Installation of 159,88 kWp photovoltaic panels for storage facilities with the social and office facilities of Bialmed Sp. z o.o. (Q131740): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The project is a photovoltaic installation of 160,17 kWp for the company Bialmed Sp. z o.o., located on the land on plot 113/38, on ul. Jangono, Pasz. The use of 562 single-grid modules each working in an on-site system shall be designed. The electricity produced by the photovoltaic installation will be used for its own needs, i.e. the lighting and functioning of the electrical equipment and the storage facilities — the office facilities and t...)
(‎Created claim: summary (P836): The subject of the project is a photovoltaic installation of 160.17 kWp for the needs of Bialmed Sp. z o.o. located on the ground, on plot 113/38 of Jagodno in Pisz. It is designed to use 562 polycrystalline modules with a power of 285 Wp each, operating in the “on-grid” system. The electricity produced in the photovoltaic installation will be used for the own needs of the building, i.e. for the lighting and operation of electrical and technolog...)
Property / summary
 
The subject of the project is a photovoltaic installation of 160.17 kWp for the needs of Bialmed Sp. z o.o. located on the ground, on plot 113/38 of Jagodno in Pisz. It is designed to use 562 polycrystalline modules with a power of 285 Wp each, operating in the “on-grid” system. The electricity produced in the photovoltaic installation will be used for the own needs of the building, i.e. for the lighting and operation of electrical and technological equipment of the warehouse and office hall, and the excess energy will be transferred to the professional energy network. The installation designs the use of new three-phase inverters with a power min. 25 kW AC side and a power min 25 kW on the DC side. Implementation of the project is in line with the objectives of action 4.1 SzOOP – by building a photovoltaic installation will increase the share of renewable energy sources in the overall energy balance of the region The project solves all problems in the field of energy – it allows to obtain electricity and heat from renewable sources for future services. The investment will be carried out on regulated real estate – Dz. No 113/25 within the registration area 0009, Bergodne. The implementation will take place in one step within 1 from the signing of the co-financing agreement. The project will be implemented by the applicant on the basis of the contractors of individual services selected in accordance with the procurement rules within the project. (English)
Property / summary: The subject of the project is a photovoltaic installation of 160.17 kWp for the needs of Bialmed Sp. z o.o. located on the ground, on plot 113/38 of Jagodno in Pisz. It is designed to use 562 polycrystalline modules with a power of 285 Wp each, operating in the “on-grid” system. The electricity produced in the photovoltaic installation will be used for the own needs of the building, i.e. for the lighting and operation of electrical and technological equipment of the warehouse and office hall, and the excess energy will be transferred to the professional energy network. The installation designs the use of new three-phase inverters with a power min. 25 kW AC side and a power min 25 kW on the DC side. Implementation of the project is in line with the objectives of action 4.1 SzOOP – by building a photovoltaic installation will increase the share of renewable energy sources in the overall energy balance of the region The project solves all problems in the field of energy – it allows to obtain electricity and heat from renewable sources for future services. The investment will be carried out on regulated real estate – Dz. No 113/25 within the registration area 0009, Bergodne. The implementation will take place in one step within 1 from the signing of the co-financing agreement. The project will be implemented by the applicant on the basis of the contractors of individual services selected in accordance with the procurement rules within the project. (English) / rank
 
Normal rank
Property / summary: The subject of the project is a photovoltaic installation of 160.17 kWp for the needs of Bialmed Sp. z o.o. located on the ground, on plot 113/38 of Jagodno in Pisz. It is designed to use 562 polycrystalline modules with a power of 285 Wp each, operating in the “on-grid” system. The electricity produced in the photovoltaic installation will be used for the own needs of the building, i.e. for the lighting and operation of electrical and technological equipment of the warehouse and office hall, and the excess energy will be transferred to the professional energy network. The installation designs the use of new three-phase inverters with a power min. 25 kW AC side and a power min 25 kW on the DC side. Implementation of the project is in line with the objectives of action 4.1 SzOOP – by building a photovoltaic installation will increase the share of renewable energy sources in the overall energy balance of the region The project solves all problems in the field of energy – it allows to obtain electricity and heat from renewable sources for future services. The investment will be carried out on regulated real estate – Dz. No 113/25 within the registration area 0009, Bergodne. The implementation will take place in one step within 1 from the signing of the co-financing agreement. The project will be implemented by the applicant on the basis of the contractors of individual services selected in accordance with the procurement rules within the project. (English) / qualifier
 
point in time: 21 October 2020
Timestamp+2020-10-21T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 15:58, 21 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Installation of 159,88 kWp photovoltaic panels for storage facilities with the social and office facilities of Bialmed Sp. z o.o.
Project in Poland financed by DG Regio

    Statements

    0 references
    0 references
    757,782.55 zloty
    0 references
    181,867.81 Euro
    13 January 2020
    0 references
    891,508.88 zloty
    0 references
    213,962.13 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    11 May 2017
    0 references
    30 November 2019
    0 references
    BIALMED SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ
    0 references
    0 references

    53°37'46.2"N, 21°48'35.3"E
    0 references
    Przedmiotem projektu jest Instalacja fotowoltaiczna o mocy 160,17 kWp na potrzeby firmy Bialmed Sp. z o.o. zlokalizowana na gruncie, na działce 113/38 obręb Jagodno w Miejscowości Pisz. Projektuje się zastosowanie 562 modułów polikrystalicznych o mocy 285 Wp każdy, pracujących w układzie "on-grid". Energia elektryczna wyprodukowana w instalacji fotowoltaicznej zostanie wykorzystana na potrzeby własne budynku, czyli na potrzeby oświetlenia oraz funkcjonowania urządzeń elektrycznych i technologicznych hali magazynowo - biurowej a nadmiar energii będzie oddawany do sieci energetyki zawodowej. W instalacji projektuje się zastosowanie fabrycznie nowych falowników trójfazowych o mocy min. 25kW strona AC i mocy min 25kW po stronie DC. Realizacja projektu zgodna jest z celami działania 4.1 SzOOP - poprzez budowę instalacji fotowoltaicznej zwiększy udział odnawialnych źródeł energii w ogólnym bilansie energetycznym regionu Realizacja projektu rozwiązuje wszystkie problemy w zakresie energii - umożliwia uzyskanie ze źródeł odnawialnych energii elektrycznej i cieplnej na potrzeby przyszłych usług. Inwestycja realizowana będzie na nieruchomościach o uregulowanym stanie prawnym - dz. nr 113/25 w obrębie ewidencyjnym 0009, Jagodne. Realizacja przebiegnie jednoetapowo w ciągu 1 roku od podpisania umowy o dofinansowanie. Projekt wdrażany będzie przez wnioskodawcę w oparciu o wykonawców poszczególnych usług wybranych zgodnie z zasadami udzielania zamówień w ramach projektu. (Polish)
    0 references
    The subject of the project is a photovoltaic installation of 160.17 kWp for the needs of Bialmed Sp. z o.o. located on the ground, on plot 113/38 of Jagodno in Pisz. It is designed to use 562 polycrystalline modules with a power of 285 Wp each, operating in the “on-grid” system. The electricity produced in the photovoltaic installation will be used for the own needs of the building, i.e. for the lighting and operation of electrical and technological equipment of the warehouse and office hall, and the excess energy will be transferred to the professional energy network. The installation designs the use of new three-phase inverters with a power min. 25 kW AC side and a power min 25 kW on the DC side. Implementation of the project is in line with the objectives of action 4.1 SzOOP – by building a photovoltaic installation will increase the share of renewable energy sources in the overall energy balance of the region The project solves all problems in the field of energy – it allows to obtain electricity and heat from renewable sources for future services. The investment will be carried out on regulated real estate – Dz. No 113/25 within the registration area 0009, Bergodne. The implementation will take place in one step within 1 from the signing of the co-financing agreement. The project will be implemented by the applicant on the basis of the contractors of individual services selected in accordance with the procurement rules within the project. (English)
    21 October 2020
    0 references

    Identifiers

    RPWM.04.01.00-28-0067/17
    0 references