RES investments in PHU Katarzyna Zięba (Q131842): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Fixing rounding issue) |
(Removed claim: summary (P836): SUBJECT OF THE ACTION: Construction of 2 photovoltaic installations on the Applicant’s plots, at the premises of the Applicant, in the locations of the business premises (11-300 Biskupiec, pow. Olsztyński, Warminsko-Mazurskie), i.e.: 1. Biskoven, Adamowo 5, dz. 133/3 (reference number of the parcel: 281402_5.0027.133/3) 2. Biskupiec ul. 1-go Maja 19b, dz.: 65/8 (reference number of the parcel: 281402_4.0004.65/8) The characteristics of both in...) |
||
Property / summary | |||
Property / summary: SUBJECT OF THE ACTION: Construction of 2 photovoltaic installations on the Applicant’s plots, at the premises of the Applicant, in the locations of the business premises (11-300 Biskupiec, pow. Olsztyński, Warminsko-Mazurskie), i.e.: 1. Biskoven, Adamowo 5, dz. 133/3 (reference number of the parcel: 281402_5.0027.133/3) 2. Biskupiec ul. 1-go Maja 19b, dz.: 65/8 (reference number of the parcel: 281402_4.0004.65/8) The characteristics of both installations: A 19.8 kW solar photovoltaic installation on the roof of the building — panels PV mono-crystalline 300W in 66 units — The installation, which is embedded in a steel structure combined with a stelake under the photovoltaic panels, is designed to generate electricity for the parameters of the electricity grid and then to install it in the internal electrical installation by the customer. THE PHASES OF THE IMPLEMENTATION OF THE PROJECT: — submission of an application for the award of the contract — signing of the contract for the award of the contract — selecting the contractor in accordance with the principle of competitiveness — conclusion of the contract with the contractor and start of works — implementation of the works in accordance with the planned timetable — completion of the project and signature of the final protocol — final statement of the project drawn up by the project: — selecting the contractor in accordance with the principle of competitiveness — signing of the contract with the contractor — installation of the installation — signature of the project, signature of the final protocol, final payment of the project is part of the assumption entered in the Szocm of the ROP WiM as follows: Increased RES share in the region’s overall energy balance. The implementation of the Sub-Action will increase the share of renewable energy in the energy balance of the applicant, which will increase the share of renewable energy in the energy mix. The region. This will reduce the emissions of harmful gases and dusts into the atmosphere and increase the competitiveness of the region through the use of indigenous renewable energy sources. Energy consumption will decrease as a result of investments (English) / rank | |||
Revision as of 16:16, 21 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | RES investments in PHU Katarzyna Zięba |
Project in Poland financed by DG Regio |
Statements
166,413.42 zloty
0 references
195,780.49 zloty
0 references
85.0 percent
0 references
6 April 2017
0 references
30 September 2020
0 references
KATARZYNA ZIĘBA FIRMA PRODUKCYJNO-HANDLOWO-USŁUGOWA
0 references
PRZEDMIOT PROJEKTU: Budowa 2 instalacji fotowoltaicznych na działkach Wnioskodawcy, w lokalizacjach prowadzenia działalności gospodarczej (11-300 Biskupiec, pow. olsztyński, woj. warmińsko-mazurskie), tj.: 1. Biskupiec, Adamowo 5, dz. 133/3 (nr ewidencyjny działki: 281402_5.0027.133/3) 2. Biskupiec, ul. 1-go Maja 19b, dz.: 65/8 (nr ewidencyjny działki: 281402_4.0004.65/8) Charakterystyka obu instalacji: - instalacja fotowoltaiczna o mocy 19,8 kW posadowiona na dachu budynku - panele PV monokrystaliczne 300W w liczbie 66 szt. - instalacja osadzona na konstrukcji stalowej połączonej ze stelażem pod panele PV Zadaniem projektowanych instalacji fotowoltaicznych jest wytworzenie energii elektrycznej o parametrach sieci elektroenergetycznej, a następnie zagospodarowanie jej w wewnętrznej instalacji elektrycznej przez odbiorcę. ETAPY REALIZACJI PROJEKTU: - złożenie wniosku o do?nansowanie - podpisanie umowy o do?nansowanie - wybór wykonawcy zgodnie z zasadą konkurencyjności - zawarcie umowy z wykonawcą i rozpoczęcie prac - realizacja prac zgodnie z założonym harmonogramem - zakończenie projektu i podpisanie protokołu końcowego - końcowe rozliczenie projektu SPOSÓB WDRAŻANIA PROJEKTU: - wybór wykonawcy zgodnie z zasadą konkurencyjności - podpisanie umowy z wykonawcą - montaż instalacji - zakończenie projektu, podpisanie protokołu końcowego, płatność końcowa Projekt wpisuje się w założenia wpisane w SzOOP RPO WiM realizując założony cel: Zwiększony udział OZE w ogólnym bilansie energetycznym regionu. Realizacja poddziałania pozwoli na zwiększenie udziału energii odnawialnej w bilansie energ. wnioskodawcy, co wpłynie na zwiększenie udziału energii odnawialnej w bilansie energ. Regionu. Wpłynie to na ograniczenie emisji szkodliwych gazów i pyłów do atmosfery oraz dzięki wykorzystaniu lokalnych źródeł energii odnawialnej zwiększy konkurencyjność regionu. W wyniku realizacji inwestycji spadną koszty związane z zużyciem energii (Polish)
0 references
Identifiers
RPWM.04.01.00-28-0226/17
0 references