“Management and development of public spaces in Orléans” (Q132785): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The project is part of the establishment of the RPOVM project, thanks to the impact of the project on increasing the attractiveness of the project and giving the functional and aesthetic qualities of the projects covered by the project, taking into account their regional identity. The project is also in line with the thematic objective 9 — Promoting social inclusion, combating poverty and any discrimination and in order to improve the quality...)
(‎Created claim: summary (P836): The project fits into the assumptions of the SzOOP RPOWiM, thanks to the impact of the project on improving the attractiveness of the community and giving functional and aesthetic values to the spaces covered by the project, taking into account their regional identity. The project is also in line with thematic objective 9–Promoting social inclusion, combating poverty and all discrimination and with a specific objective to improve the quality of...)
Property / summary
 
The project fits into the assumptions of the SzOOP RPOWiM, thanks to the impact of the project on improving the attractiveness of the community and giving functional and aesthetic values to the spaces covered by the project, taking into account their regional identity. The project is also in line with thematic objective 9–Promoting social inclusion, combating poverty and all discrimination and with a specific objective to improve the quality of life of the population living in problem areas (point 3.7WD). The project involves a total expenditure of PLN 4 450 492.15. According to the factual and financial schedule, the project assumes: preparatory work, construction work, project supervision, project promotion, contingency reserve, feasibility study. The project envisages execution of works in three locations 1) ul. FR. Jerzy Popieluszki • green (biologically active areas): • paved surfaces (walks, roads): • polyurethane surfaces • utility objects • green • small architecture and play equipment 2) Setting out green areas near the sword lake: • greenery (biologically active areas, beach, surface under gym facilities, bands and decorative paths, flower beds surrounding existing trees): • paved surfaces (walks, bike paths, fountain): • polyurethane surfaces – playgrounds for children: • wooden elements • utility objects and devices • small architecture, play equipment, gym equipment 3) Ul. Bażyński – 1 May: • Green (biologically active areas, surfaces under gym equipment, wristbands and decorative paths, flower beds surrounding existing trees): • paved surfaces (walks, bike paths) • polyurethane surfaces – playgrounds for children: • paving edge • natural aggregate rose • zinc steel fence • utility objects • small architecture, play equipment, gym equipment. (English)
Property / summary: The project fits into the assumptions of the SzOOP RPOWiM, thanks to the impact of the project on improving the attractiveness of the community and giving functional and aesthetic values to the spaces covered by the project, taking into account their regional identity. The project is also in line with thematic objective 9–Promoting social inclusion, combating poverty and all discrimination and with a specific objective to improve the quality of life of the population living in problem areas (point 3.7WD). The project involves a total expenditure of PLN 4 450 492.15. According to the factual and financial schedule, the project assumes: preparatory work, construction work, project supervision, project promotion, contingency reserve, feasibility study. The project envisages execution of works in three locations 1) ul. FR. Jerzy Popieluszki • green (biologically active areas): • paved surfaces (walks, roads): • polyurethane surfaces • utility objects • green • small architecture and play equipment 2) Setting out green areas near the sword lake: • greenery (biologically active areas, beach, surface under gym facilities, bands and decorative paths, flower beds surrounding existing trees): • paved surfaces (walks, bike paths, fountain): • polyurethane surfaces – playgrounds for children: • wooden elements • utility objects and devices • small architecture, play equipment, gym equipment 3) Ul. Bażyński – 1 May: • Green (biologically active areas, surfaces under gym equipment, wristbands and decorative paths, flower beds surrounding existing trees): • paved surfaces (walks, bike paths) • polyurethane surfaces – playgrounds for children: • paving edge • natural aggregate rose • zinc steel fence • utility objects • small architecture, play equipment, gym equipment. (English) / rank
 
Normal rank
Property / summary: The project fits into the assumptions of the SzOOP RPOWiM, thanks to the impact of the project on improving the attractiveness of the community and giving functional and aesthetic values to the spaces covered by the project, taking into account their regional identity. The project is also in line with thematic objective 9–Promoting social inclusion, combating poverty and all discrimination and with a specific objective to improve the quality of life of the population living in problem areas (point 3.7WD). The project involves a total expenditure of PLN 4 450 492.15. According to the factual and financial schedule, the project assumes: preparatory work, construction work, project supervision, project promotion, contingency reserve, feasibility study. The project envisages execution of works in three locations 1) ul. FR. Jerzy Popieluszki • green (biologically active areas): • paved surfaces (walks, roads): • polyurethane surfaces • utility objects • green • small architecture and play equipment 2) Setting out green areas near the sword lake: • greenery (biologically active areas, beach, surface under gym facilities, bands and decorative paths, flower beds surrounding existing trees): • paved surfaces (walks, bike paths, fountain): • polyurethane surfaces – playgrounds for children: • wooden elements • utility objects and devices • small architecture, play equipment, gym equipment 3) Ul. Bażyński – 1 May: • Green (biologically active areas, surfaces under gym equipment, wristbands and decorative paths, flower beds surrounding existing trees): • paved surfaces (walks, bike paths) • polyurethane surfaces – playgrounds for children: • paving edge • natural aggregate rose • zinc steel fence • utility objects • small architecture, play equipment, gym equipment. (English) / qualifier
 
point in time: 21 October 2020
Timestamp+2020-10-21T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 15:49, 21 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
“Management and development of public spaces in Orléans”
Project in Poland financed by DG Regio

    Statements

    0 references
    2,602,981.14 zloty
    0 references
    624,715.47 Euro
    13 January 2020
    0 references
    3,402,589.73 zloty
    0 references
    816,621.54 Euro
    13 January 2020
    0 references
    76.5 percent
    0 references
    2 August 2016
    0 references
    31 December 2019
    0 references
    GMINA ORNETA
    0 references
    0 references

    54°6'56.2"N, 20°7'49.1"E
    0 references
    Projekt wpisuje się w założenia SzOOP RPOWiM, dzięki wpływowi projektu na podniesienie atrakcyjności społ. oraz nadaniu walorów funkcjonalnych i estetycznych przestrzeniom objętych projektem, przy uwzględnieniu ich regionalnej tożsamości. Projekt jest również zgodny z celem tematycznym 9–Promowanie włączenia społecznego,walka z ubóstwem i wszelką dyskryminacją oraz celem szczegółowym–lepsza jakość życia społ. zamieszkujących obszary problemowe(punkt 3.7WD). Projekt wiąże się z całkowitym wydatkiem 4 450 492,15 zł. Zgodnie z harmonogramem rzeczowo-finansowym projekt zakłada: prace przygotowawcze, roboty budowlane, nadzór w projekcie, promocja projektu, rezerwa na nieprzewidziane wydatki, studium wykonalności. Projekt przewiduje wykonanie prac w trzech lokalizacjach 1) ul. Ks. Jerzego Popiełuszki • zieleń (obszary biologicznie czynne): • nawierzchnie utwardzone (ciągi piesze, drogi): • nawierzchnie poliuretanowe • obiekty użytkowe • zieleń • mała architektura i urządzenia zabawowe 2) Zagospodarowanie terenów zielonych przy jeziorze Mieczowym: • zieleń (obszary biologicznie czynne, plaża, nawierzchnia pod urządzenia siłowni, opaski i ścieżki dekoracyjne, klomby okalające istniejące drzewa): • nawierzchnie utwardzone (ciągi piesze, ścieżki rowerowe, fontanna): • nawierzchnie poliuretanowe - place zabaw dla dzieci: • elementy drewniane • obiekty użytkowe i urządzenia • mała architektura, urządzenia zabawowe, urządzenia w siłowni 3) Ul. Bażyńskiego - 1 Maja: • zieleń (obszary biologicznie czynne, nawierzchnia pod urządzenia siłowni, opaski i ścieżki dekoracyjne, klomby okalające istniejące drzewa): • nawierzchnie utwardzone (ciągi piesze, ścieżki rowerowe) • nawierzchnie poliuretanowe - place zabaw dla dzieci: • obrzeże chodnikowe • palisada z kruszywa naturalnego • ogrodzenie ze stali ocynk • obiekty użytkowe • mała architektura, urządzenia zabawowe, urządzenia w siłowni. (Polish)
    0 references
    The project fits into the assumptions of the SzOOP RPOWiM, thanks to the impact of the project on improving the attractiveness of the community and giving functional and aesthetic values to the spaces covered by the project, taking into account their regional identity. The project is also in line with thematic objective 9–Promoting social inclusion, combating poverty and all discrimination and with a specific objective to improve the quality of life of the population living in problem areas (point 3.7WD). The project involves a total expenditure of PLN 4 450 492.15. According to the factual and financial schedule, the project assumes: preparatory work, construction work, project supervision, project promotion, contingency reserve, feasibility study. The project envisages execution of works in three locations 1) ul. FR. Jerzy Popieluszki • green (biologically active areas): • paved surfaces (walks, roads): • polyurethane surfaces • utility objects • green • small architecture and play equipment 2) Setting out green areas near the sword lake: • greenery (biologically active areas, beach, surface under gym facilities, bands and decorative paths, flower beds surrounding existing trees): • paved surfaces (walks, bike paths, fountain): • polyurethane surfaces – playgrounds for children: • wooden elements • utility objects and devices • small architecture, play equipment, gym equipment 3) Ul. Bażyński – 1 May: • Green (biologically active areas, surfaces under gym equipment, wristbands and decorative paths, flower beds surrounding existing trees): • paved surfaces (walks, bike paths) • polyurethane surfaces – playgrounds for children: • paving edge • natural aggregate rose • zinc steel fence • utility objects • small architecture, play equipment, gym equipment. (English)
    21 October 2020
    0 references

    Identifiers

    RPWM.08.01.00-28-0049/16
    0 references