(‎Removed claim: summary (P836): The project envisages the construction of a sewerage network in the Old Town of the Old Town, Żdżary and Barczywos.Na Żdżary is planned to build a 1708 mb sanitary sewerage network with PVC pipes — U 200/5.9 mm SN 8,428 mb, a sewer network with EP pipes 100 RC tricycle. SDR 17 PN 1 090 mm, 153 mb side branch of PVC pipes — U 160/4, 7 mm SN 8, 1 underground sewage pumping station and 47 borejunction. SDR 17 PN 1 090 mm, 266 mb side branch of PV...)
(‎Created claim: summary (P836): The project plans to build a sanitary sewer system in the Agglomeration Stare Miasto, the town of Żjary and Barczygłów.In the area of Żjary, it is planned to build 1708 mb of the sewage system made of gravitational sanitary pipes PVC – U 200/5.9 mm SN 8.428 m, a pipe drainage system PE 100 RC triwar. SDR 17 PN 1090 mm, 153 mb side branches from PVC-U 160/4, 7 mm SN 8, 1 underground sewage pumping station and 47 side branches.In the area of Barcz...)
Property / summary
 
The project plans to build a sanitary sewer system in the Agglomeration Stare Miasto, the town of Żjary and Barczygłów.In the area of Żjary, it is planned to build 1708 mb of the sewage system made of gravitational sanitary pipes PVC – U 200/5.9 mm SN 8.428 m, a pipe drainage system PE 100 RC triwar. SDR 17 PN 1090 mm, 153 mb side branches from PVC-U 160/4, 7 mm SN 8, 1 underground sewage pumping station and 47 side branches.In the area of Barczygłów there will be 1065 m of the sewer system of the gravitational sanitary pipes KAM 200 mm, 14 m of the exhaust drainage system from PE 100 RC triwar pipes. SDR 17 PN 1090 mm, 266 mb side branches from PVC pipes – U 160/4, 7 mm SN 8, 5 underground sewage pumping plants and 59 side branches.The planned actions will contribute to the project’s goal of preserving and protecting the environment and supporting resource efficiency. The task of the designed sanitary sewage system is to organise the sewage management of Stare Miasto commune, prevent uncontrolled discharge of sewage into land and watercourses and liquidate wastewater.The construction works will be carried out as part of the tasks “Construction of sewage networks – Żjara” and “Construction of sewage network – Barczygłów”. Moreover, the project provides for the implementation of the tasks “Investor Supervision” and “Information and Promotion”, which are necessary to ensure proper implementation of the investment and fulfil the information obligations of the beneficiary.As a result of the project’s implementation in 2020, the “Length of built sanitary sewage system” – 3.634 km will be achieved. (English)
Property / summary: The project plans to build a sanitary sewer system in the Agglomeration Stare Miasto, the town of Żjary and Barczygłów.In the area of Żjary, it is planned to build 1708 mb of the sewage system made of gravitational sanitary pipes PVC – U 200/5.9 mm SN 8.428 m, a pipe drainage system PE 100 RC triwar. SDR 17 PN 1090 mm, 153 mb side branches from PVC-U 160/4, 7 mm SN 8, 1 underground sewage pumping station and 47 side branches.In the area of Barczygłów there will be 1065 m of the sewer system of the gravitational sanitary pipes KAM 200 mm, 14 m of the exhaust drainage system from PE 100 RC triwar pipes. SDR 17 PN 1090 mm, 266 mb side branches from PVC pipes – U 160/4, 7 mm SN 8, 5 underground sewage pumping plants and 59 side branches.The planned actions will contribute to the project’s goal of preserving and protecting the environment and supporting resource efficiency. The task of the designed sanitary sewage system is to organise the sewage management of Stare Miasto commune, prevent uncontrolled discharge of sewage into land and watercourses and liquidate wastewater.The construction works will be carried out as part of the tasks “Construction of sewage networks – Żjara” and “Construction of sewage network – Barczygłów”. Moreover, the project provides for the implementation of the tasks “Investor Supervision” and “Information and Promotion”, which are necessary to ensure proper implementation of the investment and fulfil the information obligations of the beneficiary.As a result of the project’s implementation in 2020, the “Length of built sanitary sewage system” – 3.634 km will be achieved. (English) / rank
 
Normal rank
Property / summary: The project plans to build a sanitary sewer system in the Agglomeration Stare Miasto, the town of Żjary and Barczygłów.In the area of Żjary, it is planned to build 1708 mb of the sewage system made of gravitational sanitary pipes PVC – U 200/5.9 mm SN 8.428 m, a pipe drainage system PE 100 RC triwar. SDR 17 PN 1090 mm, 153 mb side branches from PVC-U 160/4, 7 mm SN 8, 1 underground sewage pumping station and 47 side branches.In the area of Barczygłów there will be 1065 m of the sewer system of the gravitational sanitary pipes KAM 200 mm, 14 m of the exhaust drainage system from PE 100 RC triwar pipes. SDR 17 PN 1090 mm, 266 mb side branches from PVC pipes – U 160/4, 7 mm SN 8, 5 underground sewage pumping plants and 59 side branches.The planned actions will contribute to the project’s goal of preserving and protecting the environment and supporting resource efficiency. The task of the designed sanitary sewage system is to organise the sewage management of Stare Miasto commune, prevent uncontrolled discharge of sewage into land and watercourses and liquidate wastewater.The construction works will be carried out as part of the tasks “Construction of sewage networks – Żjara” and “Construction of sewage network – Barczygłów”. Moreover, the project provides for the implementation of the tasks “Investor Supervision” and “Information and Promotion”, which are necessary to ensure proper implementation of the investment and fulfil the information obligations of the beneficiary.As a result of the project’s implementation in 2020, the “Length of built sanitary sewage system” – 3.634 km will be achieved. (English) / qualifier
 
point in time: 21 October 2020
Timestamp+2020-10-21T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 16:19, 21 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
“Construction of a sewerage network in the Old Town of the Old Town, Żdżary and Barczykheads”
Project in Poland financed by DG Regio

    Statements

    0 references
    1,834,372.31 zloty
    0 references
    440,249.35 Euro
    13 January 2020
    0 references
    2,158,085.08 zloty
    0 references
    517,940.42 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    3 February 2020
    0 references
    31 December 2020
    0 references
    GMINA STARE MIASTO
    0 references
    W ramach projektu planuje się budowę sieci kanalizacji sanitarnej na terenie Aglomeracji Stare Miasto, miejscowości Żdżary i Barczygłów.Na terenie miejscowości Żdżary planuje się wybudowanie 1708 mb sieci kanalizacji sanitarnej grawitacyjnej z rur PVC –U 200/5,9 mm SN 8,428 mb, sieci kanalizacji tłocznej z rur PE 100 RC trójwar. SDR 17 PN 10 90 mm, 153 mb odgałęzień bocznych z rur PVC –U 160/4, 7 mm SN 8, 1 podziemną przepompownię ścieków oraz 47 odgałęzień bocznych.Na terenie miejscowości Barczygłów powstanie natomiast 1065 mb sieci kanalizacji sanitarnej grawitacyjnej z rur KAM 200 mm, 14 mb sieci kanalizacji tłocznej z rur PE 100 RC trójwar. SDR 17 PN 10 90 mm, 266 mb odgałęzień bocznych z rur PVC – U 160/4, 7 mm SN 8, 5 podziemnych przepompowni ścieków oraz 59 odgałęzień bocznych.Przewidziane działania przyczynią się do osiągnięcia celu projektu, jakim jest zachowanie i ochrona środowiska naturalnego oraz wspieranie efektywnego gospodarowania zasobami. Zadaniem projektowanej kanalizacji sanitarnej jest uporządkowanie gospodarki ściekowej Gminy Stare Miasto, zapobiec niekontrolowanemu zrzutowi ścieków do gruntu i cieków wodnych oraz likwidacji zbiorników na ścieki.Roboty budowlane zostaną przeprowadzone w ramach zadań "Budowa sieci kanalizacji - Żdżary" oraz "Budowa sieci kanalizacyjnej - Barczygłów". Ponadto w ramach projektu przewidziano realizację zadań "Nadzór inwestorski" oraz "Informacja i promocja", które są niezbędne do zapewnienia prawidłowego wdrożenia inwestycji oraz wypełnienia obowiązków informacyjnych Beneficjenta.W efekcie realizacji projektu w 2020 r. osiągnięty zostanie wskaźnik produktu "Długość wybudowanej kanalizacji sanitarnej" - 3,634 km (Polish)
    0 references
    The project plans to build a sanitary sewer system in the Agglomeration Stare Miasto, the town of Żjary and Barczygłów.In the area of Żjary, it is planned to build 1708 mb of the sewage system made of gravitational sanitary pipes PVC – U 200/5.9 mm SN 8.428 m, a pipe drainage system PE 100 RC triwar. SDR 17 PN 1090 mm, 153 mb side branches from PVC-U 160/4, 7 mm SN 8, 1 underground sewage pumping station and 47 side branches.In the area of Barczygłów there will be 1065 m of the sewer system of the gravitational sanitary pipes KAM 200 mm, 14 m of the exhaust drainage system from PE 100 RC triwar pipes. SDR 17 PN 1090 mm, 266 mb side branches from PVC pipes – U 160/4, 7 mm SN 8, 5 underground sewage pumping plants and 59 side branches.The planned actions will contribute to the project’s goal of preserving and protecting the environment and supporting resource efficiency. The task of the designed sanitary sewage system is to organise the sewage management of Stare Miasto commune, prevent uncontrolled discharge of sewage into land and watercourses and liquidate wastewater.The construction works will be carried out as part of the tasks “Construction of sewage networks – Żjara” and “Construction of sewage network – Barczygłów”. Moreover, the project provides for the implementation of the tasks “Investor Supervision” and “Information and Promotion”, which are necessary to ensure proper implementation of the investment and fulfil the information obligations of the beneficiary.As a result of the project’s implementation in 2020, the “Length of built sanitary sewage system” – 3.634 km will be achieved. (English)
    21 October 2020
    0 references

    Identifiers

    RPWP.04.03.01-30-0030/17
    0 references