Construction of the sanitary sewage system in Sławoszew, Parzew Valley (Q135014): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The project ‘Construction of a sewerage system in Sławoszew, Parzew Liglin’ project will be carried out in the municipality of Kotlin, in the county district, in Kilkp.The number of inhabitants covered by the survey will be 581 people, including 402 residents of the Kotlin agglomeration and 179 people living outside Kotlin. In addition, a large food processing plant will be connected to the network. The projected volume of waste water from the...)
(‎Created claim: summary (P836): The project “Construction of sanitary sewage system in the village of Sławoszew, Parzew Gm. Kotlin” will be carried out in the commune of Kotlin, in Jarocin County, in the voivodeship wlkp.The number of inhabitants covered by the canalisation will be 581 people, including 402 people living in the Kotlin agglomeration and 179 people living outside the Kotlin agglomeration. In addition, a large food processing plant will be connected to the networ...)
Property / summary
 
The project “Construction of sanitary sewage system in the village of Sławoszew, Parzew Gm. Kotlin” will be carried out in the commune of Kotlin, in Jarocin County, in the voivodeship wlkp.The number of inhabitants covered by the canalisation will be 581 people, including 402 people living in the Kotlin agglomeration and 179 people living outside the Kotlin agglomeration. In addition, a large food processing plant will be connected to the network. The estimated amount of sewage from the project area will be about Qśrd = 170 m³/d. The length of the built gravitational channels will be 7511 m, pressure 4074 m, connections of 1288 m – 155 pcs, including Qualified sections (located in the Kotlin agglomeration) are: gravitational: 3496 m, pressure: 852 m, connection 879 m – 112 pcs. On the other hand, sections located outside the Kotlin agglomeration represent: gravitational: 4015 m, pressure: 3222 m, connection 409 m – 43 pcs. The construction of 8 units of sewage pumping plant is planned: 7 network units (including 4 located in the Kotlin agglomeration) and 1 at home.The projects are completely drained, but do not have an aggregate sewage system. The lack of sewerage causes significant environmental risks and limits the development of housing. The construction of a sanitary sewer system will allow the liquidation of existing waste water tanks.Direct beneficiaries The undertakings will be residents and entrepreneurs from Sławoszew and Parzew, who, thanks to the effects connected with the construction of sewage systems, will be able to enjoy a clean and safe environment, which at the same time fits into the idea of sustainable development. It is also very important that the construction of the network will be an important argument for choosing these scanned areas as a place for new economic investments. This is particularly important in the rural Kotlin commune – remote from large cities.Product ratio achieved as a result of the project in 2020:- Length of built sanitary sewage system – 5.227 km (English)
Property / summary: The project “Construction of sanitary sewage system in the village of Sławoszew, Parzew Gm. Kotlin” will be carried out in the commune of Kotlin, in Jarocin County, in the voivodeship wlkp.The number of inhabitants covered by the canalisation will be 581 people, including 402 people living in the Kotlin agglomeration and 179 people living outside the Kotlin agglomeration. In addition, a large food processing plant will be connected to the network. The estimated amount of sewage from the project area will be about Qśrd = 170 m³/d. The length of the built gravitational channels will be 7511 m, pressure 4074 m, connections of 1288 m – 155 pcs, including Qualified sections (located in the Kotlin agglomeration) are: gravitational: 3496 m, pressure: 852 m, connection 879 m – 112 pcs. On the other hand, sections located outside the Kotlin agglomeration represent: gravitational: 4015 m, pressure: 3222 m, connection 409 m – 43 pcs. The construction of 8 units of sewage pumping plant is planned: 7 network units (including 4 located in the Kotlin agglomeration) and 1 at home.The projects are completely drained, but do not have an aggregate sewage system. The lack of sewerage causes significant environmental risks and limits the development of housing. The construction of a sanitary sewer system will allow the liquidation of existing waste water tanks.Direct beneficiaries The undertakings will be residents and entrepreneurs from Sławoszew and Parzew, who, thanks to the effects connected with the construction of sewage systems, will be able to enjoy a clean and safe environment, which at the same time fits into the idea of sustainable development. It is also very important that the construction of the network will be an important argument for choosing these scanned areas as a place for new economic investments. This is particularly important in the rural Kotlin commune – remote from large cities.Product ratio achieved as a result of the project in 2020:- Length of built sanitary sewage system – 5.227 km (English) / rank
 
Normal rank
Property / summary: The project “Construction of sanitary sewage system in the village of Sławoszew, Parzew Gm. Kotlin” will be carried out in the commune of Kotlin, in Jarocin County, in the voivodeship wlkp.The number of inhabitants covered by the canalisation will be 581 people, including 402 people living in the Kotlin agglomeration and 179 people living outside the Kotlin agglomeration. In addition, a large food processing plant will be connected to the network. The estimated amount of sewage from the project area will be about Qśrd = 170 m³/d. The length of the built gravitational channels will be 7511 m, pressure 4074 m, connections of 1288 m – 155 pcs, including Qualified sections (located in the Kotlin agglomeration) are: gravitational: 3496 m, pressure: 852 m, connection 879 m – 112 pcs. On the other hand, sections located outside the Kotlin agglomeration represent: gravitational: 4015 m, pressure: 3222 m, connection 409 m – 43 pcs. The construction of 8 units of sewage pumping plant is planned: 7 network units (including 4 located in the Kotlin agglomeration) and 1 at home.The projects are completely drained, but do not have an aggregate sewage system. The lack of sewerage causes significant environmental risks and limits the development of housing. The construction of a sanitary sewer system will allow the liquidation of existing waste water tanks.Direct beneficiaries The undertakings will be residents and entrepreneurs from Sławoszew and Parzew, who, thanks to the effects connected with the construction of sewage systems, will be able to enjoy a clean and safe environment, which at the same time fits into the idea of sustainable development. It is also very important that the construction of the network will be an important argument for choosing these scanned areas as a place for new economic investments. This is particularly important in the rural Kotlin commune – remote from large cities.Product ratio achieved as a result of the project in 2020:- Length of built sanitary sewage system – 5.227 km (English) / qualifier
 
point in time: 21 October 2020
Timestamp+2020-10-21T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 16:18, 21 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Construction of the sanitary sewage system in Sławoszew, Parzew Valley
Project in Poland financed by DG Regio

    Statements

    0 references
    2,176,184.07 zloty
    0 references
    522,284.18 Euro
    13 January 2020
    0 references
    2,560,216.57 zloty
    0 references
    614,451.98 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    24 January 2019
    0 references
    28 December 2020
    0 references
    GMINA KOTLIN
    0 references
    0 references
    Projekt „Budowa kanalizacji sanitarnej we wsi Sławoszew, Parzew gm. Kotlin" realizowany będzie w gminie Kotlin, w powiecie jarocińskim, w woj. wlkp.Liczba mieszkańców objętych skanalizowaniem wyniesie 581 osób, w tym 402 osoby zamieszkujące teren aglomeracji Kotlin oraz 179 osób zamieszkujących poza aglomeracją Kotlin. Dodatkowo podłączony do sieci zostanie duży zakład przetwórstwa spożywczego. Przewidywana ilość ścieków z terenu objętego projektem wyniesie około Qśrd = 170 m3/d. Długość wybudowanych kanałów grawitacyjnych wyniesie 7511 m, ciśnieniowych 4074 m, przyłącza 1288 m - 155 szt, w tym odcinki kwalfikowane (położone w aglomeracji Kotlin) stanowią: grawitacyjne: 3496 m, ciśnieniowe: 852 m, przyłącza 879 m - 112 szt. Odcinki położone poza aglomeracją Kotlin stanowią natomiast: grawitacyjne: 4015 m, ciśnieniowe: 3222 m, przyłącza 409 m - 43 szt. Przewiduje się budowę 8 szt. przepompowni ścieków: 7 szt. sieciowych (w tym 4 połozone na terenie aglomeracji Kotlin) oraz 1 przydomowa.Miejscowości objęte projektem są całkowicie zwodociągowane, lecz nie posiadają zbiorczego systemu odprowadzania ścieków. Brak kanalizacji powoduje duże zagrożenia dla środowiska naturalnego i ogranicza rozwój budownictwa mieszkaniowego. Budowa sieci kanalizacji sanitarnej pozwoli na likwidację istniejących zbiorników bezodpływowych.Beneficjentami bezpośrednimi Przedsięwzięcia będą mieszkańcy i przedsiębiorcy z miejscowości Sławoszew oraz Parzew, którzy dzięki efektom związanym z budową kanalizacji będą mogli cieszyć się czystym i bezpiecznym środowiskiem naturalnym, co jednocześnie wpisuje się w ideę zrównoważonego rozwoju. Bardzo istotne jest przy tym, iż budowa sieci będzie istotnym argumentem za wyborem tych skanalizowanych obszarów, jako miejsca na nowe inwestycje gospodarcze. Jest to szczególnie istotne w wiejskiej Gminie Kotlin - oddalonej od dużych miast.Wskaźnik produktu osiągnięty w wyniku realizacji projektu w 2020 r.:- Długość wybudowanej kanalizacji sanitarnej – 5,227 km (Polish)
    0 references
    The project “Construction of sanitary sewage system in the village of Sławoszew, Parzew Gm. Kotlin” will be carried out in the commune of Kotlin, in Jarocin County, in the voivodeship wlkp.The number of inhabitants covered by the canalisation will be 581 people, including 402 people living in the Kotlin agglomeration and 179 people living outside the Kotlin agglomeration. In addition, a large food processing plant will be connected to the network. The estimated amount of sewage from the project area will be about Qśrd = 170 m³/d. The length of the built gravitational channels will be 7511 m, pressure 4074 m, connections of 1288 m – 155 pcs, including Qualified sections (located in the Kotlin agglomeration) are: gravitational: 3496 m, pressure: 852 m, connection 879 m – 112 pcs. On the other hand, sections located outside the Kotlin agglomeration represent: gravitational: 4015 m, pressure: 3222 m, connection 409 m – 43 pcs. The construction of 8 units of sewage pumping plant is planned: 7 network units (including 4 located in the Kotlin agglomeration) and 1 at home.The projects are completely drained, but do not have an aggregate sewage system. The lack of sewerage causes significant environmental risks and limits the development of housing. The construction of a sanitary sewer system will allow the liquidation of existing waste water tanks.Direct beneficiaries The undertakings will be residents and entrepreneurs from Sławoszew and Parzew, who, thanks to the effects connected with the construction of sewage systems, will be able to enjoy a clean and safe environment, which at the same time fits into the idea of sustainable development. It is also very important that the construction of the network will be an important argument for choosing these scanned areas as a place for new economic investments. This is particularly important in the rural Kotlin commune – remote from large cities.Product ratio achieved as a result of the project in 2020:- Length of built sanitary sewage system – 5.227 km (English)
    21 October 2020
    0 references

    Identifiers

    RPWP.04.03.01-30-0006/18
    0 references