Investment in RES in a Market Krystyna (Q132041): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The applicant envisages the construction of a photovoltaic installation with the total installed capacity of 26,79 kWp panels, will be placed on the roof of the building. The design of the installation consists of 94 polycrystalline photovoltaic panels of 285 W, equipped with power optimisation and inverters. The task of the planned PV is to generate electricity for the parameters of the electricity grid and then to install it in the internal...) |
(Created claim: summary (P836): The applicant envisages the construction of a photovoltaic installation with a total capacity of 26.79 kWp installed panels, will be planted on the roof of the building. The designed installation consists of 94 units of polycrystalline photovoltaic panels with a power output of 285 W, equipped with power optimisation and inverter. The task of the designed photovoltaic installation is to generate electricity with the parameters of the electricity...) |
||||||||||||||
Property / summary | |||||||||||||||
The applicant envisages the construction of a photovoltaic installation with a total capacity of 26.79 kWp installed panels, will be planted on the roof of the building. The designed installation consists of 94 units of polycrystalline photovoltaic panels with a power output of 285 W, equipped with power optimisation and inverter. The task of the designed photovoltaic installation is to generate electricity with the parameters of the electricity grid, and then to develop it in the internal electrical installation by the customer. Stages of project implementation: — submission of an application for funding – signing of a grant agreement – selection of the contractor in accordance with the principle of competitiveness – conclusion of an agreement with the contractor and commencement of works – implementation of works according to the planned schedule – completion of the project and signing of the final protocol – final settlement of the project Method of implementation: —conclusion and conclusion of the contract -Installation-Installation-Assembly method of mounting inst.:loading system – reception of the installation – settlement – final f-ra, protocol. indicators The project is inscribed in the assumptions entered in the Polish SzOOP by fulfilling the stated goal: Increased share of RES in the overall energy balance of the region. The implementation of the sub-measure will increase the share of renewable energy in the company’s energy balance, which will increase the share of renewable energy in the energy balance. It’s a region. This will reduce emissions of harmful gases and dust into the atmosphere and by using local renewable energy sources will increase the competitiveness of the company. The cost of energy consumption will fall as a result of the investment. (English) | |||||||||||||||
Property / summary: The applicant envisages the construction of a photovoltaic installation with a total capacity of 26.79 kWp installed panels, will be planted on the roof of the building. The designed installation consists of 94 units of polycrystalline photovoltaic panels with a power output of 285 W, equipped with power optimisation and inverter. The task of the designed photovoltaic installation is to generate electricity with the parameters of the electricity grid, and then to develop it in the internal electrical installation by the customer. Stages of project implementation: — submission of an application for funding – signing of a grant agreement – selection of the contractor in accordance with the principle of competitiveness – conclusion of an agreement with the contractor and commencement of works – implementation of works according to the planned schedule – completion of the project and signing of the final protocol – final settlement of the project Method of implementation: —conclusion and conclusion of the contract -Installation-Installation-Assembly method of mounting inst.:loading system – reception of the installation – settlement – final f-ra, protocol. indicators The project is inscribed in the assumptions entered in the Polish SzOOP by fulfilling the stated goal: Increased share of RES in the overall energy balance of the region. The implementation of the sub-measure will increase the share of renewable energy in the company’s energy balance, which will increase the share of renewable energy in the energy balance. It’s a region. This will reduce emissions of harmful gases and dust into the atmosphere and by using local renewable energy sources will increase the competitiveness of the company. The cost of energy consumption will fall as a result of the investment. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The applicant envisages the construction of a photovoltaic installation with a total capacity of 26.79 kWp installed panels, will be planted on the roof of the building. The designed installation consists of 94 units of polycrystalline photovoltaic panels with a power output of 285 W, equipped with power optimisation and inverter. The task of the designed photovoltaic installation is to generate electricity with the parameters of the electricity grid, and then to develop it in the internal electrical installation by the customer. Stages of project implementation: — submission of an application for funding – signing of a grant agreement – selection of the contractor in accordance with the principle of competitiveness – conclusion of an agreement with the contractor and commencement of works – implementation of works according to the planned schedule – completion of the project and signing of the final protocol – final settlement of the project Method of implementation: —conclusion and conclusion of the contract -Installation-Installation-Assembly method of mounting inst.:loading system – reception of the installation – settlement – final f-ra, protocol. indicators The project is inscribed in the assumptions entered in the Polish SzOOP by fulfilling the stated goal: Increased share of RES in the overall energy balance of the region. The implementation of the sub-measure will increase the share of renewable energy in the company’s energy balance, which will increase the share of renewable energy in the energy balance. It’s a region. This will reduce emissions of harmful gases and dust into the atmosphere and by using local renewable energy sources will increase the competitiveness of the company. The cost of energy consumption will fall as a result of the investment. (English) / qualifier | |||||||||||||||
point in time: 21 October 2020
|
Revision as of 16:36, 21 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Investment in RES in a Market Krystyna |
Project in Poland financed by DG Regio |
Statements
103,658.54 zloty
0 references
121,951.22 zloty
0 references
85.0 percent
0 references
12 June 2018
0 references
31 July 2018
0 references
MARKET "KRYSTYNKA" S.C. ARKADIUSZ WIĘCEK, PAWEŁ WIĘCEK, KRZYSZTOF WIĘCEK
0 references
Wnioskodawca przewiduje budowę instalacja fotowoltaiczna o łącznej mocy zainstalowanych paneli 26,79 kWp, będzie posadowiona na dachu budynku. Projektowana instalacja składa się z 94 szt. polikrystalicznych paneli fotowoltaicznych o mocy 285 W, wyposażonych w optymalizatory mocy oraz inwertera. Zadaniem projektowanej instalacji fotowoltaicznej jest wytworzenie energii elektrycznej o parametrach sieci elektroenergetycznej, a następnie zagospodarowanie jej w wewnętrznej instalacji elektrycznej przez odbiorcę. Etapy realizacji projektu: - złożenie wniosku o dofinansowanie - podpisanie umowy o dofinansowanie - wybór wykonawcy zgodnie z zasadą konkurencyjności - zawarcie umowy z wykonawcą i rozpoczęcie prac - realizacja prac zgodnie z założonym harmonogramem - zakończenie projektu i podpisanie protokołu końcowego - końcowe rozliczenie projektu Sposób wdrażania: -postępowanie konk. i podpisanie umowy -montaż instalacji-Sposób zamontowania inst.:syst. obciążeniowy nadachowy -odbiór instalacji -rozliczenie - f-ra końcowa, prot. potw. wskaźniki Projekt wpisuje się w założenia wpisane w SzOOP RPOWiM realizując założony cel: Zwiększony udział OZE w ogólnym bilansie energetycznym regionu. Realizacja poddziałania pozwoli na zwiększenie udziału energii odnawialnej w bilansie energ. przedsiębiorstwa, co wpłynie na zwiększenie udziału energii odnawialnej w bilansie energ. Regionu. Wpłynie to na ograniczenie emisji szkodliwych gazów i pyłów do atmosfery oraz dzięki wykorzystaniu lokalnych źródeł energii odnawialnej zwiększy konkurencyjnośćfirmy. W wyniku realizacji inwestycji spadną koszty związane z zużyciem energii. (Polish)
0 references
The applicant envisages the construction of a photovoltaic installation with a total capacity of 26.79 kWp installed panels, will be planted on the roof of the building. The designed installation consists of 94 units of polycrystalline photovoltaic panels with a power output of 285 W, equipped with power optimisation and inverter. The task of the designed photovoltaic installation is to generate electricity with the parameters of the electricity grid, and then to develop it in the internal electrical installation by the customer. Stages of project implementation: — submission of an application for funding – signing of a grant agreement – selection of the contractor in accordance with the principle of competitiveness – conclusion of an agreement with the contractor and commencement of works – implementation of works according to the planned schedule – completion of the project and signing of the final protocol – final settlement of the project Method of implementation: —conclusion and conclusion of the contract -Installation-Installation-Assembly method of mounting inst.:loading system – reception of the installation – settlement – final f-ra, protocol. indicators The project is inscribed in the assumptions entered in the Polish SzOOP by fulfilling the stated goal: Increased share of RES in the overall energy balance of the region. The implementation of the sub-measure will increase the share of renewable energy in the company’s energy balance, which will increase the share of renewable energy in the energy balance. It’s a region. This will reduce emissions of harmful gases and dust into the atmosphere and by using local renewable energy sources will increase the competitiveness of the company. The cost of energy consumption will fall as a result of the investment. (English)
21 October 2020
0 references
Identifiers
RPWM.04.01.00-28-0453/16
0 references