank
Property / summary: The investment consists of the thermal modernisation of the building by the Commercial Company “sado” Zbigniew Januszczyk, in the city.Olecko,ul.Sembrzycki 20, plot No.275 aimed at reducing heat transfer losses as a result of reduction of heat transfer through the construction divisions and modernisation of the ventilation system.The project fits into the type of project mentioned in SzOOP RPO WiM 2014-2020 for operation 4.2-2. The project meets all the shore conditions specified in the Shoop. As part of this project, it is planned to: The interchange of the interior of the system is the internalisation of the internal heating system, the interior of the interior, the interior of the interior, the interior of the interior, the interior of the interior, the interior of the interior, the interior of the interior, the interior of the interior, the interior of the interior. (English) / qualifier
 
point in time: 21 October 2020
Timestamp+2020-10-21T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 16:58, 21 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Thermo-modernisation of the building by F.H. SADO Zbigniew Yanukovych
Project in Poland financed by DG Regio

    Statements

    0 references
    0 references
    571,410.58 zloty
    0 references
    137,138.54 Euro
    13 January 2020
    0 references
    714,263.22 zloty
    0 references
    171,423.17 Euro
    13 January 2020
    0 references
    80.0 percent
    0 references
    15 June 2018
    0 references
    30 November 2019
    0 references
    F.H. SADO ZBIGNIEW JANUSZCZYK
    0 references
    0 references

    54°2'20.8"N, 22°29'37.7"E
    0 references
    Inwestycja polega na termomodernizacji budynku przez Firmę Handlową "SADO" Zbigniew Januszczyk,w miej.Olecko,ul.Sembrzyckiego 20,nr działki.275 zmierzającej do zmniejszenia zapotrzebowania ciepła w wyniku zmniejszenia strat przenikania ciepła przez zmniejszenie start przenikania ciepła przez przegrody budowlane oraz modernizację systemu wentylacji.Projekt wpisuje się w typ projektu wymieniony w SzOOP RPO WiM 2014-2020 dla działania 4.2-2.Modernizacja instalacji technicznych w przedsiębiorstwie na efektywne energetycznie, w tym pod kątem wykorzystania OZE 3.Głęboka,kompleksowa modernizacja energetyczna w przedsiębiorstwach z możliwością wymiany i/lub modernizacją źródła energii z uwzględnieniem OZE;7.Audyt energetyczny. Projekt spełnia wszystkie warunki brzegowe określone w SzOOP. W ramach przedmiotowego projektu planuje się: -Ocieplenie stropodachu -Ocieplenie ścian zewnętrznych -Wymiana stolarki okiennej i drzwiowej(133szt.Wymiana okien istniejących na okna szczelne trzyszybowe,wymianę bram i drzwi wejściowych-na zewnętrzne przegrody przeźroczyste) -Zastosowanie systemu zarządzania energią -Modernizacja instalacji grzewczej wraz z wymiennikami ciepła w pomieszczeniach(modernizacja pionów,rozdzielnic,stworzenie nowej armatury grzewczej z zaworami termostatycznymi) -Montaż systemu fotowoltaicznego(39,6kW,144szt,moc pojedyncza modułu 275W,3 inwertery) W ramach projektu planuje się wymianę stolarki drzwiowej i okiennej na nową o wyższych parametrach energooszczędności.Planowana jest moder.instalacji grzewczej budynku oraz budowa,uruchomienie i przyłączenie do sieci energetycznej mikro instalacji fotowoltaicznej.Celem jest optymalne wykorzystanie ener. produkowanej przez inst.fotowoltaiczną na częściowe zaspokojenie zapotrzebowania na e.elektryczną.Instalacja fotowolt.musi być wyposażona w zabezpieczenie przeciwko wypływowi energii do sieci,zdalny monitoring pracy.Projekt zostanie zakończony w ciągu 1 roku od podpisania umowy o dofinansowanie. (Polish)
    0 references
    The investment consists of the thermal modernisation of the building by the Commercial Company “sado” Zbigniew Januszczyk, in the city.Olecko,ul.Sembrzycki 20, plot No.275 aimed at reducing heat transfer losses as a result of reduction of heat transfer through the construction divisions and modernisation of the ventilation system.The project fits into the type of project mentioned in SzOOP RPO WiM 2014-2020 for operation 4.2-2. The project meets all the shore conditions specified in the Shoop. As part of this project, it is planned to: The interchange of the interior of the system is the internalisation of the internal heating system, the interior of the interior, the interior of the interior, the interior of the interior, the interior of the interior, the interior of the interior, the interior of the interior, the interior of the interior, the interior of the interior. (English)
    21 October 2020
    0 references

    Identifiers

    RPWM.04.02.00-28-0048/18
    0 references