High quality vocational education in the Giżycki unit, in cooperation with entrepreneurs (Q132882): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The project focuses on the development of an educational infrastructure used by students from the Group of Electronic Schools and Information Education in Gżysk, in the school building and in the Centre for Practical Education (CKP). In the school building on the first floor, a vocational training workshop will be created: economic and accounting techniques, office techniques, drawing of technical and computer-aided design, communication in a...) |
(Created claim: summary (P836): The subject of the project is the development of the educational infrastructure used by students of the School of Electronic and Informatics in Giżycko in the school building and the Centre for Practical Training (CKP). Vocational training workshops will be set up in the school building on the first floor: economic and accounting, office technology, technical drawing and computer-assisted design, communication in a foreign language. The creation...) |
||||||||||||||
Property / summary | |||||||||||||||
The subject of the project is the development of the educational infrastructure used by students of the School of Electronic and Informatics in Giżycko in the school building and the Centre for Practical Training (CKP). Vocational training workshops will be set up in the school building on the first floor: economic and accounting, office technology, technical drawing and computer-assisted design, communication in a foreign language. The creation of the workshop consists of repairing rooms, electrical and logical installations, lighting, equipment with school equipment and modern teaching aids and ICT tools according to the KOWEZIU list for these workshops. In the school building, toilets will be reconstructed according to sanitary requirements, created toilet for the disabled, installed stairway platform for the disabled. The ground floor and the first floor will be renovated in accordance with the principles of universal design. In the CKP building there will be a toilet for the disabled, a test stand for diesel engines and an additional insulation of the foundations. CKP studios: the construction and operation of motor vehicles, electrical engineering and electronics, operation of mechatronic devices and systems will be equipped with teaching equipment to acquire the skills necessary in water transport companies and food production and processing. Method of implementation: entrust and control the execution of construction works and the supply of equipment to contractors selected through public procurement. The construction work and equipment of the workshop in the school building will be carried out in 2017. The equipment of the studio at the CKP will be completed in 2018. The project will result in a better adaptation of vocational training conditions at school to the needs of water transport companies and food production and processing, which will increase interest in these forms of education and thus the number of school graduates, which is in line with the assumptions set out in the SZOOP RPO WiM for this sub-measure. (English) | |||||||||||||||
Property / summary: The subject of the project is the development of the educational infrastructure used by students of the School of Electronic and Informatics in Giżycko in the school building and the Centre for Practical Training (CKP). Vocational training workshops will be set up in the school building on the first floor: economic and accounting, office technology, technical drawing and computer-assisted design, communication in a foreign language. The creation of the workshop consists of repairing rooms, electrical and logical installations, lighting, equipment with school equipment and modern teaching aids and ICT tools according to the KOWEZIU list for these workshops. In the school building, toilets will be reconstructed according to sanitary requirements, created toilet for the disabled, installed stairway platform for the disabled. The ground floor and the first floor will be renovated in accordance with the principles of universal design. In the CKP building there will be a toilet for the disabled, a test stand for diesel engines and an additional insulation of the foundations. CKP studios: the construction and operation of motor vehicles, electrical engineering and electronics, operation of mechatronic devices and systems will be equipped with teaching equipment to acquire the skills necessary in water transport companies and food production and processing. Method of implementation: entrust and control the execution of construction works and the supply of equipment to contractors selected through public procurement. The construction work and equipment of the workshop in the school building will be carried out in 2017. The equipment of the studio at the CKP will be completed in 2018. The project will result in a better adaptation of vocational training conditions at school to the needs of water transport companies and food production and processing, which will increase interest in these forms of education and thus the number of school graduates, which is in line with the assumptions set out in the SZOOP RPO WiM for this sub-measure. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The subject of the project is the development of the educational infrastructure used by students of the School of Electronic and Informatics in Giżycko in the school building and the Centre for Practical Training (CKP). Vocational training workshops will be set up in the school building on the first floor: economic and accounting, office technology, technical drawing and computer-assisted design, communication in a foreign language. The creation of the workshop consists of repairing rooms, electrical and logical installations, lighting, equipment with school equipment and modern teaching aids and ICT tools according to the KOWEZIU list for these workshops. In the school building, toilets will be reconstructed according to sanitary requirements, created toilet for the disabled, installed stairway platform for the disabled. The ground floor and the first floor will be renovated in accordance with the principles of universal design. In the CKP building there will be a toilet for the disabled, a test stand for diesel engines and an additional insulation of the foundations. CKP studios: the construction and operation of motor vehicles, electrical engineering and electronics, operation of mechatronic devices and systems will be equipped with teaching equipment to acquire the skills necessary in water transport companies and food production and processing. Method of implementation: entrust and control the execution of construction works and the supply of equipment to contractors selected through public procurement. The construction work and equipment of the workshop in the school building will be carried out in 2017. The equipment of the studio at the CKP will be completed in 2018. The project will result in a better adaptation of vocational training conditions at school to the needs of water transport companies and food production and processing, which will increase interest in these forms of education and thus the number of school graduates, which is in line with the assumptions set out in the SZOOP RPO WiM for this sub-measure. (English) / qualifier | |||||||||||||||
point in time: 21 October 2020
|
Revision as of 16:04, 21 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | High quality vocational education in the Giżycki unit, in cooperation with entrepreneurs |
Project in Poland financed by DG Regio |
Statements
1,587,869.14 zloty
0 references
1,915,403.06 zloty
0 references
82.9 percent
0 references
11 October 2016
0 references
31 August 2018
0 references
POWIAT GIŻYCKI
0 references
Przedmiotem projektu jest rozwój infrastruktury edukacyjnej, z której korzystają uczniowie Zespołu Szkół Elektronicznych i Informatycznych w Giżycku w budynku szkoły i w Centrum Kształcenia Praktycznego (CKP). W budynku szkoły na I piętrze zostaną utworzone pracownie kształcenia zawodowego: ekonomiczno-rachunkowa, techniki biurowej, rysunku technicznego i komputerowego wspomagania projektowania, komunikacji w języku obcym. Tworzenie pracowni polega na wykonaniu remontu pomieszczeń, instalacji elektrycznych i logicznych, oświetlenia, wyposażenia w sprzęt szkolny i nowoczesne pomoce dydaktyczne i narzędzia TIK według wykazu KOWEZIU dla tych pracowni. W budynku szkoły zostaną przebudowane toalety według wymogów sanitarnych, utworzona toaleta dla niepełnosprawnych, zainstalowana platforma schodowa dla niepełnosprawnych. Parter i I piętro zostaną wyremontowane zgodnie z zasadami uniwersalnego projektowania. W budynku CKP zostanie utworzona toaleta dla niepełnosprawnych, stanowisko do badania silników diesla oraz uzupełniona izolacja fundamentów. Pracownie CKP: budowy i eksploatacji pojazdów samochodowych, elektrotechniki i elektroniki, eksploatacji urządzeń i systemów mechatronicznych zostaną doposażone w sprzęt dydaktyczny umożliwiający uzyskanie umiejętności niezbędnych w firmach transportu wodnego oraz produkcji i przetwórstwa żywności. Sposób wdrażania: powierzanie i kontrola wykonania robót budowlanych i dostaw sprzętu wykonawcom wyłonionym poprzez zamówienia publiczne. Roboty budowlane i wyposażenie pracowni w budynku szkolnym zostaną wykonane w roku 2017. Wyposażenie pracowni w CKP zostanie zrealizowane w roku 2018. Rezultatem projektu będzie lepsze dostosowanie warunków kształcenia zawodowego w szkole potrzeb przedsiębiorstw transportu wodnego oraz produkcji i przetwórstwa żywności co zwiększy zainteresowanie tymi formami kształcenia a tym samym liczbę absolwentów szkoły , co jest zgodne z założeniami określonymi w SZOOP RPO WiM dla tego poddziałania. (Polish)
0 references
The subject of the project is the development of the educational infrastructure used by students of the School of Electronic and Informatics in Giżycko in the school building and the Centre for Practical Training (CKP). Vocational training workshops will be set up in the school building on the first floor: economic and accounting, office technology, technical drawing and computer-assisted design, communication in a foreign language. The creation of the workshop consists of repairing rooms, electrical and logical installations, lighting, equipment with school equipment and modern teaching aids and ICT tools according to the KOWEZIU list for these workshops. In the school building, toilets will be reconstructed according to sanitary requirements, created toilet for the disabled, installed stairway platform for the disabled. The ground floor and the first floor will be renovated in accordance with the principles of universal design. In the CKP building there will be a toilet for the disabled, a test stand for diesel engines and an additional insulation of the foundations. CKP studios: the construction and operation of motor vehicles, electrical engineering and electronics, operation of mechatronic devices and systems will be equipped with teaching equipment to acquire the skills necessary in water transport companies and food production and processing. Method of implementation: entrust and control the execution of construction works and the supply of equipment to contractors selected through public procurement. The construction work and equipment of the workshop in the school building will be carried out in 2017. The equipment of the studio at the CKP will be completed in 2018. The project will result in a better adaptation of vocational training conditions at school to the needs of water transport companies and food production and processing, which will increase interest in these forms of education and thus the number of school graduates, which is in line with the assumptions set out in the SZOOP RPO WiM for this sub-measure. (English)
21 October 2020
0 references
Identifiers
RPWM.09.03.01-28-0005/16
0 references