“Regeneration of the monument to the Kętrzyński 6 street in Olsztyn” (Q132716): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The scope of the project consists of 1 multi-apartment blocks, in Olsztyn, ul. Kêtrzyński 6 — construction of goods, number of bulbs: 4, total number of premises: 8, of the combined use. 967.70 m². The building as a midwife is preserved in the protection zone and is included in the order No: A-4002, now A-2554). Part of the Building will be carried out as part of the project. a) renovation and maintenance of a staircase in a building, includin...) |
(Created claim: summary (P836): The scope of the project consists of 1 buildings. multi-ged. in Olsztyn, ul. Kętrzyńskiego 6 – bud. sub-piwn., number of floors: 4, total number of premises: 8, with total area of use. 967,70 m². The obstetric building is in the canned area and is entered in the historic district under: A-4002, now A-2554). As part of the project, there will be repairs of part of the co-building at 6 Kętrzyńskiego Street in Olsztyn. a) Repair and maintenance wor...) |
||||||||||||||
Property / summary | |||||||||||||||
The scope of the project consists of 1 buildings. multi-ged. in Olsztyn, ul. Kętrzyńskiego 6 – bud. sub-piwn., number of floors: 4, total number of premises: 8, with total area of use. 967,70 m². The obstetric building is in the canned area and is entered in the historic district under: A-4002, now A-2554). As part of the project, there will be repairs of part of the co-building at 6 Kętrzyńskiego Street in Olsztyn. a) Repair and maintenance works. staircase in the building, including installation of lighting detectors. within the arrangement of lighting. staircase. b) Renovation and e.g. door carpentry for the premises of the residents. c) Perform. vertical. and item of anti-humidification. building d) Execution. 1.1 sw; Interests. front of the project are the village tenement house, and thus obsz. revvit., tourists, canned service., Gm. Olsztyn. Details on the scope of the item. 2.2sw executable and in the techn. document extract attached to the application. The entire range of investments. the implementation. will be through Wsp. It’s a bellow. Nier. at ul. Kętrzyńskiego 6, which together with the co-founder will provide a team of persons responsible for the implementation of the project, who have qualified and witnessed the implementation of projects implemented in the years 2007-2013, which is confirmed by chapter 2.4 of the study. The project after its completion. onezn. will solve one of the essential tests concerning the most bar. destroy and neglect infrastr. techn. at ul. Kętrzyńskiego 6 in Olsztyn and will be counter-margin. significant groups of residents. degrade. social and ecoconom., charakt. up monument. zabudt. surround. In a significant way, get into community activation of the inhabitant and will reduce the level of performance. patol. social phenomena on a given area. Proj. entry. make a bet. SZOOP RPO WiM 2014-2020, Axis 8 Areasmag. rewit., Target tem. It’s 9 Prom. Turn it on. Socially, the fight against poverty and the rhyme disc, Prior. It’s an investment. 9 b – physicist, gossip and community of the poor in urban areas and blow Goal for: Better like the social life of the probie. (English) | |||||||||||||||
Property / summary: The scope of the project consists of 1 buildings. multi-ged. in Olsztyn, ul. Kętrzyńskiego 6 – bud. sub-piwn., number of floors: 4, total number of premises: 8, with total area of use. 967,70 m². The obstetric building is in the canned area and is entered in the historic district under: A-4002, now A-2554). As part of the project, there will be repairs of part of the co-building at 6 Kętrzyńskiego Street in Olsztyn. a) Repair and maintenance works. staircase in the building, including installation of lighting detectors. within the arrangement of lighting. staircase. b) Renovation and e.g. door carpentry for the premises of the residents. c) Perform. vertical. and item of anti-humidification. building d) Execution. 1.1 sw; Interests. front of the project are the village tenement house, and thus obsz. revvit., tourists, canned service., Gm. Olsztyn. Details on the scope of the item. 2.2sw executable and in the techn. document extract attached to the application. The entire range of investments. the implementation. will be through Wsp. It’s a bellow. Nier. at ul. Kętrzyńskiego 6, which together with the co-founder will provide a team of persons responsible for the implementation of the project, who have qualified and witnessed the implementation of projects implemented in the years 2007-2013, which is confirmed by chapter 2.4 of the study. The project after its completion. onezn. will solve one of the essential tests concerning the most bar. destroy and neglect infrastr. techn. at ul. Kętrzyńskiego 6 in Olsztyn and will be counter-margin. significant groups of residents. degrade. social and ecoconom., charakt. up monument. zabudt. surround. In a significant way, get into community activation of the inhabitant and will reduce the level of performance. patol. social phenomena on a given area. Proj. entry. make a bet. SZOOP RPO WiM 2014-2020, Axis 8 Areasmag. rewit., Target tem. It’s 9 Prom. Turn it on. Socially, the fight against poverty and the rhyme disc, Prior. It’s an investment. 9 b – physicist, gossip and community of the poor in urban areas and blow Goal for: Better like the social life of the probie. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The scope of the project consists of 1 buildings. multi-ged. in Olsztyn, ul. Kętrzyńskiego 6 – bud. sub-piwn., number of floors: 4, total number of premises: 8, with total area of use. 967,70 m². The obstetric building is in the canned area and is entered in the historic district under: A-4002, now A-2554). As part of the project, there will be repairs of part of the co-building at 6 Kętrzyńskiego Street in Olsztyn. a) Repair and maintenance works. staircase in the building, including installation of lighting detectors. within the arrangement of lighting. staircase. b) Renovation and e.g. door carpentry for the premises of the residents. c) Perform. vertical. and item of anti-humidification. building d) Execution. 1.1 sw; Interests. front of the project are the village tenement house, and thus obsz. revvit., tourists, canned service., Gm. Olsztyn. Details on the scope of the item. 2.2sw executable and in the techn. document extract attached to the application. The entire range of investments. the implementation. will be through Wsp. It’s a bellow. Nier. at ul. Kętrzyńskiego 6, which together with the co-founder will provide a team of persons responsible for the implementation of the project, who have qualified and witnessed the implementation of projects implemented in the years 2007-2013, which is confirmed by chapter 2.4 of the study. The project after its completion. onezn. will solve one of the essential tests concerning the most bar. destroy and neglect infrastr. techn. at ul. Kętrzyńskiego 6 in Olsztyn and will be counter-margin. significant groups of residents. degrade. social and ecoconom., charakt. up monument. zabudt. surround. In a significant way, get into community activation of the inhabitant and will reduce the level of performance. patol. social phenomena on a given area. Proj. entry. make a bet. SZOOP RPO WiM 2014-2020, Axis 8 Areasmag. rewit., Target tem. It’s 9 Prom. Turn it on. Socially, the fight against poverty and the rhyme disc, Prior. It’s an investment. 9 b – physicist, gossip and community of the poor in urban areas and blow Goal for: Better like the social life of the probie. (English) / qualifier | |||||||||||||||
point in time: 21 October 2020
|
Revision as of 15:47, 21 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | “Regeneration of the monument to the Kętrzyński 6 street in Olsztyn” |
Project in Poland financed by DG Regio |
Statements
472,774.79 zloty
0 references
618,006.27 zloty
0 references
76.5 percent
0 references
26 September 2014
0 references
30 September 2018
0 references
WSPÓLNOTA MIESZKANIOWA NIERUCHOMOŚCI PRZY ULICY KĘTRZYŃSKIEGO 6 W OLSZTYNIE
0 references
Zakres proj. obejmuje 1 bud. wielorodz. położ. w Olsztynie przy ul. Kętrzyńskiego 6 – bud. podpiwn., liczba kondyg.: 4, ilość lokali ogółem: 8, o łącznej pow. użyt. 967,70 m2. Budynek położ. jest w strefie ochr. konserw. i jest wpisany do rej. zabyt. pod nr : A-4002, obecnie A-2554). W ramach projektu wykon. będzie remont części wspól. bud. przy ulicy Kętrzyńskiego 6 w Olsztynie poleg. na wykon.: a) Remontu oraz prac konserw. klatki schod. w budynku, w tym montażu czujek oświetl. w ramach aranż. oświetl. klatek schod. b) Renowacji i wym. stolarki drzwiowej do lokali mieszk. c) Wykon. pion. i poz. izolacji przeciwwilg. budynku d) Wykon. rem. strychu budynku e) Wykon. prac konserw.-restaur. elewacji budynku Więcej w rozdz. 1.1 sw; Interes. przedm. projektu są mieszk. kamienicy, a tym samym obsz. rewit., turyści, służby konserw., Gm. Olsztyn. Szczeg. inform. na temat zakresu rzecz. i przyjęt. rozw. znajduje się w rozdz. 2.2sw wykonaln. oraz w wyciągu z dokum. techn. będącej załączn. do wniosku. Cały zakres inwest. wdraż. będzie przez Wsp. Mieszk. Nier. przy ulicy Kętrzyńskiego 6, która wraz z podm. współ. zapewni zespół osób odpow. za wdroż. projektu, którzy posiadają kwalif. i doświad. w realizacji projektów wdroż. w latach 2007-2013, co potwierdza rozdział 2.4 studium. Projekt po jego zakończ. jednozn. rozwiąże jeden z istotn. probl. dotycz. najbar. zniszcz. i zaniedb. infrastr. techn. przy ul. Kętrzyńskiego 6 w Olsztynie oraz będzie przeciwdz. margin. znacznych grup mieszk. zdegrad. społ. i ekonom., charakt. się zabytk. zabud. otocz. W istotny sposób przycz. się także do społ. aktywiz. mieszk. i wpłynie na obniż. poziomu występ. zjawisk patol. społ. na danym terenie. Proj. wpis. się w założ. SZOOP RPO WiM 2014-2020, Oś 8 Obszary wymag. rewit., Cel tem. 9 Prom. Włącz. Społ., walka z ubóstw. i wsz. dysk rym., Prior. Inwest. 9 b – Wsp. rewit. fizycz., gosp. i społ. ubogich społ.na obszarach miejs. i wiej Cel szcz.: Lepsza jak.życia społ. zam. obsz. probl. (Polish)
0 references
The scope of the project consists of 1 buildings. multi-ged. in Olsztyn, ul. Kętrzyńskiego 6 – bud. sub-piwn., number of floors: 4, total number of premises: 8, with total area of use. 967,70 m². The obstetric building is in the canned area and is entered in the historic district under: A-4002, now A-2554). As part of the project, there will be repairs of part of the co-building at 6 Kętrzyńskiego Street in Olsztyn. a) Repair and maintenance works. staircase in the building, including installation of lighting detectors. within the arrangement of lighting. staircase. b) Renovation and e.g. door carpentry for the premises of the residents. c) Perform. vertical. and item of anti-humidification. building d) Execution. 1.1 sw; Interests. front of the project are the village tenement house, and thus obsz. revvit., tourists, canned service., Gm. Olsztyn. Details on the scope of the item. 2.2sw executable and in the techn. document extract attached to the application. The entire range of investments. the implementation. will be through Wsp. It’s a bellow. Nier. at ul. Kętrzyńskiego 6, which together with the co-founder will provide a team of persons responsible for the implementation of the project, who have qualified and witnessed the implementation of projects implemented in the years 2007-2013, which is confirmed by chapter 2.4 of the study. The project after its completion. onezn. will solve one of the essential tests concerning the most bar. destroy and neglect infrastr. techn. at ul. Kętrzyńskiego 6 in Olsztyn and will be counter-margin. significant groups of residents. degrade. social and ecoconom., charakt. up monument. zabudt. surround. In a significant way, get into community activation of the inhabitant and will reduce the level of performance. patol. social phenomena on a given area. Proj. entry. make a bet. SZOOP RPO WiM 2014-2020, Axis 8 Areasmag. rewit., Target tem. It’s 9 Prom. Turn it on. Socially, the fight against poverty and the rhyme disc, Prior. It’s an investment. 9 b – physicist, gossip and community of the poor in urban areas and blow Goal for: Better like the social life of the probie. (English)
21 October 2020
0 references
Identifiers
RPWM.08.01.00-28-0004/16
0 references