Q132101 (Q132101): Difference between revisions
Jump to navigation
Jump to search
(Created claim: summary (P836): The applicant plans to carry out an investment involving installation of photovoltaic panels in the infrastructure of the production plant in Barcikowo commune Dobre Miasto. A photovoltaic system with rated power of 40 kWp (consisting of 125 units of monocrystalline modules with a unit power of 320 W), connected to a distribution network directly to a three-phase low voltage electrical system is provided. The entire installation will be planted...) |
(Changed label, description and/or aliases in 1 language: remove_english_label) |
||
label / en | label / en | ||
Revision as of 16:54, 21 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project in Poland financed by DG Regio |
Statements
181,330.57 zloty
0 references
213,330.08 zloty
0 references
85.0 percent
0 references
26 September 2016
0 references
31 October 2018
0 references
MEBELMAX - MIECZYSŁAW JASIŃSKI
0 references
Wnioskodawca planuje przeprowadzić inwestycję polegającą na montażu instalacji paneli fotowoltaicznych w infrastrukturze zakładu produkcyjnego w miejscowości Barcikowo gmina Dobre Miasto. Przewidziano system fotowoltaiczny o mocy znamionowej 40 kWp (składający się z 125 szt. modułów monokrystalicznych o mocy jednostkowej 320W), podłączony do sieci dystrybucyjnej bezpośrednio do trójfazowej instalacji elektr. niskiego napięcia. Całość instalacji będzie posadowiona na dachu budynku produkcyjnego i będzie stanowiła integralną część obiektu, określana jako instalacja nadachowa. Przyłączenie do sieci odbywa się na podstawie zgłoszenia do danego operatora sieci w tym przypadku Energa Operator. Zgodnie z ustawą przyłączenie mikro-instalacji fotowoltaicznej do mocy i włącznie 40 kWp do sieci jest w obowiązku każdego operatora i nie wymaga pozwolenia na budowę. Etapy realizacji projektu: - złożenie wniosku o do?nansowanie - podpisanie umowy o do?nansowanie - wybór wykonawcy zgodnie z zasadą konkurencyjności - zawarcie umowy z wykonawcą i rozpoczęcie prac - realizacja prac zgodnie z założonym harmonogramem - zakończenie projektu i podpisanie protokołu końcowego - końcowe rozliczenie projektu Sposób wdrażania: -postępowanie konk. i podpisanie umowy -montaż instalacji -odbiór instalacji -rozliczenie - f-ra końcowa, prot. potw. wskaźniki Projekt wpisuje się w założenia wpisane w SzOOP RPOWiM realizując założony cel: Zwiększony udział OZE w ogólnym bilansie energet. regionu. Realizacja poddziałania pozwoli na zwiększenie udziału energii odnawialnej w bilansie energ. przedsiębiorstwa, co wpłynie na zwiększenie udziału energii odnawialnej w bilansie energ. Regionu. Wpłynie to na ograniczenie emisji szkodliwych gazów i pyłów do atmosfery oraz dzięki wykorzystaniu lokalnych źródeł energii odnawialnej zwiększy konkurencyjność ?rmy. W wyniku realizacji inwestycji spadną koszty związane ze zużyciem energii. (Polish)
0 references
The applicant plans to carry out an investment involving installation of photovoltaic panels in the infrastructure of the production plant in Barcikowo commune Dobre Miasto. A photovoltaic system with rated power of 40 kWp (consisting of 125 units of monocrystalline modules with a unit power of 320 W), connected to a distribution network directly to a three-phase low voltage electrical system is provided. The entire installation will be planted on the roof of the production building and will form an integral part of the facility, referred to as a supervising installation. The connection to the network is based on a notification to the network operator in this case Energa Operator. According to the Act, the connection of a micro-voltaic installation to power and including 40 kWp to the network is required by each operator and does not require a construction permit. Stages of project implementation:— submission of an application for funding – signing of a financing agreement – selection of the contractor in accordance with the principle of competitiveness – conclusion of the contract with the contractor and commencement of works – implementation of works according to the planned schedule – completion of the project and signing of the final protocol – final settlement of the project Method of implementation: —conclusion and contract signing -assembly of the installation -receipt of the installation – settlement – final f-ra, table of indicators The project is inscribed in the assumptions entered in the Polish SzOOP by fulfilling the objective of:Increased share of RES in the overall energy balance of the region.The implementation of the sub-measure will increase the share of renewable energy in the company’s energy balance, which will increase the share of renewable energy in the energy balance.It’s a region.This will reduce emissions of harmful gases and dust into the atmosphere and by using local renewable energy sources will increase the competitiveness of the company.The cost of energy consumption will fall as a result of the investment. (English)
21 October 2020
0 references
Identifiers
RPWM.04.01.00-28-0563/16
0 references