Renewable energy sources to improve the environment — photovoltaics (Q131967): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The object of the project will be the installation of a photovoltaic installation on the building of Zakład Energetyki Cieplnej w Orzyz Sp. z o.o. (parcel No 90/4). An installation with a total capacity of 39,68 kWp on the roof of the building will be built. The installation will consist of 155 solar modules. The single module will achieve its rated power in the order of 250W. 5 inverters will cooperate with the modules. The generated network...) |
(Created claim: summary (P836): The subject of the project will be the installation of a photovoltaic installation on the building of Zakład Energetyki Cieplna in Orzysz Sp. z o.o. (No. 90/4 plot). An installation with a total power of 39.68 kWp will be built on the roofs of the building. The installation will consist of 155 photovoltaic modules. A single module will have a rated power of 250 W. The components working with the modules will be 5 inverters. The output voltage wi...) |
||||||||||||||
Property / summary | |||||||||||||||
The subject of the project will be the installation of a photovoltaic installation on the building of Zakład Energetyki Cieplna in Orzysz Sp. z o.o. (No. 90/4 plot). An installation with a total power of 39.68 kWp will be built on the roofs of the building. The installation will consist of 155 photovoltaic modules. A single module will have a rated power of 250 W. The components working with the modules will be 5 inverters. The output voltage will be 230V alternating current. The planned investment will be located on the roof of the building. Photovoltaic generators will cover an area of 202.2 m².Installations will be connected to the grid – type of installation on grid.The building covered by the project has an electrical connection and electrical connection conditions with a power greater than the planned installation. The investment will be implemented in different stages: preparation of a feasibility study and assessment of the potential of the investment, formal preparation, submission of applications for funding, selection of contractors in accordance with public procurement law, conclusion of contract with the contractor, technical preparation for installation assembly and assembly according to the planned timetable, testing and verification of the installation, completion of the project and signing of the final protocol, final settlement of the project, operation phase. The project is directly in line with the assumptions set out in SZOOP RPO WiM 2014-2020 i.e. “Increased share of RES in the overall energy balance of the region”. The project’s work is part of the types of projects planned for implementation under measure 4.1. The project will be implemented directly in SZOOP RPO WiM 2014-2020 indicators. The deployment of photovoltaic installations will contribute to reducing energy consumption from conventional sources, reducing CO2 emissions and other greenhouse gases. Thus, the implementation of the project will have a positive impact on the environment, while at the same time supporting economic growth and sustainable development. (English) | |||||||||||||||
Property / summary: The subject of the project will be the installation of a photovoltaic installation on the building of Zakład Energetyki Cieplna in Orzysz Sp. z o.o. (No. 90/4 plot). An installation with a total power of 39.68 kWp will be built on the roofs of the building. The installation will consist of 155 photovoltaic modules. A single module will have a rated power of 250 W. The components working with the modules will be 5 inverters. The output voltage will be 230V alternating current. The planned investment will be located on the roof of the building. Photovoltaic generators will cover an area of 202.2 m².Installations will be connected to the grid – type of installation on grid.The building covered by the project has an electrical connection and electrical connection conditions with a power greater than the planned installation. The investment will be implemented in different stages: preparation of a feasibility study and assessment of the potential of the investment, formal preparation, submission of applications for funding, selection of contractors in accordance with public procurement law, conclusion of contract with the contractor, technical preparation for installation assembly and assembly according to the planned timetable, testing and verification of the installation, completion of the project and signing of the final protocol, final settlement of the project, operation phase. The project is directly in line with the assumptions set out in SZOOP RPO WiM 2014-2020 i.e. “Increased share of RES in the overall energy balance of the region”. The project’s work is part of the types of projects planned for implementation under measure 4.1. The project will be implemented directly in SZOOP RPO WiM 2014-2020 indicators. The deployment of photovoltaic installations will contribute to reducing energy consumption from conventional sources, reducing CO2 emissions and other greenhouse gases. Thus, the implementation of the project will have a positive impact on the environment, while at the same time supporting economic growth and sustainable development. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The subject of the project will be the installation of a photovoltaic installation on the building of Zakład Energetyki Cieplna in Orzysz Sp. z o.o. (No. 90/4 plot). An installation with a total power of 39.68 kWp will be built on the roofs of the building. The installation will consist of 155 photovoltaic modules. A single module will have a rated power of 250 W. The components working with the modules will be 5 inverters. The output voltage will be 230V alternating current. The planned investment will be located on the roof of the building. Photovoltaic generators will cover an area of 202.2 m².Installations will be connected to the grid – type of installation on grid.The building covered by the project has an electrical connection and electrical connection conditions with a power greater than the planned installation. The investment will be implemented in different stages: preparation of a feasibility study and assessment of the potential of the investment, formal preparation, submission of applications for funding, selection of contractors in accordance with public procurement law, conclusion of contract with the contractor, technical preparation for installation assembly and assembly according to the planned timetable, testing and verification of the installation, completion of the project and signing of the final protocol, final settlement of the project, operation phase. The project is directly in line with the assumptions set out in SZOOP RPO WiM 2014-2020 i.e. “Increased share of RES in the overall energy balance of the region”. The project’s work is part of the types of projects planned for implementation under measure 4.1. The project will be implemented directly in SZOOP RPO WiM 2014-2020 indicators. The deployment of photovoltaic installations will contribute to reducing energy consumption from conventional sources, reducing CO2 emissions and other greenhouse gases. Thus, the implementation of the project will have a positive impact on the environment, while at the same time supporting economic growth and sustainable development. (English) / qualifier | |||||||||||||||
point in time: 21 October 2020
|
Revision as of 16:34, 21 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Renewable energy sources to improve the environment — photovoltaics |
Project in Poland financed by DG Regio |
Statements
191,906.2 zloty
0 references
225,772.0 zloty
0 references
85.0 percent
0 references
7 October 2016
0 references
31 December 2019
0 references
ZAKŁAD ENERGETYKI CIEPLNEJ W ORZYSZU SP. Z O.O.
0 references
Przedmiotem projektu, będzie montaż instalacji fotowoltaicznej na budynku Zakładu Energetyki Cieplnej w Orzyszu Sp. z o.o. (nr działki 90/4). Zostanie wybudowana instalacja o łącznej mocy 39,68 kWp na dachach budynku. W skład instalacji będzie wchodziło 155 modułów fotowoltaicznych. Pojedynczy moduł będzie osiągał moc znamionową rzędu 250W. Elementami współpracującymi z modułami będzie 5 falowników. Uzyskiwane napięcie sieciowe wyniesie 230V prądu przemiennego. Planowana inwestycja będzie ulokowana na dachu budynku. Generatory fotowoltaiczne zajmą powierzchnię 202,2m2.Instalacje zostaną podłączone do sieci - typ instalacji on grid.Budynek objęty projektem posiada przyłącze do sieci elektrycznej oraz elektryczne warunki przyłączenia do sieci o mocy większej niż moc planowanych instalacji. Inwestycja zostanie wdrożona w poszczególnych etapach: przygotowanie studium wykonalności i ocenienie potencjału inwestycji, przygotowanie formalne, złożenie wniosku o dofinansowanie, wybór wykonawców zgodnie z prawem zamówień publicznych, zawarcie umowy z wykonawcą, przygotowanie techniczne do montażu instalacji oraz montaż zgodnie z założonym harmonogramem, etap testowania i sprawdzanie instalacji, zakończenie projektu i podpisanie protokołu końcowego, końcowe rozliczenie projektu, etap eksploatacji. Projekt wpisuje się bezpośrednio w założenia określone w SZOOP RPO WiM 2014-2020 tj. „Zwiększony udział OZE w ogólnym bilansie energetycznym regionu”. Prace przewidziane w ramach projektu wpisują się w typy projektów przewidzianych do realizacji w ramach działania 4.1. Projekt bezpośrednio realizować będzie założone w SZOOP RPO WiM 2014-2020wskaźniki. Wdrożenie instalacji fotowoltaicznej przyczyni się do zmniejszenia zużycia energii pochodzącej ze źródeł konwencjonalnych, do obniżenia emisji CO2 i innych gazów cieplarnianych. Tym samym realizacja projektu będzie miała pozytywny wpływ na środowisko, jednocześnie wspierając wzrost gospodarczy i zrównoważony rozwój. (Polish)
0 references
The subject of the project will be the installation of a photovoltaic installation on the building of Zakład Energetyki Cieplna in Orzysz Sp. z o.o. (No. 90/4 plot). An installation with a total power of 39.68 kWp will be built on the roofs of the building. The installation will consist of 155 photovoltaic modules. A single module will have a rated power of 250 W. The components working with the modules will be 5 inverters. The output voltage will be 230V alternating current. The planned investment will be located on the roof of the building. Photovoltaic generators will cover an area of 202.2 m².Installations will be connected to the grid – type of installation on grid.The building covered by the project has an electrical connection and electrical connection conditions with a power greater than the planned installation. The investment will be implemented in different stages: preparation of a feasibility study and assessment of the potential of the investment, formal preparation, submission of applications for funding, selection of contractors in accordance with public procurement law, conclusion of contract with the contractor, technical preparation for installation assembly and assembly according to the planned timetable, testing and verification of the installation, completion of the project and signing of the final protocol, final settlement of the project, operation phase. The project is directly in line with the assumptions set out in SZOOP RPO WiM 2014-2020 i.e. “Increased share of RES in the overall energy balance of the region”. The project’s work is part of the types of projects planned for implementation under measure 4.1. The project will be implemented directly in SZOOP RPO WiM 2014-2020 indicators. The deployment of photovoltaic installations will contribute to reducing energy consumption from conventional sources, reducing CO2 emissions and other greenhouse gases. Thus, the implementation of the project will have a positive impact on the environment, while at the same time supporting economic growth and sustainable development. (English)
21 October 2020
0 references
Identifiers
RPWM.04.01.00-28-0364/16
0 references