RES investments in a diversified ROLLAJSY SP Z O O (Q131828): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The object of the project is the construction of a 39 kW photovoltaic power plant based on 250W photovoltaic panels located within the existing infrastructure of the Applicant (Lojs 3, 11-036 Gielen) The characteristics of the equipment to be installed. Panels, PV polycrystalline 250 W or equivalent with a hardened glass of not less than 3 mm, alloy of anodised aluminium alloy, 65, 3 diodes — or more, optical efficiency of not less than 15 % I...)
(‎Created claim: summary (P836): The subject of the project is the construction of a 39 kW photovoltaic installation based on 250 W photovoltaic panels located in the applicant’s existing infrastructure (Laysy 3, 11-036 Gietrzwald) Characteristics of the devices to be installed. PV polycrystalline panels 250 W or equivalent with tempered glass of a thickness of not less than 3 mm, an anodised aluminium alloy frame, IP 65, 3 bypass diodes or more, optical efficiency not less tha...)
Property / summary
 
The subject of the project is the construction of a 39 kW photovoltaic installation based on 250 W photovoltaic panels located in the applicant’s existing infrastructure (Laysy 3, 11-036 Gietrzwald) Characteristics of the devices to be installed. PV polycrystalline panels 250 W or equivalent with tempered glass of a thickness of not less than 3 mm, an anodised aluminium alloy frame, IP 65, 3 bypass diodes or more, optical efficiency not less than 15 % Inverter with not less than 95 % On-line communication, DC multicontact MC4 connection at least 4 pairs, DC monitoring kg, current monitoring in the network, We envisage ground installations, embedded on steel structure combined with a frame for PV panels, predicted number of panels with a capacity of 250 W 156 pcs. The installation will be separated into 2 inverters (2x 20 KW) Inverters and AC switchboards will be installed in the main connection building. The connection to the main switchboard of the building will be made with AC cable. Stages of project implementation: —submission of an application for DOF. —signing of the DOF agreement. —the selection of the contractor in accordance with the principle of competitiveness -conclusion of the contract with the contractor and commencement of works -implementation of works according to the established schedule – completion of the project and signing of the final protocol – the final settlement of the project The project fits into the assumptions entered in the Polish Shoop, fulfilling the objective of: Increased share of RES in the overall energy balance of the region. The implementation of the sub-measure will increase the share of renewable energy in the company’s energy balance, which will increase the share of renewable energy in the energy balance. It’s a region. This will reduce emissions of harmful gases and dust into the atmosphere and by using local renewable energy sources will increase the company’s competitiveness. The cost of energy consumption will fall as a result of the investment. (English)
Property / summary: The subject of the project is the construction of a 39 kW photovoltaic installation based on 250 W photovoltaic panels located in the applicant’s existing infrastructure (Laysy 3, 11-036 Gietrzwald) Characteristics of the devices to be installed. PV polycrystalline panels 250 W or equivalent with tempered glass of a thickness of not less than 3 mm, an anodised aluminium alloy frame, IP 65, 3 bypass diodes or more, optical efficiency not less than 15 % Inverter with not less than 95 % On-line communication, DC multicontact MC4 connection at least 4 pairs, DC monitoring kg, current monitoring in the network, We envisage ground installations, embedded on steel structure combined with a frame for PV panels, predicted number of panels with a capacity of 250 W 156 pcs. The installation will be separated into 2 inverters (2x 20 KW) Inverters and AC switchboards will be installed in the main connection building. The connection to the main switchboard of the building will be made with AC cable. Stages of project implementation: —submission of an application for DOF. —signing of the DOF agreement. —the selection of the contractor in accordance with the principle of competitiveness -conclusion of the contract with the contractor and commencement of works -implementation of works according to the established schedule – completion of the project and signing of the final protocol – the final settlement of the project The project fits into the assumptions entered in the Polish Shoop, fulfilling the objective of: Increased share of RES in the overall energy balance of the region. The implementation of the sub-measure will increase the share of renewable energy in the company’s energy balance, which will increase the share of renewable energy in the energy balance. It’s a region. This will reduce emissions of harmful gases and dust into the atmosphere and by using local renewable energy sources will increase the company’s competitiveness. The cost of energy consumption will fall as a result of the investment. (English) / rank
 
Normal rank
Property / summary: The subject of the project is the construction of a 39 kW photovoltaic installation based on 250 W photovoltaic panels located in the applicant’s existing infrastructure (Laysy 3, 11-036 Gietrzwald) Characteristics of the devices to be installed. PV polycrystalline panels 250 W or equivalent with tempered glass of a thickness of not less than 3 mm, an anodised aluminium alloy frame, IP 65, 3 bypass diodes or more, optical efficiency not less than 15 % Inverter with not less than 95 % On-line communication, DC multicontact MC4 connection at least 4 pairs, DC monitoring kg, current monitoring in the network, We envisage ground installations, embedded on steel structure combined with a frame for PV panels, predicted number of panels with a capacity of 250 W 156 pcs. The installation will be separated into 2 inverters (2x 20 KW) Inverters and AC switchboards will be installed in the main connection building. The connection to the main switchboard of the building will be made with AC cable. Stages of project implementation: —submission of an application for DOF. —signing of the DOF agreement. —the selection of the contractor in accordance with the principle of competitiveness -conclusion of the contract with the contractor and commencement of works -implementation of works according to the established schedule – completion of the project and signing of the final protocol – the final settlement of the project The project fits into the assumptions entered in the Polish Shoop, fulfilling the objective of: Increased share of RES in the overall energy balance of the region. The implementation of the sub-measure will increase the share of renewable energy in the company’s energy balance, which will increase the share of renewable energy in the energy balance. It’s a region. This will reduce emissions of harmful gases and dust into the atmosphere and by using local renewable energy sources will increase the company’s competitiveness. The cost of energy consumption will fall as a result of the investment. (English) / qualifier
 
point in time: 21 October 2020
Timestamp+2020-10-21T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 16:15, 21 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
RES investments in a diversified ROLLAJSY SP Z O O
Project in Poland financed by DG Regio

    Statements

    0 references
    195,865.57 zloty
    0 references
    47,007.74 Euro
    13 January 2020
    0 references
    230,430.08 zloty
    0 references
    55,303.22 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    4 April 2016
    0 references
    5 May 2017
    0 references
    PRZEDSIĘBIORSTWO WIELOBRANŻOWE "ROLŁAJSY" SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ
    0 references
    0 references

    53°44'52.8"N, 20°14'3.8"E
    0 references
    Przedmiotem projektu jest budowa instalacji fotowoltaicznej o mocy 39 kW w oparciu o panele fotowoltaiczne 250W, zlokalizowanych w istniejącej infrastrukturze Wnioskodawcy (Łajsy 3, 11-036 Gietrzwałd) Charakterystyka urządzeń które zostaną zamontowane. Panele PV polikrystaliczne 250 W lub równoważne o ze szkłem hartowanym o grubości nie mniejszej niż 3 mm, rama ze stopu anodyzowanego stopu aluminiowego, puszka przyłączeniowa IP 65, 3 diody bypass lub więcej , sprawność optyczne nie mniejsza niż 15% Inwerter o nie mniejszej sprawności niż 95% Komunikacja on line, przyłącze DC multicontakt MC4 przynajmniej 4 pary, monitorowanie prądu stałego, monitorowanie prądu z sieci, waga nie większa niż 63 kg. Przewidujemy instalacje gruntową, osadzoną na konstrukcji stalowej połączoną ze stelażem pod panele PV, przewidziana ilość paneli o mocy 250 W 156 szt. Instalacja zostanie rozdzielona na 2 inwertery (2x 20 KW) Inwertery i rozdzielnica AC zamontowane zostaną w budynku przyłączenia głównego. Połączenie z rozdzielnią główną budynku zostanie wykonane kablem AC. Etapy realizacji projektu: -złożenie wniosku o dof. -podpisanie umowy o dof. -wybór wykonawcy zgodnie z zasadą konkurencyjności -zawarcie umowy z wykonawcą i rozpoczęcie prac -realizacja prac zgodnie z założonym harmonogramem -zakończenie projektu i podpisanie protokołu końcowego - końcowe rozliczenie projektu Projekt wpisuje się w założenia wpisane w SzOOP RPOWiM realizując założony cel: Zwiększony udział OZE w ogólnym bilansie energetycznym regionu. Realizacja poddziałania pozwoli na zwiększenie udziału energii odnawialnej w bilansie energ. przedsiębiorstwa, co wpłynie na zwiększenie udziału energii odnawialnej w bilansie energ. Regionu. Wpłynie to na ograniczenie emisji szkodliwych gazów i pyłów do atmosfery oraz dzięki wykorzystaniu lokalnych źródeł energii odnawialnej zwiększy konkurencyjność firmy. W wyniku realizacji inwestycji spadną koszty związane z zużyciem energii. (Polish)
    0 references
    The subject of the project is the construction of a 39 kW photovoltaic installation based on 250 W photovoltaic panels located in the applicant’s existing infrastructure (Laysy 3, 11-036 Gietrzwald) Characteristics of the devices to be installed. PV polycrystalline panels 250 W or equivalent with tempered glass of a thickness of not less than 3 mm, an anodised aluminium alloy frame, IP 65, 3 bypass diodes or more, optical efficiency not less than 15 % Inverter with not less than 95 % On-line communication, DC multicontact MC4 connection at least 4 pairs, DC monitoring kg, current monitoring in the network, We envisage ground installations, embedded on steel structure combined with a frame for PV panels, predicted number of panels with a capacity of 250 W 156 pcs. The installation will be separated into 2 inverters (2x 20 KW) Inverters and AC switchboards will be installed in the main connection building. The connection to the main switchboard of the building will be made with AC cable. Stages of project implementation: —submission of an application for DOF. —signing of the DOF agreement. —the selection of the contractor in accordance with the principle of competitiveness -conclusion of the contract with the contractor and commencement of works -implementation of works according to the established schedule – completion of the project and signing of the final protocol – the final settlement of the project The project fits into the assumptions entered in the Polish Shoop, fulfilling the objective of: Increased share of RES in the overall energy balance of the region. The implementation of the sub-measure will increase the share of renewable energy in the company’s energy balance, which will increase the share of renewable energy in the energy balance. It’s a region. This will reduce emissions of harmful gases and dust into the atmosphere and by using local renewable energy sources will increase the company’s competitiveness. The cost of energy consumption will fall as a result of the investment. (English)
    21 October 2020
    0 references

    Identifiers

    RPWM.04.01.00-28-0198/16
    0 references