(‎Removed claim: summary (P836): The project will be carried out in the wake of the project. the beneficiary project is Gm.Sommn.o.In the context of the sub-measure 4.3.1Gm.Sompolno, it plans to realise the investment of 6 429.1 m of a sewerage network on the Mąko/Sycevo-Sompono route, which makes it possible to exclude waste water from waste water in Mąkolni.In the Gm.Sompolno agglomeration is formed of Sompono.Equivalent of the inhabitants for the aglom.Sompolno. the extent...)
(‎Created claim: summary (P836): The project will be implemented in the area of woj.wlkp.The beneficiary of the project is Gm.Sompolno.As part of sub-measure 4.3.1Gm.Sompolno plans to carry out an investment consisting of the construction of 6429.1 m sewage network on the Mąkolno-Sycewo-Sycewo route. The specific purpose of the sub-measure is the increased proportion of the population using the sewage treatment system.The scope of the project includes: sanitary canalisation wit...)
Property / summary
 
The project will be implemented in the area of woj.wlkp.The beneficiary of the project is Gm.Sompolno.As part of sub-measure 4.3.1Gm.Sompolno plans to carry out an investment consisting of the construction of 6429.1 m sewage network on the Mąkolno-Sycewo-Sycewo route. The specific purpose of the sub-measure is the increased proportion of the population using the sewage treatment system.The scope of the project includes: sanitary canalisation with a total length of 1.855 km of sanitary channels in the form of gravitational pipelines.(PVV pipes):d=200 mm long 618.10 m,d=315 mm with length of 1014.00 m. from 425 mm to 425 mm of the piece of work, in order to be able to make the floor of the interior, there will be a minimum of 425 mm of the interior of which, in order to ensure that it is not available, there will be a lot of time in the interior of the interior. (English)
Property / summary: The project will be implemented in the area of woj.wlkp.The beneficiary of the project is Gm.Sompolno.As part of sub-measure 4.3.1Gm.Sompolno plans to carry out an investment consisting of the construction of 6429.1 m sewage network on the Mąkolno-Sycewo-Sycewo route. The specific purpose of the sub-measure is the increased proportion of the population using the sewage treatment system.The scope of the project includes: sanitary canalisation with a total length of 1.855 km of sanitary channels in the form of gravitational pipelines.(PVV pipes):d=200 mm long 618.10 m,d=315 mm with length of 1014.00 m. from 425 mm to 425 mm of the piece of work, in order to be able to make the floor of the interior, there will be a minimum of 425 mm of the interior of which, in order to ensure that it is not available, there will be a lot of time in the interior of the interior. (English) / rank
 
Normal rank
Property / summary: The project will be implemented in the area of woj.wlkp.The beneficiary of the project is Gm.Sompolno.As part of sub-measure 4.3.1Gm.Sompolno plans to carry out an investment consisting of the construction of 6429.1 m sewage network on the Mąkolno-Sycewo-Sycewo route. The specific purpose of the sub-measure is the increased proportion of the population using the sewage treatment system.The scope of the project includes: sanitary canalisation with a total length of 1.855 km of sanitary channels in the form of gravitational pipelines.(PVV pipes):d=200 mm long 618.10 m,d=315 mm with length of 1014.00 m. from 425 mm to 425 mm of the piece of work, in order to be able to make the floor of the interior, there will be a minimum of 425 mm of the interior of which, in order to ensure that it is not available, there will be a lot of time in the interior of the interior. (English) / qualifier
 
point in time: 21 October 2020
Timestamp+2020-10-21T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 16:19, 21 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Construction of a sewage system on the route Mąkono — Sycevo — Sompolno, to allow the waste water treatment plant to be excluded from the operation of the sewage treatment plant at Mokoly.
Project in Poland financed by DG Regio

    Statements

    0 references
    2,359,940.19 zloty
    0 references
    566,385.65 Euro
    13 January 2020
    0 references
    2,776,400.24 zloty
    0 references
    666,336.06 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    4 March 2015
    0 references
    11 September 2018
    0 references
    GMINA SOMPOLNO
    0 references
    Projekt będzie realizowany na terenie woj.wlkp.Beneficjentem projektu jest Gm.Sompolno.W ramach poddziałania 4.3.1Gm.Sompolno planuje zrealizować inwestycję polegającą na budowie 6429,1 m sieci kanaliz.sanitarnej na trasie Mąkolno–Sycewo–Sompolno,umożliwiającej wyłączenie z eksploatacji oczyszcz.ścieków w Mąkolnie.Na terenie Gm.Sompolno utworzona jest Aglomeracja Sompolno.Równoważna liczba mieszkańców dla aglom.Sompolno wynosi 4 779 RLM.Aglomeracja swoim zasięgiem obejmuje miejsc:Sompol. Biele,Mąkolno,Mostki,Lubstów i Sycewo.Celem szczegółowym poddziałania jest zwiększony odsetek ludności korzystających z systemu oczyszczania ścieków.Zakres projektu obejmuje:Kanalizację sanitarną o łącznej dł.1,855 km kanałów sanit.w postaci rurociągów grawit.(rury PCV):d=200 mm o dł.618,10 m,d=315 mm o dł.1014,00 m. W tym odgałęzienia boczne:d=160 mm o dł.223,00 m •Rurociągi tłocz.(rury PE): dz=140 mm o dł.1285,00 mdz=160 mm o dł.3289,00 m• Studnie kanaliz. rewizyjne i studzienki przyłącz.:-28 szt.studni PVC d=425 mm-37 szt.studni beton.i żelbet.d=1200 mm-6 szt.studni beton.odpowietrzająco-płuczących d=1200 mm-4 szt.studni beton.spustowo-płuczących d=1200 mm-4 szt.studni beton. zaworowych d=1200 mm-2 szt.studni rozprężnych beton. d=1200 mm• 2 przepompownie ściekówRealizacja inwestycji której dotyczy projekt umożliwi uniknięcie kosztów związanych z modernizacją nieefektywnej oczyszcz.ścieków w Mąkolnie oraz przyczyni się do wyeliminowania istniejących przydomowych zbiorników wybieralnych ścieków sanitarnych i niekontrolowanych rozsączeń do gruntu.Odbiorcą projektu będą:mieszkańcy,którzy zostaną podłączeni do sieci kanalizacyjnej z miejscowości Mąkolno,Sycewo,Sompolno,PUK w Sompolnie zarządzając nowopowstałą infrastrukturą kanalizacyjną.W ramach projektu beneficjent planuje ponieść koszty:Zad.1.dokumentacja kosztorysowo projektowa(41820 zł),Zad.2.studium wykonalności(14760 zł), Zad.3 roboty budowlane(4366500,00), Zad.4 inspektor nadzoru (44895,00 zł),Zadanie 5. promocja(3567,3 zł). (Polish)
    0 references
    The project will be implemented in the area of woj.wlkp.The beneficiary of the project is Gm.Sompolno.As part of sub-measure 4.3.1Gm.Sompolno plans to carry out an investment consisting of the construction of 6429.1 m sewage network on the Mąkolno-Sycewo-Sycewo route. The specific purpose of the sub-measure is the increased proportion of the population using the sewage treatment system.The scope of the project includes: sanitary canalisation with a total length of 1.855 km of sanitary channels in the form of gravitational pipelines.(PVV pipes):d=200 mm long 618.10 m,d=315 mm with length of 1014.00 m. from 425 mm to 425 mm of the piece of work, in order to be able to make the floor of the interior, there will be a minimum of 425 mm of the interior of which, in order to ensure that it is not available, there will be a lot of time in the interior of the interior. (English)
    21 October 2020
    0 references

    Identifiers

    RPWP.04.03.01-30-0012/16
    0 references