Development of provincial road No 512 in the Cash — Bartoszyce section (Q132696): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The project concerns the extension of DW512 Monetary Bartoszyce with a total of 47.94 km. This work comprises: the work of the shoulder. (do.proj), study section, budget work. (reinforcement of the pavement of the dr.-115kN/axle; making a distinction between the kl.G as a result of a correction of the curves by the curves and the division; improvement of crossings; engineer’s structures., strengthening of bridges to the kl.A; dismantling the v...)
(‎Created claim: summary (P836): The project concerns the expansion of DW512 Money-Bartoszyce with a total length of 47.94 km. The scope of work shall include: the work is ready. (doc.proj.), study, robots bud. (strength on the surface of dr.-115kN/axle; introduction of Dr. to param. kl.G by correction of arches item and vertical; remodeling of intersections; restructure engineer objects, strengthen bridge objects to Class A; demolition of the viaduct railroad. Il. and resident...)
Property / summary
 
The project concerns the expansion of DW512 Money-Bartoszyce with a total length of 47.94 km. The scope of work shall include: the work is ready. (doc.proj.), study, robots bud. (strength on the surface of dr.-115kN/axle; introduction of Dr. to param. kl.G by correction of arches item and vertical; remodeling of intersections; restructure engineer objects, strengthen bridge objects to Class A; demolition of the viaduct railroad. Il. and residential building (km 24+ 620), building of the Górowa Il. Il. and Warciechy bypass, building and refurbishment of sidewalks, bicycle paths, bays autob., parking places, individual and publ exits; bud. and pass for pedestrians; Bud. weighing stations for heavier vehicles, logging of trees and shrubs; Bud. and reconstitution of dehydrated dr.; Bud. and refurbishment of the illumination of Dr.; reconstruction of collisions with foreigners; green landscaping; repair of sideways, renovation of ditches; execution of signs.pion. and item as well as installation of protective barriers and balustrades, e.g. tranquilising of dr., supervision in the project (Contract Engineer, copyright), project promotion, purchase of station., service specialist. (research. in the framework of the IK). The project fits into the SzOOP RPO WiM 2014-2020 division.7.1. Regional road infrastructure – non-competitive projects Woj. It’s Warm.-Maz. Pursues the objective of the theme.7,invest priority.7b. Enhancing regional mobility by linking secondary and tertiary nodes to TEN-T infrastructures, including multimodal nodes and target detail. The extended DW 512 connects with roads of supra-regional importance, with the DK51 leading to the halfway to the ridge crossing with Bezledy-Bagrationovsk Russia, in the afternoon through the European road S7 (E77) to the W-wa. Connecting to the DW 507 in Money, by moving traffic to the European road S22 (E28) (Maciejejwo), it also transfers traffic to the next ridge crossing with Russia Grzechotki-Mamonowo. Thus, the investment improves the connection to the subst network. Ten-T. Connection to higher and lower-order roads will increase the external accessibility of the region and its internal coherence. (English)
Property / summary: The project concerns the expansion of DW512 Money-Bartoszyce with a total length of 47.94 km. The scope of work shall include: the work is ready. (doc.proj.), study, robots bud. (strength on the surface of dr.-115kN/axle; introduction of Dr. to param. kl.G by correction of arches item and vertical; remodeling of intersections; restructure engineer objects, strengthen bridge objects to Class A; demolition of the viaduct railroad. Il. and residential building (km 24+ 620), building of the Górowa Il. Il. and Warciechy bypass, building and refurbishment of sidewalks, bicycle paths, bays autob., parking places, individual and publ exits; bud. and pass for pedestrians; Bud. weighing stations for heavier vehicles, logging of trees and shrubs; Bud. and reconstitution of dehydrated dr.; Bud. and refurbishment of the illumination of Dr.; reconstruction of collisions with foreigners; green landscaping; repair of sideways, renovation of ditches; execution of signs.pion. and item as well as installation of protective barriers and balustrades, e.g. tranquilising of dr., supervision in the project (Contract Engineer, copyright), project promotion, purchase of station., service specialist. (research. in the framework of the IK). The project fits into the SzOOP RPO WiM 2014-2020 division.7.1. Regional road infrastructure – non-competitive projects Woj. It’s Warm.-Maz. Pursues the objective of the theme.7,invest priority.7b. Enhancing regional mobility by linking secondary and tertiary nodes to TEN-T infrastructures, including multimodal nodes and target detail. The extended DW 512 connects with roads of supra-regional importance, with the DK51 leading to the halfway to the ridge crossing with Bezledy-Bagrationovsk Russia, in the afternoon through the European road S7 (E77) to the W-wa. Connecting to the DW 507 in Money, by moving traffic to the European road S22 (E28) (Maciejejwo), it also transfers traffic to the next ridge crossing with Russia Grzechotki-Mamonowo. Thus, the investment improves the connection to the subst network. Ten-T. Connection to higher and lower-order roads will increase the external accessibility of the region and its internal coherence. (English) / rank
 
Normal rank
Property / summary: The project concerns the expansion of DW512 Money-Bartoszyce with a total length of 47.94 km. The scope of work shall include: the work is ready. (doc.proj.), study, robots bud. (strength on the surface of dr.-115kN/axle; introduction of Dr. to param. kl.G by correction of arches item and vertical; remodeling of intersections; restructure engineer objects, strengthen bridge objects to Class A; demolition of the viaduct railroad. Il. and residential building (km 24+ 620), building of the Górowa Il. Il. and Warciechy bypass, building and refurbishment of sidewalks, bicycle paths, bays autob., parking places, individual and publ exits; bud. and pass for pedestrians; Bud. weighing stations for heavier vehicles, logging of trees and shrubs; Bud. and reconstitution of dehydrated dr.; Bud. and refurbishment of the illumination of Dr.; reconstruction of collisions with foreigners; green landscaping; repair of sideways, renovation of ditches; execution of signs.pion. and item as well as installation of protective barriers and balustrades, e.g. tranquilising of dr., supervision in the project (Contract Engineer, copyright), project promotion, purchase of station., service specialist. (research. in the framework of the IK). The project fits into the SzOOP RPO WiM 2014-2020 division.7.1. Regional road infrastructure – non-competitive projects Woj. It’s Warm.-Maz. Pursues the objective of the theme.7,invest priority.7b. Enhancing regional mobility by linking secondary and tertiary nodes to TEN-T infrastructures, including multimodal nodes and target detail. The extended DW 512 connects with roads of supra-regional importance, with the DK51 leading to the halfway to the ridge crossing with Bezledy-Bagrationovsk Russia, in the afternoon through the European road S7 (E77) to the W-wa. Connecting to the DW 507 in Money, by moving traffic to the European road S22 (E28) (Maciejejwo), it also transfers traffic to the next ridge crossing with Russia Grzechotki-Mamonowo. Thus, the investment improves the connection to the subst network. Ten-T. Connection to higher and lower-order roads will increase the external accessibility of the region and its internal coherence. (English) / qualifier
 
point in time: 21 October 2020
Timestamp+2020-10-21T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 15:46, 21 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Development of provincial road No 512 in the Cash — Bartoszyce section
Project in Poland financed by DG Regio

    Statements

    0 references
    0 references
    0 references
    0 references
    0 references
    228,094,268.91 zloty
    0 references
    54,742,624.54 Euro
    13 January 2020
    0 references
    269,752,700.0 zloty
    0 references
    64,740,648.0 Euro
    13 January 2020
    0 references
    84.56 percent
    0 references
    18 December 2015
    0 references
    31 December 2021
    0 references
    WOJEWÓDZTWO WARMIŃSKO-MAZURSKIE
    0 references

    54°15'20.9"N, 20°48'24.5"E
    0 references

    54°15'44.3"N, 20°48'32.0"E
    0 references

    54°17'19.0"N, 20°29'25.8"E
    0 references

    54°14'19.0"N, 20°7'32.9"E
    0 references
    Przedsięwzięcie dotyczy rozbudowy DW512 Pieniężno–Bartoszyce o łącznej dł.47,94 km. Zakres prac obejmuje: prace przygot. (dok.proj.), studium wyk., roboty bud. (wzmocn. nawierzchni dr.-115kN/oś; doprowadzenie dr. do param. kl.G przez korektę łuków poz. i pion.; przebud. istn. skrzyżowań; przebud. obiektów inżynier., wzmocn. obiektów most. do kl.A; rozbiórka wiaduktu kolej. w Gór. Ił. i bud. mieszk.(km 24+620), bud. obwodnicy Górowa Ił. i m.Wojciechy, bud. i przebud. chodników, ścieżek rowerowych, zatok autob., miejsc postoj., zjazdów indywid. i publ.; bud. i przeb. przejść dla pieszych; bud. stanowisk do ważenia pojazdów cięż., wycinka drzew i krzewów; bud. i przebud. odwodn. dr.; bud. i przebud. oświetlenia dr.; przebud. kolizji z urz.obcymi; zagosp. zieleni; remont poboczy, renowacja rowów przydr.; wykonanie oznak.pion. i poz. oraz montaż barier ochronnych i balustrad, el. uspokojenia ruchu dr.), nadzór w projekcie (Inżynier Kontraktu, nadz. autorski), promocja proj., zakup nieruch., usł. specjalist. (bad. labor. w ramach IK). Projekt wpisuje się w SzOOP RPO WiM 2014-2020 dział.7.1. Infrastruktura drogowa o znaczeniu regionalnym–projekty pozakonkursowe Woj. Warm.-Maz. Realizuje cel temat.7,priorytet inwest.7b. Zwiększanie mobilności regionalnej poprzez łączenie węzłów drugorzędnych i trzeciorzędnych z infrastrukturą TEN-T, w tym z węzłami multimodalnymi oraz cel szczegół.. Rozbudowywana DW 512 łączy się z drogami o znaczeniu ponadregionalnym, z DK51 prowadzącą w kierunku półn. do przejścia gran. z Rosją Bezledy–Bagrationowsk, w połud. poprzez drogę europejską S7 (E77) do W-wy. Łącząc się z drogą DW 507 w Pieniężnie, poprzez przeniesienie ruchu na drogę europejską S22 (E28) (miejscowość Maciejewo), przenosi również ruch do kolejnego przejścia gran. z Rosją Grzechotki–Mamonowo. Tym samym inwestycja usprawnia połączenie z siecią podst. TEN-T. Połączenie z drogami wyższego jak i niższego rzędu zwiększy zewn. dostępność komunikacyjną regionu oraz jego wewn. spójność. (Polish)
    0 references
    The project concerns the expansion of DW512 Money-Bartoszyce with a total length of 47.94 km. The scope of work shall include: the work is ready. (doc.proj.), study, robots bud. (strength on the surface of dr.-115kN/axle; introduction of Dr. to param. kl.G by correction of arches item and vertical; remodeling of intersections; restructure engineer objects, strengthen bridge objects to Class A; demolition of the viaduct railroad. Il. and residential building (km 24+ 620), building of the Górowa Il. Il. and Warciechy bypass, building and refurbishment of sidewalks, bicycle paths, bays autob., parking places, individual and publ exits; bud. and pass for pedestrians; Bud. weighing stations for heavier vehicles, logging of trees and shrubs; Bud. and reconstitution of dehydrated dr.; Bud. and refurbishment of the illumination of Dr.; reconstruction of collisions with foreigners; green landscaping; repair of sideways, renovation of ditches; execution of signs.pion. and item as well as installation of protective barriers and balustrades, e.g. tranquilising of dr., supervision in the project (Contract Engineer, copyright), project promotion, purchase of station., service specialist. (research. in the framework of the IK). The project fits into the SzOOP RPO WiM 2014-2020 division.7.1. Regional road infrastructure – non-competitive projects Woj. It’s Warm.-Maz. Pursues the objective of the theme.7,invest priority.7b. Enhancing regional mobility by linking secondary and tertiary nodes to TEN-T infrastructures, including multimodal nodes and target detail. The extended DW 512 connects with roads of supra-regional importance, with the DK51 leading to the halfway to the ridge crossing with Bezledy-Bagrationovsk Russia, in the afternoon through the European road S7 (E77) to the W-wa. Connecting to the DW 507 in Money, by moving traffic to the European road S22 (E28) (Maciejejwo), it also transfers traffic to the next ridge crossing with Russia Grzechotki-Mamonowo. Thus, the investment improves the connection to the subst network. Ten-T. Connection to higher and lower-order roads will increase the external accessibility of the region and its internal coherence. (English)
    21 October 2020
    0 references

    Identifiers

    RPWM.07.01.00-28-0005/18
    0 references