(Removed claim: summary (P836): The project consists of the construction of a photovoltaic power plant of up to 40 kW. The installation will be installed on the roof of a residential building located on plot No 152/44 located within the geodesic to Nibork No 11 in Kozak Mła, the municipality of Sorkurate, Warmińsko-Mazurskie Province. The applicant is the owner of the property on which the project will be carried out. The applicant has declared its intention to carry out the...) |
(Created claim: summary (P836): The project involves the construction of a photovoltaic power plant with a capacity of up to 40 kW. The installation will be installed on the roof of the Care House building, located on plot No 152/44, located within the geodesic area of Nibork No. 11 in Kozarek Mały, Sorkwity commune, Warmińsko-Mazurskie Voivodeship. The applicant owns the property on which the project will be implemented. The applicant has notified its intention to carry out c...) |
||||||||||||||
Property / summary | |||||||||||||||
The project involves the construction of a photovoltaic power plant with a capacity of up to 40 kW. The installation will be installed on the roof of the Care House building, located on plot No 152/44, located within the geodesic area of Nibork No. 11 in Kozarek Mały, Sorkwity commune, Warmińsko-Mazurskie Voivodeship. The applicant owns the property on which the project will be implemented. The applicant has notified its intention to carry out construction works. After signing the grant agreement, the applicant will select the contractor who will supply and install photovoltaic panels. The project fits into the assumptions set out in the SzOOP RPO WiM 2014-2020 i.e. thanks to the implementation of the investment, the share of RES in the overall energy balance of the region will be increased. Electricity will be produced from newly built RES installations and lower greenhouse gas emissions. Photovoltaic installation shall not exceed 2MWe/MWth. Energy will be used for its own needs. The beneficiary is an entrepreneur. (English) | |||||||||||||||
Property / summary: The project involves the construction of a photovoltaic power plant with a capacity of up to 40 kW. The installation will be installed on the roof of the Care House building, located on plot No 152/44, located within the geodesic area of Nibork No. 11 in Kozarek Mały, Sorkwity commune, Warmińsko-Mazurskie Voivodeship. The applicant owns the property on which the project will be implemented. The applicant has notified its intention to carry out construction works. After signing the grant agreement, the applicant will select the contractor who will supply and install photovoltaic panels. The project fits into the assumptions set out in the SzOOP RPO WiM 2014-2020 i.e. thanks to the implementation of the investment, the share of RES in the overall energy balance of the region will be increased. Electricity will be produced from newly built RES installations and lower greenhouse gas emissions. Photovoltaic installation shall not exceed 2MWe/MWth. Energy will be used for its own needs. The beneficiary is an entrepreneur. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The project involves the construction of a photovoltaic power plant with a capacity of up to 40 kW. The installation will be installed on the roof of the Care House building, located on plot No 152/44, located within the geodesic area of Nibork No. 11 in Kozarek Mały, Sorkwity commune, Warmińsko-Mazurskie Voivodeship. The applicant owns the property on which the project will be implemented. The applicant has notified its intention to carry out construction works. After signing the grant agreement, the applicant will select the contractor who will supply and install photovoltaic panels. The project fits into the assumptions set out in the SzOOP RPO WiM 2014-2020 i.e. thanks to the implementation of the investment, the share of RES in the overall energy balance of the region will be increased. Electricity will be produced from newly built RES installations and lower greenhouse gas emissions. Photovoltaic installation shall not exceed 2MWe/MWth. Energy will be used for its own needs. The beneficiary is an entrepreneur. (English) / qualifier | |||||||||||||||
point in time: 21 October 2020
|
Revision as of 16:36, 21 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Installation of 40 kW photovoltaic panels in a residential care unit for the elderly |
Project in Poland financed by DG Regio |
Statements
193,910.5 zloty
0 references
228,130.0 zloty
0 references
85.0 percent
0 references
3 October 2016
0 references
30 June 2018
0 references
INSTYTUT ROZWOJU SP. Z O.O.
0 references
Projekt polega na budowie elektrowni fotowoltaicznej o mocy do 40 kW. Instalacja zostanie zamontowana na dachu budynku Domu opieki, znajdującej się na działce nr 152/44, położonej w obrębie geodezyjnym Nibork nr 11 w miejscowości Kozarek Mały, gmina Sorkwity, województwo warmińsko-mazurskie. Wnioskodawca jest właścicielem nieruchomości, na której realizowany będzie projekt. Wnioskodawca zgłosił zamiar wykonania robót budowlanych. Po podpisaniu umowy o dofinansowanie Wnioskodawca wyłoni wykonawcę, który dostarczy i zamontuje panele fotowoltaiczne. Projekt wpisuje się w założenia określone w SzOOP RPO WiM 2014-2020 tj. dzięki realizacji inwestycji nastąpi zwiększenie udziału OZE w ogólnym bilansie energetycznym regionu. Nastąpi produkcja energii elektrycznej z nowo wybudowanych instalacji wykorzystujących OZE i spadek emisji gazów cieplarnianych. Instalacja fotowoltaiczna nie przekracza 2MWe/MWth. Energia będzie wykorzystywana na własne potrzeby. Beneficjentem jest przedsiębiorca. (Polish)
0 references
The project involves the construction of a photovoltaic power plant with a capacity of up to 40 kW. The installation will be installed on the roof of the Care House building, located on plot No 152/44, located within the geodesic area of Nibork No. 11 in Kozarek Mały, Sorkwity commune, Warmińsko-Mazurskie Voivodeship. The applicant owns the property on which the project will be implemented. The applicant has notified its intention to carry out construction works. After signing the grant agreement, the applicant will select the contractor who will supply and install photovoltaic panels. The project fits into the assumptions set out in the SzOOP RPO WiM 2014-2020 i.e. thanks to the implementation of the investment, the share of RES in the overall energy balance of the region will be increased. Electricity will be produced from newly built RES installations and lower greenhouse gas emissions. Photovoltaic installation shall not exceed 2MWe/MWth. Energy will be used for its own needs. The beneficiary is an entrepreneur. (English)
21 October 2020
0 references
Identifiers
RPWM.04.01.00-28-0443/16
0 references