ADAPTING AND EQUIPPING THE ECONOMIC BUILDING FOR THE GARNCARSKA WORKER (Q132736): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): ADAPATSECTION FOR ECONOMIC GARNANCE BUILDING Location of the investment: the Primary School No 3 in Gołdapi (Gołdap, ul. Kościuszki 25) 1-storey building: 58.17 m² for use: 43.98 m² of workshop, equipped with a workshop room, WC to the needs of disabled persons, cloakroom, warehouse room for developing education outside of the formal, activating and socially inclusive — works: 1) electric installation 2) sanitary installation: water supply, se...)
(‎Created claim: summary (P836): Investment ADAPACTIA FOR the pottery workshop Location of the investment: primary School No. 3 in Gołdapi (Gołdap, ul. Kosciuszko 25) Planned charactt. of the building: 1-storey, overhead: 58,17 m², usable area: 43,98 m² Laboratory equipped with a workshop room, toilet for the needs of the disabled, locker room, magazine Laboratory for the development of non-formal education, activation and social inclusion -Construction works: 1) Electrical ins...)
Property / summary
 
Investment ADAPACTIA FOR the pottery workshop Location of the investment: primary School No. 3 in Gołdapi (Gołdap, ul. Kosciuszko 25) Planned charactt. of the building: 1-storey, overhead: 58,17 m², usable area: 43,98 m² Laboratory equipped with a workshop room, toilet for the needs of the disabled, locker room, magazine Laboratory for the development of non-formal education, activation and social inclusion -Construction works: 1) Electrical installation 2) sanitary installation: water supply, sewage, as well as cw, gravity ventilation 3) construction work: demolition, earth, masonry, foundation insulation, wooden ceiling, interior plaster, flooring and painting, roof, window and door carpentry, facade, external elements. (concrete band around the building, armband and platform) -Equipment: 1) electr. furnace for firing clay products 2) electric potter wheel. 3) workshop: tables, seats, steel rollers, ceramic rollers, firing racks, modeling tools, etc. Project scale optimal in terms of technology-technological, economising and environmental Phases, method of project implementation: 1.Development of the investment programme, technical documentation and feasibility study 2. Submission of application, grant agreement. 3.Selection of contractors according to PZP- construction works, equipment delivery, investor supervision, promotion 4. 5.Receiving works (protocols) 6.Finishing project. 7.Finance. billing project. Project. compatible with: —over-local programme of revitalising the Cittaslow city network Woj. It’s Warm.-Maz. —The SzOOP of the RPO WiM – Objective.9 Promoting social exclusion, combating poverty and all discrimination, investment priority.9b: Support for physical, private and social revitalisation (...)', with a specific objective: A better quality of life for the community (...); Scope of project according to the type of supported project, accepted indications: number of supported infrastr. objects located in revitalised areas (English)
Property / summary: Investment ADAPACTIA FOR the pottery workshop Location of the investment: primary School No. 3 in Gołdapi (Gołdap, ul. Kosciuszko 25) Planned charactt. of the building: 1-storey, overhead: 58,17 m², usable area: 43,98 m² Laboratory equipped with a workshop room, toilet for the needs of the disabled, locker room, magazine Laboratory for the development of non-formal education, activation and social inclusion -Construction works: 1) Electrical installation 2) sanitary installation: water supply, sewage, as well as cw, gravity ventilation 3) construction work: demolition, earth, masonry, foundation insulation, wooden ceiling, interior plaster, flooring and painting, roof, window and door carpentry, facade, external elements. (concrete band around the building, armband and platform) -Equipment: 1) electr. furnace for firing clay products 2) electric potter wheel. 3) workshop: tables, seats, steel rollers, ceramic rollers, firing racks, modeling tools, etc. Project scale optimal in terms of technology-technological, economising and environmental Phases, method of project implementation: 1.Development of the investment programme, technical documentation and feasibility study 2. Submission of application, grant agreement. 3.Selection of contractors according to PZP- construction works, equipment delivery, investor supervision, promotion 4. 5.Receiving works (protocols) 6.Finishing project. 7.Finance. billing project. Project. compatible with: —over-local programme of revitalising the Cittaslow city network Woj. It’s Warm.-Maz. —The SzOOP of the RPO WiM – Objective.9 Promoting social exclusion, combating poverty and all discrimination, investment priority.9b: Support for physical, private and social revitalisation (...)', with a specific objective: A better quality of life for the community (...); Scope of project according to the type of supported project, accepted indications: number of supported infrastr. objects located in revitalised areas (English) / rank
 
Normal rank
Property / summary: Investment ADAPACTIA FOR the pottery workshop Location of the investment: primary School No. 3 in Gołdapi (Gołdap, ul. Kosciuszko 25) Planned charactt. of the building: 1-storey, overhead: 58,17 m², usable area: 43,98 m² Laboratory equipped with a workshop room, toilet for the needs of the disabled, locker room, magazine Laboratory for the development of non-formal education, activation and social inclusion -Construction works: 1) Electrical installation 2) sanitary installation: water supply, sewage, as well as cw, gravity ventilation 3) construction work: demolition, earth, masonry, foundation insulation, wooden ceiling, interior plaster, flooring and painting, roof, window and door carpentry, facade, external elements. (concrete band around the building, armband and platform) -Equipment: 1) electr. furnace for firing clay products 2) electric potter wheel. 3) workshop: tables, seats, steel rollers, ceramic rollers, firing racks, modeling tools, etc. Project scale optimal in terms of technology-technological, economising and environmental Phases, method of project implementation: 1.Development of the investment programme, technical documentation and feasibility study 2. Submission of application, grant agreement. 3.Selection of contractors according to PZP- construction works, equipment delivery, investor supervision, promotion 4. 5.Receiving works (protocols) 6.Finishing project. 7.Finance. billing project. Project. compatible with: —over-local programme of revitalising the Cittaslow city network Woj. It’s Warm.-Maz. —The SzOOP of the RPO WiM – Objective.9 Promoting social exclusion, combating poverty and all discrimination, investment priority.9b: Support for physical, private and social revitalisation (...)', with a specific objective: A better quality of life for the community (...); Scope of project according to the type of supported project, accepted indications: number of supported infrastr. objects located in revitalised areas (English) / qualifier
 
point in time: 21 October 2020
Timestamp+2020-10-21T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 15:47, 21 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
ADAPTING AND EQUIPPING THE ECONOMIC BUILDING FOR THE GARNCARSKA WORKER
Project in Poland financed by DG Regio

    Statements

    0 references
    0 references
    177,713.5 zloty
    0 references
    42,651.24 Euro
    13 January 2020
    0 references
    242,907.42 zloty
    0 references
    58,297.78 Euro
    13 January 2020
    0 references
    73.16 percent
    0 references
    19 May 2017
    0 references
    30 August 2018
    0 references
    GMINA GOŁDAP
    0 references
    0 references

    54°18'28.8"N, 22°18'6.8"E
    0 references
    ADAPATCJA BUDYNKU GOSPODARCZEGO NA PRACOWNIĘ GARNCARSKĄ Lokalizacja inwestycji: teren Szkoły Podstawowej nr 3 w Gołdapi (Gołdap, ul. Kościuszki 25) Planowana charakt. budynku: 1-kondygnacyjny, pow. zabudowy: 58,17m2, pow. użytkowa: 43,98m2 Pracownia wyposażona w salę warsztatową, WC przyst. do potrzeb osób niepełnospr., szatnię, magazyn Pracownia do rozwoju edukacji poza formalnej, aktywizacji i integracji społecznej -Roboty budowlane: 1) instalacja elektryczna 2) instalacja sanitarna: wodociagowa, kanalizacyjna, co i cw, wentylacji grawitacyjnej 3) prace budowlane: rozbiórkowe, ziemne, murarskie, izolacje fundamentów, strop drewniany, tynki wewn., posadzki i malowanie, dach, stolarka okienna i drzwiowa, elewacja, elementy zewn. (opaska betonowa wokół budynku, podbudowa pod opaskę i podest) -Wyposażenie: 1) elektr. piec do wypalania wyrobów z gliny 2) koło garncarskie z napędem elektr. 3) warsztatowe: stoły, siedziska, toczki stalowe, wałki dla ceramików, stojaki do wypalania, narzędzia do modelowania, itd. Skala Projektu optymalna pod względem techn.–technologicznym, ekonom. i środowiskowym Etapy, sposób wdrażania proj: 1.Oprac. programu inwestycji, dokumentacji techn. i studium wykonalności 2.Złożenie wniosku, umowa o dofinans. 3.Wybór wykonawców wg PZP– roboty budowlane, dostawa wyposażenia, nadzór inwestorski, promocja 4.Realizacja prac wg harmonogramu rzecz.-finans. 5.Odbiór prac (protokoły) 6.Zakończenie proj. 7.Finans. rozliczenie proj. Proj. zgodny z: -Ponadlokalnym programem rewitalizacji sieci miast Cittaslow Woj. Warm.-Maz. -SzOOP RPO WiM– cel temat.9 Promowanie wyłączenia społecznego, walka z ubóstwem i wszelką dyskryminacją, priorytet inwest.9b: Wspieranie rewitalizacji fizycznej, gosp. i społecznej (...)”, celem szczegółowym: Lepsza jakość życia społeczności (...); Zakres proj. zg. z typem wspieranych proj., przyjętych wskaźn.: liczba wspartych obiektów infrastr. zlokalizowanych na rewitalizowanych obszarach (Polish)
    0 references
    Investment ADAPACTIA FOR the pottery workshop Location of the investment: primary School No. 3 in Gołdapi (Gołdap, ul. Kosciuszko 25) Planned charactt. of the building: 1-storey, overhead: 58,17 m², usable area: 43,98 m² Laboratory equipped with a workshop room, toilet for the needs of the disabled, locker room, magazine Laboratory for the development of non-formal education, activation and social inclusion -Construction works: 1) Electrical installation 2) sanitary installation: water supply, sewage, as well as cw, gravity ventilation 3) construction work: demolition, earth, masonry, foundation insulation, wooden ceiling, interior plaster, flooring and painting, roof, window and door carpentry, facade, external elements. (concrete band around the building, armband and platform) -Equipment: 1) electr. furnace for firing clay products 2) electric potter wheel. 3) workshop: tables, seats, steel rollers, ceramic rollers, firing racks, modeling tools, etc. Project scale optimal in terms of technology-technological, economising and environmental Phases, method of project implementation: 1.Development of the investment programme, technical documentation and feasibility study 2. Submission of application, grant agreement. 3.Selection of contractors according to PZP- construction works, equipment delivery, investor supervision, promotion 4. 5.Receiving works (protocols) 6.Finishing project. 7.Finance. billing project. Project. compatible with: —over-local programme of revitalising the Cittaslow city network Woj. It’s Warm.-Maz. —The SzOOP of the RPO WiM – Objective.9 Promoting social exclusion, combating poverty and all discrimination, investment priority.9b: Support for physical, private and social revitalisation (...)', with a specific objective: A better quality of life for the community (...); Scope of project according to the type of supported project, accepted indications: number of supported infrastr. objects located in revitalised areas (English)
    21 October 2020
    0 references

    Identifiers

    RPWM.08.01.00-28-0010/17
    0 references