(‎Removed claim: summary (P836): The applicant plans to carry out an investment consisting of installing solar panels on the existing infrastructure of the Applicant in the location of Goutkowo 79A 11-041 Olsztyn, dz. No 31/10, 31/16. The project is designed to construct a photovoltaic installation with the total installed capacity of 25,2 kWp. the installation will be placed on the roof of the building. The proposed installation consists of 90 units of 280W photovoltaic modu...)
(‎Created claim: summary (P836): The applicant plans to carry out an investment involving installation of photovoltaic panels in the existing infrastructure of the Applicant in the location of Gutkowo 79A 11-041 Olsztyn, dz. No. 31/10, 31/16. As part of the project, the construction of a photovoltaic installation with a total capacity of 25.2 kWp panels The installation will be planted on the roof of the building. The designed installation consists of 90 units of 280 W photovol...)
Property / summary
 
The applicant plans to carry out an investment involving installation of photovoltaic panels in the existing infrastructure of the Applicant in the location of Gutkowo 79A 11-041 Olsztyn, dz. No. 31/10, 31/16. As part of the project, the construction of a photovoltaic installation with a total capacity of 25.2 kWp panels The installation will be planted on the roof of the building. The designed installation consists of 90 units of 280 W photovoltaic modules equipped with power optimisers and 2 inverters. Stages of project implementation: — submission of an application for funding – signing of a financing agreement – selection of the contractor in accordance with the principle of competitiveness – conclusion of the contract with the contractor and commencement of works – implementation of works according to the planned schedule – completion of the project and signing of the final protocol – final settlement of the project method of implementation in kind: — signing of the contract – implementation of works – final acceptance and signing of the final protocol The project fits into the assumptions entered in the Polish Szoop with the aim of: Increased share of RES in the overall energy balance of the region. The implementation of the sub-measure will increase the share of renewable energy in the company’s energy balance, which will increase the share of renewable energy in the energy balance. It’s a region. This will reduce emissions of harmful gases and dust into the atmosphere and by using local renewable energy sources will increase the competitiveness of the company. The cost of energy consumption will fall as a result of the investment. (English)
Property / summary: The applicant plans to carry out an investment involving installation of photovoltaic panels in the existing infrastructure of the Applicant in the location of Gutkowo 79A 11-041 Olsztyn, dz. No. 31/10, 31/16. As part of the project, the construction of a photovoltaic installation with a total capacity of 25.2 kWp panels The installation will be planted on the roof of the building. The designed installation consists of 90 units of 280 W photovoltaic modules equipped with power optimisers and 2 inverters. Stages of project implementation: — submission of an application for funding – signing of a financing agreement – selection of the contractor in accordance with the principle of competitiveness – conclusion of the contract with the contractor and commencement of works – implementation of works according to the planned schedule – completion of the project and signing of the final protocol – final settlement of the project method of implementation in kind: — signing of the contract – implementation of works – final acceptance and signing of the final protocol The project fits into the assumptions entered in the Polish Szoop with the aim of: Increased share of RES in the overall energy balance of the region. The implementation of the sub-measure will increase the share of renewable energy in the company’s energy balance, which will increase the share of renewable energy in the energy balance. It’s a region. This will reduce emissions of harmful gases and dust into the atmosphere and by using local renewable energy sources will increase the competitiveness of the company. The cost of energy consumption will fall as a result of the investment. (English) / rank
 
Normal rank
Property / summary: The applicant plans to carry out an investment involving installation of photovoltaic panels in the existing infrastructure of the Applicant in the location of Gutkowo 79A 11-041 Olsztyn, dz. No. 31/10, 31/16. As part of the project, the construction of a photovoltaic installation with a total capacity of 25.2 kWp panels The installation will be planted on the roof of the building. The designed installation consists of 90 units of 280 W photovoltaic modules equipped with power optimisers and 2 inverters. Stages of project implementation: — submission of an application for funding – signing of a financing agreement – selection of the contractor in accordance with the principle of competitiveness – conclusion of the contract with the contractor and commencement of works – implementation of works according to the planned schedule – completion of the project and signing of the final protocol – final settlement of the project method of implementation in kind: — signing of the contract – implementation of works – final acceptance and signing of the final protocol The project fits into the assumptions entered in the Polish Szoop with the aim of: Increased share of RES in the overall energy balance of the region. The implementation of the sub-measure will increase the share of renewable energy in the company’s energy balance, which will increase the share of renewable energy in the energy balance. It’s a region. This will reduce emissions of harmful gases and dust into the atmosphere and by using local renewable energy sources will increase the competitiveness of the company. The cost of energy consumption will fall as a result of the investment. (English) / qualifier
 
point in time: 21 October 2020
Timestamp+2020-10-21T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 16:10, 21 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Investments in RES in the enterprise HANDLOFERA.PL
Project in Poland financed by DG Regio

    Statements

    0 references
    107,100.0 zloty
    0 references
    25,704.0 Euro
    13 January 2020
    0 references
    126,000.0 zloty
    0 references
    30,240.0 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    16 March 2020
    0 references
    31 August 2020
    0 references
    HANDLOSFERA.PL SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ
    0 references
    0 references

    53°46'36.1"N, 20°28'40.1"E
    0 references
    Wnioskodawca planuje przeprowadzić inwestycję polegającą na montażu instalacji paneli fotowoltaicznych w istniejącej infrastrukturze Wnioskodawcy w lokalizacji Gutkowo 79A 11-041 Olsztyn, dz. Nr 31/10, 31/16. W ramach projektu zaplanowano budowę instalacji fotowoltaicznej o łącznej mocy zainstalowanych paneli 25,2 kWp Instalacja będzie posadowiona na dachu budynku. Projektowana instalacja składa się z 90 szt. modułów fotowoltaicznych o mocy 280W, wyposażonych w optymalizatory mocy oraz 2 inwertery. Etapy realizacji projektu: - złożenie wniosku o do?nansowanie - podpisanie umowy o do?nansowanie - wybór wykonawcy zgodnie z zasadą konkurencyjności - zawarcie umowy z wykonawcą i rozpoczęcie prac - realizacja prac zgodnie z założonym harmonogramem - zakończenie projektu i podpisanie protokołu końcowego - końcowe rozliczenie projektu sposób wdrażania zakr. rzeczowego: - podpisanie umowy - realizacja prac - odbiór końcowy i podpisanie protokołu końcowego Projekt wpisuje się w założenia wpisane w SzOOP RPOWiM realizując założony cel: Zwiększony udział OZE w ogólnym bilansie energetycznym regionu. Realizacja poddziałania pozwoli na zwiększenie udziału energii odnawialnej w bilansie energ. przedsiębiorstwa, co wpłynie na zwiększenie udziału energii odnawialnej w bilansie energ. Regionu. Wpłynie to na ograniczenie emisji szkodliwych gazów i pyłów do atmosfery oraz dzięki wykorzystaniu lokalnych źródeł energii odnawialnej zwiększy konkurencyjność ?rmy. W wyniku realizacji inwestycji spadną koszty związane z zużyciem energii. (Polish)
    0 references
    The applicant plans to carry out an investment involving installation of photovoltaic panels in the existing infrastructure of the Applicant in the location of Gutkowo 79A 11-041 Olsztyn, dz. No. 31/10, 31/16. As part of the project, the construction of a photovoltaic installation with a total capacity of 25.2 kWp panels The installation will be planted on the roof of the building. The designed installation consists of 90 units of 280 W photovoltaic modules equipped with power optimisers and 2 inverters. Stages of project implementation: — submission of an application for funding – signing of a financing agreement – selection of the contractor in accordance with the principle of competitiveness – conclusion of the contract with the contractor and commencement of works – implementation of works according to the planned schedule – completion of the project and signing of the final protocol – final settlement of the project method of implementation in kind: — signing of the contract – implementation of works – final acceptance and signing of the final protocol The project fits into the assumptions entered in the Polish Szoop with the aim of: Increased share of RES in the overall energy balance of the region. The implementation of the sub-measure will increase the share of renewable energy in the company’s energy balance, which will increase the share of renewable energy in the energy balance. It’s a region. This will reduce emissions of harmful gases and dust into the atmosphere and by using local renewable energy sources will increase the competitiveness of the company. The cost of energy consumption will fall as a result of the investment. (English)