Reconstruction of the school pitch with accompanying infrastructure for the School Team in Lubawa (Q132904): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The subject of the investment is the reconstruction of the degraded field (phase I): combination field (handball, basketball, volleyball, teis natural), carrying out an athletics track with t.160.0 m with a tread.60.0 m track, the execution of posts for the discipline of athletics. (the projection of the ball, stroke in the al and three stages), the performance of the ram, including the following: construction of bruises, made of lumps of dirt...)
(‎Created claim: summary (P836): The object of the investment is the reconstruction of the degraded pitch (Stage I): execution of multifunctional pitch (handball, basketball, volleyball, tennis), execution of a circular track track about 160.0 m with straight treadmill of 60.0 m, execution of positions for athletes. (shoot shot, long jump and triple jump), tribune execution, including: naves made of paving cubes, polyurethane naves, naves made of brick meal, naves made of natur...)
Property / summary
 
The object of the investment is the reconstruction of the degraded pitch (Stage I): execution of multifunctional pitch (handball, basketball, volleyball, tennis), execution of a circular track track about 160.0 m with straight treadmill of 60.0 m, execution of positions for athletes. (shoot shot, long jump and triple jump), tribune execution, including: naves made of paving cubes, polyurethane naves, naves made of brick meal, naves made of natural grass, equipment of the area with benches, waste baskets, construction of balls, assembly of part of the fence – for the needs of high school general. Scope of actions planned: preparatory work.(design doc.); study roster; Rob. Budowlane (scope of work IU); supervision in the project; promotion of the project. The aim of the project is to improve the quality of education in general through the construction of infrastructure allowing for appropriate adaptation of educational activities to the needs of the school, the local community and the needs of the changing labour market. The sport sector in Warmia and Mazury has a great potential in terms of employment and entrepreneurship and creating bridging social capital. The project, through the promotion of sport, activity and team activities, is important for combating poverty and social exclusion. It fits in with the goals of RPO WiM 2014-2020 in the prior axis.9. Access to high quality public services, OJ 9.3. Educational infrastructure, sub-doc.9.3.4 General education infrastructure. It pursues the objective of tem.10. Investing in education, skills and lifelong learning, investment priority10a. Investing in education, skills and lifelong learning through the development of education and training infrastructure, the objective in particular: improving the conditions of general education in support of key pupils’ skills. The School Complex in Lubawa includes the Secondary School, the General Education Secondary School for Adults, the Technical School and the Basic Vocational School. (English)
Property / summary: The object of the investment is the reconstruction of the degraded pitch (Stage I): execution of multifunctional pitch (handball, basketball, volleyball, tennis), execution of a circular track track about 160.0 m with straight treadmill of 60.0 m, execution of positions for athletes. (shoot shot, long jump and triple jump), tribune execution, including: naves made of paving cubes, polyurethane naves, naves made of brick meal, naves made of natural grass, equipment of the area with benches, waste baskets, construction of balls, assembly of part of the fence – for the needs of high school general. Scope of actions planned: preparatory work.(design doc.); study roster; Rob. Budowlane (scope of work IU); supervision in the project; promotion of the project. The aim of the project is to improve the quality of education in general through the construction of infrastructure allowing for appropriate adaptation of educational activities to the needs of the school, the local community and the needs of the changing labour market. The sport sector in Warmia and Mazury has a great potential in terms of employment and entrepreneurship and creating bridging social capital. The project, through the promotion of sport, activity and team activities, is important for combating poverty and social exclusion. It fits in with the goals of RPO WiM 2014-2020 in the prior axis.9. Access to high quality public services, OJ 9.3. Educational infrastructure, sub-doc.9.3.4 General education infrastructure. It pursues the objective of tem.10. Investing in education, skills and lifelong learning, investment priority10a. Investing in education, skills and lifelong learning through the development of education and training infrastructure, the objective in particular: improving the conditions of general education in support of key pupils’ skills. The School Complex in Lubawa includes the Secondary School, the General Education Secondary School for Adults, the Technical School and the Basic Vocational School. (English) / rank
 
Normal rank
Property / summary: The object of the investment is the reconstruction of the degraded pitch (Stage I): execution of multifunctional pitch (handball, basketball, volleyball, tennis), execution of a circular track track about 160.0 m with straight treadmill of 60.0 m, execution of positions for athletes. (shoot shot, long jump and triple jump), tribune execution, including: naves made of paving cubes, polyurethane naves, naves made of brick meal, naves made of natural grass, equipment of the area with benches, waste baskets, construction of balls, assembly of part of the fence – for the needs of high school general. Scope of actions planned: preparatory work.(design doc.); study roster; Rob. Budowlane (scope of work IU); supervision in the project; promotion of the project. The aim of the project is to improve the quality of education in general through the construction of infrastructure allowing for appropriate adaptation of educational activities to the needs of the school, the local community and the needs of the changing labour market. The sport sector in Warmia and Mazury has a great potential in terms of employment and entrepreneurship and creating bridging social capital. The project, through the promotion of sport, activity and team activities, is important for combating poverty and social exclusion. It fits in with the goals of RPO WiM 2014-2020 in the prior axis.9. Access to high quality public services, OJ 9.3. Educational infrastructure, sub-doc.9.3.4 General education infrastructure. It pursues the objective of tem.10. Investing in education, skills and lifelong learning, investment priority10a. Investing in education, skills and lifelong learning through the development of education and training infrastructure, the objective in particular: improving the conditions of general education in support of key pupils’ skills. The School Complex in Lubawa includes the Secondary School, the General Education Secondary School for Adults, the Technical School and the Basic Vocational School. (English) / qualifier
 
point in time: 21 October 2020
Timestamp+2020-10-21T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 16:20, 21 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Reconstruction of the school pitch with accompanying infrastructure for the School Team in Lubawa
Project in Poland financed by DG Regio

    Statements

    0 references
    829,779.22 zloty
    0 references
    199,147.01 Euro
    13 January 2020
    0 references
    999,854.46 zloty
    0 references
    239,965.07 Euro
    13 January 2020
    0 references
    82.99 percent
    0 references
    19 October 2016
    0 references
    29 October 2018
    0 references
    POWIAT IŁAWSKI
    0 references
    0 references

    53°30'1.8"N, 19°44'7.4"E
    0 references
    Przedmiotem inwestycji jest przebudowa zdegradowanego boiska (etap I): wykonanie boiska wielofunkcyjnego (piłka ręczna, piłka koszykowa, piłka siatkowa, tenis ziemny), wykonanie okrężnej bieżni lekkoatl. o dł.160,0m z bieżnią prostą o dł.60,0m, wykonanie stanowisk dla dyscyplin lekkoatl. (rzutnia do pchnięcia kulą, skocznia do skoku w dal i trójskoku), wykonanie trybuny, w tym: wykonanie naw. z kostki brukowej, naw. poliuretanowych, naw. z mączki ceglanej, naw. z trawy naturalnej, wyposażenie terenu w ławki, kosze na odpady, wykonanie piłkochwytów, montaż części ogrodzenia terenu-na potrzeby liceum ogólnokszt. Zakres planowanych działań: prace przygot.(dok. projektowa); studium wyk; rob.budowlane (zakres prac j.w.); nadzór w projekcie; promocja projektu. Projekt ma na celu podniesienie jakości kształcenia ogólnokszt. poprzez budowę infrastruktury pozwalającej na właściwe dopasowanie działań edukacyjnych do potrzeb szkoły, społeczności lokalnej oraz potrzeb zmieniającego się rynku pracy. Sektor sportowy na Warmii i Mazurach posiada bardzo duży potencjał w aspekcie zatrudnienia i przedsiębiorczości oraz tworzenia pomostowego kapitału społecznego. Projekt poprzez propagowanie sportu, aktywności i działań zespołowych ma istotne znaczenie w kontekście przeciwdziałania ubóstwu i wykluczeniu społecznemu. Wpisuje się w cele RPO WiM 2014-2020 w oś prior.9. Dostęp do wysokiej jakości usług publicznych, dz.9.3. Infrastruktura edukacyjna, poddz.9.3.4 Infrastruktura kształcenia ogólnokształcącego. Realizuje cel tem.10. Inwestowanie w edukację, umiejętności i uczenie się przez całe życie, priorytet inwest.10a. Inwestowanie w edukację, umiejętności i uczenie się przez całe życie poprzez rozwój infrastruktury edukacyjnej i szkoleniowej, cel szczeg.: poprawa warunków edukacji ogólnokształcącej wspierającej umiejętności kluczowe uczniów. W skład Zespołu Szkół w Lubawie wchodzi Liceum Ogólnokształcące, Liceum Ogólnokształcące dla Dorosłych, Technikum, Zasadnicza Szkoła Zawodowa. (Polish)
    0 references
    The object of the investment is the reconstruction of the degraded pitch (Stage I): execution of multifunctional pitch (handball, basketball, volleyball, tennis), execution of a circular track track about 160.0 m with straight treadmill of 60.0 m, execution of positions for athletes. (shoot shot, long jump and triple jump), tribune execution, including: naves made of paving cubes, polyurethane naves, naves made of brick meal, naves made of natural grass, equipment of the area with benches, waste baskets, construction of balls, assembly of part of the fence – for the needs of high school general. Scope of actions planned: preparatory work.(design doc.); study roster; Rob. Budowlane (scope of work IU); supervision in the project; promotion of the project. The aim of the project is to improve the quality of education in general through the construction of infrastructure allowing for appropriate adaptation of educational activities to the needs of the school, the local community and the needs of the changing labour market. The sport sector in Warmia and Mazury has a great potential in terms of employment and entrepreneurship and creating bridging social capital. The project, through the promotion of sport, activity and team activities, is important for combating poverty and social exclusion. It fits in with the goals of RPO WiM 2014-2020 in the prior axis.9. Access to high quality public services, OJ 9.3. Educational infrastructure, sub-doc.9.3.4 General education infrastructure. It pursues the objective of tem.10. Investing in education, skills and lifelong learning, investment priority10a. Investing in education, skills and lifelong learning through the development of education and training infrastructure, the objective in particular: improving the conditions of general education in support of key pupils’ skills. The School Complex in Lubawa includes the Secondary School, the General Education Secondary School for Adults, the Technical School and the Basic Vocational School. (English)
    21 October 2020
    0 references

    Identifiers

    RPWM.09.03.04-28-0015/17
    0 references