“Forest dry resource management” (Q132763): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The project will be carried out in the Warsaw Basin on the site of the old park situated between the ul. Curve a ul. Wiśniowa. The planned project will be implemented as a recreation and park area in the city centre. This work comprises: • demolition works, dismantling and preparatory works before the start of the relevant works,• Elevation,• Exchange of and paving the way for ground foot walking,• Cleaning, regulation and reinforcement of gro...) |
(Created claim: summary (P836): The project will be carried out in Lidzbark Warminski in the former park located between ul. The curve and the hive. I'm a Vistula. The planned project will be implemented as a recreational and park area in the city centre. The scope of work shall include: • installation of the canal, disassembly and preparation before the commencement of the proper work, • elevation, • replacement, and hardening of the pavement within the road walking on the bo...) |
||||||||||||||
Property / summary | |||||||||||||||
The project will be carried out in Lidzbark Warminski in the former park located between ul. The curve and the hive. I'm a Vistula. The planned project will be implemented as a recreational and park area in the city centre. The scope of work shall include: • installation of the canal, disassembly and preparation before the commencement of the proper work, • elevation, • replacement, and hardening of the pavement within the road walking on the bottom of the moats, • cleansing, repairing and strengthening of earth scarves, • making a passage under the defensive walls with a view of the wall with stairs on the ground, allowing to descend from both sides of the alley at the bottom of the moats, • restoration and modernisation of the body of stones and recreation of the recreation of the drainage on both sides of the avenue at the bottom of the moss, • restoration and modernisation of the edema and modernisation of the rest of the body. Stages of project implementation: —submission of an application for DOF. —signing of the DOF agreement. —the selection of the contractor according to the end. —conclusion of the contract with the contractor and commencement of work -implementation of works according to the established timetable -completion of the project and signing of the final protocol – final settlement of the project method of implementation in kind: —conclusion of the contract -implementation of works -final reception and signing of the protocol The project fits into SZOOP RPO WWM with the aim of: Better quality of life for communities living in problem areas. The project will be open to all Stakeholders including residents living in a degraded area. (English) | |||||||||||||||
Property / summary: The project will be carried out in Lidzbark Warminski in the former park located between ul. The curve and the hive. I'm a Vistula. The planned project will be implemented as a recreational and park area in the city centre. The scope of work shall include: • installation of the canal, disassembly and preparation before the commencement of the proper work, • elevation, • replacement, and hardening of the pavement within the road walking on the bottom of the moats, • cleansing, repairing and strengthening of earth scarves, • making a passage under the defensive walls with a view of the wall with stairs on the ground, allowing to descend from both sides of the alley at the bottom of the moats, • restoration and modernisation of the body of stones and recreation of the recreation of the drainage on both sides of the avenue at the bottom of the moss, • restoration and modernisation of the edema and modernisation of the rest of the body. Stages of project implementation: —submission of an application for DOF. —signing of the DOF agreement. —the selection of the contractor according to the end. —conclusion of the contract with the contractor and commencement of work -implementation of works according to the established timetable -completion of the project and signing of the final protocol – final settlement of the project method of implementation in kind: —conclusion of the contract -implementation of works -final reception and signing of the protocol The project fits into SZOOP RPO WWM with the aim of: Better quality of life for communities living in problem areas. The project will be open to all Stakeholders including residents living in a degraded area. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The project will be carried out in Lidzbark Warminski in the former park located between ul. The curve and the hive. I'm a Vistula. The planned project will be implemented as a recreational and park area in the city centre. The scope of work shall include: • installation of the canal, disassembly and preparation before the commencement of the proper work, • elevation, • replacement, and hardening of the pavement within the road walking on the bottom of the moats, • cleansing, repairing and strengthening of earth scarves, • making a passage under the defensive walls with a view of the wall with stairs on the ground, allowing to descend from both sides of the alley at the bottom of the moats, • restoration and modernisation of the body of stones and recreation of the recreation of the drainage on both sides of the avenue at the bottom of the moss, • restoration and modernisation of the edema and modernisation of the rest of the body. Stages of project implementation: —submission of an application for DOF. —signing of the DOF agreement. —the selection of the contractor according to the end. —conclusion of the contract with the contractor and commencement of work -implementation of works according to the established timetable -completion of the project and signing of the final protocol – final settlement of the project method of implementation in kind: —conclusion of the contract -implementation of works -final reception and signing of the protocol The project fits into SZOOP RPO WWM with the aim of: Better quality of life for communities living in problem areas. The project will be open to all Stakeholders including residents living in a degraded area. (English) / qualifier | |||||||||||||||
point in time: 21 October 2020
|
Revision as of 15:48, 21 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | “Forest dry resource management” |
Project in Poland financed by DG Regio |
Statements
1,420,945.19 zloty
0 references
1,857,444.69 zloty
0 references
76.5 percent
0 references
8 November 2016
0 references
30 November 2018
0 references
GMINA MIEJSKA LIDZBARK WARMIŃSKI
0 references
Przedsięwzięcie realizowane będzie w Lidzbarku Warmińskim na terenie dawnego parku położonego pomiędzy ul. Krzywą a ul. Wiślaną. Planowane przedsięwzięcie będzie realizowane jako obszar rekreacyjno-parkowy w centrum miasta. Zakres prac obejmuje: • roboty rozbiórkowe, demontażowe i przygotowawcze przed rozpoczęciem właściwych prac, • ukształtowanie terenu, • wymianę, oraz utwardzenie nawierzchni w ciągu pieszo jezdnym na dnie fosy, • oczyszczenie, uregulowanie i wzmocnienie skarp ziemnych, • wykonanie pasażu pod murami obronnymi wraz ze schodami na gruncie, umożliwiającymi zejście z obu stron alejki na deptak dolny w dnie fosy, • odnowienie i modernizację balustrad oraz umocnienie ścian istniejących tarasów widokowych z dodatkowymi schodami z tarasu przy rondzie, • utworzenie oczka wodnego, cieku wodnego otwartego oraz fontanny w dnie fosy, • obudowa wylotu burzowego w formie kaskady z kamienia naturalnego, • budowę toalety publicznej pod skarpą fosy, • wykonanie drenażu terenu, przebudowa sieci kanalizacji deszczowej, • wykonanie oświetlenia parkowego typu „led” oraz monitoringu, • montaż ławek oraz siedzisk drewnianych na murkach, • montaż koszy na śmieci, • wykonanie ozdobnych nasadzeń. Etapy realizacji projektu: -złożenie wniosku o dof. -podpisanie umowy o dof. -wybór wykonawcy zgodnie z konk. -zawarcie umowy z wykonawcą i rozpoczęcie prac -realizacja prac zgodnie z założonym harmonogramem -zakończenie projektu i podpisanie protokołu końcowego -końcowe rozliczenie projektu sposób wdrażania zakr. rzeczowego: -podpisanie umowy -realizacja prac -odbiór końcowy i podpisanie prot Projekt wpisuje się w SZOOP RPO WWM realizując cel: „Lepsza jakość życia społeczności zamieszkujących obszary problemowe”. Z projektu będą mogli korzystać wszyscy Interesariusze w tym mieszkańcy zamieszkujący teren zdegradowany. (Polish)
0 references
The project will be carried out in Lidzbark Warminski in the former park located between ul. The curve and the hive. I'm a Vistula. The planned project will be implemented as a recreational and park area in the city centre. The scope of work shall include: • installation of the canal, disassembly and preparation before the commencement of the proper work, • elevation, • replacement, and hardening of the pavement within the road walking on the bottom of the moats, • cleansing, repairing and strengthening of earth scarves, • making a passage under the defensive walls with a view of the wall with stairs on the ground, allowing to descend from both sides of the alley at the bottom of the moats, • restoration and modernisation of the body of stones and recreation of the recreation of the drainage on both sides of the avenue at the bottom of the moss, • restoration and modernisation of the edema and modernisation of the rest of the body. Stages of project implementation: —submission of an application for DOF. —signing of the DOF agreement. —the selection of the contractor according to the end. —conclusion of the contract with the contractor and commencement of work -implementation of works according to the established timetable -completion of the project and signing of the final protocol – final settlement of the project method of implementation in kind: —conclusion of the contract -implementation of works -final reception and signing of the protocol The project fits into SZOOP RPO WWM with the aim of: Better quality of life for communities living in problem areas. The project will be open to all Stakeholders including residents living in a degraded area. (English)
21 October 2020
0 references
Identifiers
RPWM.08.01.00-28-0023/17
0 references