Development of provincial road No 185 Piotrowo — Zielonagóra — stage II (Q135159): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Fixing rounding issue)
(‎Removed claim: summary (P836): The project is located in the region of Wielkopolskie, in the district of Szamotuski, in the municipality of Ostrzycko. The subject of the study is the extension of provincial road No 185 over a distance of 1.6 km between Zielonagóra and Piotrowo. Under the ‘non-investment’ option, the road is in very poor technical condition, which is a major obstacle for drivers and a threat to traffic safety. The road does not have separated pavements or ha...)
Property / summary
The project is located in the region of Wielkopolskie, in the district of Szamotuski, in the municipality of Ostrzycko. The subject of the study is the extension of provincial road No 185 over a distance of 1.6 km between Zielonagóra and Piotrowo. Under the ‘non-investment’ option, the road is in very poor technical condition, which is a major obstacle for drivers and a threat to traffic safety. The road does not have separated pavements or hard shoulders, making pedestrians and cyclists more difficult and dangerous. The current communication solution does not provide a comfortable travel experience, makes it difficult for drivers to work and, above all, creates danger for motorists and pedestrians. Heavy transit traffic is organised in a built-up area with local car traffic and walking and cycling, which lowers the level of safety causing a direct threat. In addition, under this route, transit traffic exposes residents to noise and vibration and has a negative impact on air quality. The investment consists of: — an extension of the road from km 0 + 000 to km 1 + 600, — construction of the intersection of the roundabout on the route of regional roads 185 and 182, — construction of a crossroads between regional roads 185 and, — construction of pavements and bus platforms, — construction of two service roads — construction of culverts by road, — reconstruction of electric collisions, telecommunications and sanitation, — construction of individual and public roads, — cleaning up a tree within the boundaries of the road by cutting down trees endangering road safety. as a result of the investment being carried out in 2016, 1.6 km of provincial road No 185: — road category — Voivodship, — technical class: — single-carriageway class G, — load — 115 kN/axle, — traffic category KR-4, — width of road — 6.5 m (2x3.25 m), — width of open side — 1.5 m. (English)
 
Property / summary: The project is located in the region of Wielkopolskie, in the district of Szamotuski, in the municipality of Ostrzycko. The subject of the study is the extension of provincial road No 185 over a distance of 1.6 km between Zielonagóra and Piotrowo. Under the ‘non-investment’ option, the road is in very poor technical condition, which is a major obstacle for drivers and a threat to traffic safety. The road does not have separated pavements or hard shoulders, making pedestrians and cyclists more difficult and dangerous. The current communication solution does not provide a comfortable travel experience, makes it difficult for drivers to work and, above all, creates danger for motorists and pedestrians. Heavy transit traffic is organised in a built-up area with local car traffic and walking and cycling, which lowers the level of safety causing a direct threat. In addition, under this route, transit traffic exposes residents to noise and vibration and has a negative impact on air quality. The investment consists of: — an extension of the road from km 0 + 000 to km 1 + 600, — construction of the intersection of the roundabout on the route of regional roads 185 and 182, — construction of a crossroads between regional roads 185 and, — construction of pavements and bus platforms, — construction of two service roads — construction of culverts by road, — reconstruction of electric collisions, telecommunications and sanitation, — construction of individual and public roads, — cleaning up a tree within the boundaries of the road by cutting down trees endangering road safety. as a result of the investment being carried out in 2016, 1.6 km of provincial road No 185: — road category — Voivodship, — technical class: — single-carriageway class G, — load — 115 kN/axle, — traffic category KR-4, — width of road — 6.5 m (2x3.25 m), — width of open side — 1.5 m. (English) / rank
Normal rank
 

Revision as of 16:40, 21 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Development of provincial road No 185 Piotrowo — Zielonagóra — stage II
Project in Poland financed by DG Regio

    Statements

    0 references
    4,682,367.65 zloty
    0 references
    1,123,768.24 Euro
    13 January 2020
    0 references
    5,508,667.83 zloty
    0 references
    1,322,080.28 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    7 July 2016
    0 references
    14 June 2017
    0 references
    SAMORZĄD WOJEWÓDZTWA WIELKOPOLSKEGO
    0 references
    0 references
    Projektowana inwestycja zlokalizowana jest w województwie wielkopolskim, w powiecie szamotulskim, w gminie Obrzycko. Przedmiotem opracowania jest rozbudowa drogi wojewódzkiej nr 185 na odcinku długości 1,6 km pomiędzy miejscowościami Zielonagóra i Piotrowo. W wariancie bezinwestycyjnym, droga jest w bardzo złym stanie technicznym, co stanowi znaczące utrudnienie dla kierowców i zagrożenie bezpieczeństwa ruchu. Droga nie posiada wydzielonych chodników czy utwardzonych poboczy, przez co ruch pieszych i rowerzystów jest utrudniony i niebezpieczny. Obecne rozwiązanie komunikacyjne nie zapewnia komfortu podróżowania, utrudnia pracę kierowcom, a przede wszystkim stwarza niebezpieczeństwo wobec zmotoryzowanych oraz pieszych uczestników ruchu. Ciężki ruch tranzytowy wytyczony w terenie zabudowanym spotyka się z lokalnym ruchem samochodowym oraz pieszym i rowerowym, co obniża poziom bezpieczeństwa, powodując bezpośrednie zagrożenie. Ponadto odbywający się tą trasą ruch tranzytowy naraża mieszkańców na uciążliwości akustyczne oraz wibracje, jak również negatywnie oddziałuje na czystość powietrza. Inwestycja obejmuje:- rozbudowę drogi na odcinku od km 0+000 do km 1+600 ,- budowę skrzyżowania typu rondo na połączeniu dróg wojewódzkich 185 i 182,- budowę ciągu pieszo – rowerowego,- budowę chodników i peronów autobusowych,- budowę dwóch dróg serwisowych- budowę przepustu pod drogą,- przebudowę kolizji elektrycznych, telekomunikacyjnych i kanalizacji sanitarnej,- budowę zjazdów indywidualnych i publicznych,- uporządkowanie zadrzewienia w granicach pasa drogowego poprzez wycinkę drzew zagrażających bezpieczeństwu ruchu drogowego.W wyniku zrealizowania inwestycji w roku 2016 przebudowanych zostanie 1,6 km drogi wojewódzkiej nr 185.Podstawowe parametry techniczne drogi nr 185:- kategoria drogi - wojewódzka,- klasa techniczna: - jednojezdniowa droga klasy G,- obciążenie - 115 kN/oś,- kategoria ruchu - KR-4,- szerokość jezdni- 6,5 m (2x3,25 m), - szerokość pobocza gruntowego - 1,5 m. (Polish)
    0 references

    Identifiers

    RPWP.05.01.01-30-0007/15
    0 references