Warmia-Masuria cycle loop — phase II of the South East East Treaty for the Great Lakes Great Lakes (Q132688): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The project will be carried out on the basis of a partnership agreement concluded between the Association of the Great Lakes Region 2020 (the lead partner), the municipalities (Pisz, Orzyz, Rucianemne) and the District of Piaski and participating in the project, the State Treasury — State holdings of Forest Forests: Masklińskie, Pisz, Gizycko), the State Treasury — General Directorate for National Roads and Motorways, Olsztyn Branch. This proj...) |
(Created claim: summary (P836): The project will be implemented on the basis of a partnership agreement concluded between the Association Wielkie Jeziora Mazurskie 2020 (leading partner), communes (Pisz, Orzysz, Rucian-Nida) and Piski county and participating in the project, State Treasury – State Forest Farms State Forests (forests: Maskulińskie, Pisz, Gizycko), the State Treasury – General Directorate for National Roads and Motorways branch of Olsztyn. This project: Stage II...) |
||||||||||||||
Property / summary | |||||||||||||||
The project will be implemented on the basis of a partnership agreement concluded between the Association Wielkie Jeziora Mazurskie 2020 (leading partner), communes (Pisz, Orzysz, Rucian-Nida) and Piski county and participating in the project, State Treasury – State Forest Farms State Forests (forests: Maskulińskie, Pisz, Gizycko), the State Treasury – General Directorate for National Roads and Motorways branch of Olsztyn. This project: Stage II – South-East Cycling Trakt of Great Masurian Lakes Land is a separate and independently functioning component of the integrated project BC. Mazury loop ROWEROWA, whose object is to prepare and launch a cycle route around the Great Masurian Lakes leading through attractive natural and landscape areas of Masuria. “Mazurska Pętla Bicycle” is functionally connected and is complementary to the interregional programme “Bike Routes in Eastern Poland”, as it combines the routes of the southern part of Masuria with the route built as part of this programme running the northern border of the voivodship. Stage II – North-East Cycling Trakt of Great Masurian Lakes Land will be located within the administrative boundaries of the municipalities: Write, Orzysz, Rucian-Nida). Route route: Trumpy – Okartowo – Karwik – Pisz – Wiartel – Karwica – Crosses – Ruciane-Nida – Iznota. The project will create about 91 km of glass, 37 intersections, 10 engineering facilities (bridge facilities, tunnels, culverts, resistance structures), 2 observation towers, 6 cyclists’ service places. The project demonstrates consistency with the objectives of priority axis 6- Culture and heritage of the WiM RPO indicated in SZOOP, as the result will be a bicycle route, which allows to maintain the competitive advantage of Warmia and Mazury over other regions based on natural heritage resources. (English) | |||||||||||||||
Property / summary: The project will be implemented on the basis of a partnership agreement concluded between the Association Wielkie Jeziora Mazurskie 2020 (leading partner), communes (Pisz, Orzysz, Rucian-Nida) and Piski county and participating in the project, State Treasury – State Forest Farms State Forests (forests: Maskulińskie, Pisz, Gizycko), the State Treasury – General Directorate for National Roads and Motorways branch of Olsztyn. This project: Stage II – South-East Cycling Trakt of Great Masurian Lakes Land is a separate and independently functioning component of the integrated project BC. Mazury loop ROWEROWA, whose object is to prepare and launch a cycle route around the Great Masurian Lakes leading through attractive natural and landscape areas of Masuria. “Mazurska Pętla Bicycle” is functionally connected and is complementary to the interregional programme “Bike Routes in Eastern Poland”, as it combines the routes of the southern part of Masuria with the route built as part of this programme running the northern border of the voivodship. Stage II – North-East Cycling Trakt of Great Masurian Lakes Land will be located within the administrative boundaries of the municipalities: Write, Orzysz, Rucian-Nida). Route route: Trumpy – Okartowo – Karwik – Pisz – Wiartel – Karwica – Crosses – Ruciane-Nida – Iznota. The project will create about 91 km of glass, 37 intersections, 10 engineering facilities (bridge facilities, tunnels, culverts, resistance structures), 2 observation towers, 6 cyclists’ service places. The project demonstrates consistency with the objectives of priority axis 6- Culture and heritage of the WiM RPO indicated in SZOOP, as the result will be a bicycle route, which allows to maintain the competitive advantage of Warmia and Mazury over other regions based on natural heritage resources. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The project will be implemented on the basis of a partnership agreement concluded between the Association Wielkie Jeziora Mazurskie 2020 (leading partner), communes (Pisz, Orzysz, Rucian-Nida) and Piski county and participating in the project, State Treasury – State Forest Farms State Forests (forests: Maskulińskie, Pisz, Gizycko), the State Treasury – General Directorate for National Roads and Motorways branch of Olsztyn. This project: Stage II – South-East Cycling Trakt of Great Masurian Lakes Land is a separate and independently functioning component of the integrated project BC. Mazury loop ROWEROWA, whose object is to prepare and launch a cycle route around the Great Masurian Lakes leading through attractive natural and landscape areas of Masuria. “Mazurska Pętla Bicycle” is functionally connected and is complementary to the interregional programme “Bike Routes in Eastern Poland”, as it combines the routes of the southern part of Masuria with the route built as part of this programme running the northern border of the voivodship. Stage II – North-East Cycling Trakt of Great Masurian Lakes Land will be located within the administrative boundaries of the municipalities: Write, Orzysz, Rucian-Nida). Route route: Trumpy – Okartowo – Karwik – Pisz – Wiartel – Karwica – Crosses – Ruciane-Nida – Iznota. The project will create about 91 km of glass, 37 intersections, 10 engineering facilities (bridge facilities, tunnels, culverts, resistance structures), 2 observation towers, 6 cyclists’ service places. The project demonstrates consistency with the objectives of priority axis 6- Culture and heritage of the WiM RPO indicated in SZOOP, as the result will be a bicycle route, which allows to maintain the competitive advantage of Warmia and Mazury over other regions based on natural heritage resources. (English) / qualifier | |||||||||||||||
point in time: 21 October 2020
|
Revision as of 15:46, 21 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Warmia-Masuria cycle loop — phase II of the South East East Treaty for the Great Lakes Great Lakes |
Project in Poland financed by DG Regio |
Statements
14,337,929.41 zloty
0 references
17,508,767.14 zloty
0 references
81.89 percent
0 references
18 August 2017
0 references
31 December 2021
0 references
STOWARZYSZENIE WIELKIE JEZIORA MAZURSKIE 2020
0 references
Projekt będzie realizowany na podstawie umowy partnerskiej zawartej pomiędzy Stowarzyszeniem Wielkie Jeziora Mazurskie 2020 (partnerem wiodącym), gminami (Pisz, Orzysz, Rucianem-Nida) i powiatem Piskim oraz uczestniczącymi w projekcie, Skarbem Państwa – Państwowymi Gospodarstwami Leśnymi Lasy Państwowe (Nadleśnictwa: Maskulińskie, Pisz, Gizycko), Skarbem Państwa – Generalną Dyrekcją Dróg Krajowych i Autostrad oddział Olsztyn. Niniejszy projekt: Etap II – Południowo-wschodni Trakt Rowerowy Krainy Wielkich Jezior Mazurskich jest oddzielnym i niezależnie funkcjonującym elementem składowym przedsięwzięcia zintegrowanego pn. MAZURSKA PĘTLA ROWEROWA, którego przedmiotem jest przygotowanie i uruchomienie trasy rowerowej wokół Wielkich Jezior Mazurskich prowadzącego przez atrakcyjne przyrodniczo i krajobrazowo tereny Mazur. „Mazurska Pętla Rowerowa” łączy się funkcjonalnie i jest komplementarna do międzyregionalnego programu „Trasy rowerowe w Polsce Wschodniej”, gdyż stanowi połączenie szlaków południowej części Mazur z wybudowaną w ramach tego programu trasą biegnącą północną granicą województwa. Etap II – Północno-Wschodni Trakt Rowerowy Krainy Wielkich Jezior Mazurskich zostanie zlokalizowany w granicach administracyjnych gmin: Pisz, Orzysz, Rucianem-Nida). Przebieg trasy: Cieżpięty – Okartowo – Karwik – Pisz – Wiartel – Karwica – Krzyże – Ruciane-Nida - Iznota. W ramach projektu powstanie około 91 km szklaku, 37 skrzyżowań, 10 obiektów inżynierskich (obiekty mostowe, tunele, przepusty, konstrukcje oporowe), 2 wieże widokowe, 6 miejsc obsługi rowerzystów. Projekt wykazuje spójność z celami osi priorytetowej 6- Kultura i dziedzictwo RPO WiM wskazanymi w SZOOP, ponieważ jego efektem będzie wybudowany szlak rowerowy, umożliwiający utrzymanie przewagi konkurencyjnej Warmii i Mazur nad innymi regionami w oparciu o zasoby dziedzictwa naturalnego. (Polish)
0 references
The project will be implemented on the basis of a partnership agreement concluded between the Association Wielkie Jeziora Mazurskie 2020 (leading partner), communes (Pisz, Orzysz, Rucian-Nida) and Piski county and participating in the project, State Treasury – State Forest Farms State Forests (forests: Maskulińskie, Pisz, Gizycko), the State Treasury – General Directorate for National Roads and Motorways branch of Olsztyn. This project: Stage II – South-East Cycling Trakt of Great Masurian Lakes Land is a separate and independently functioning component of the integrated project BC. Mazury loop ROWEROWA, whose object is to prepare and launch a cycle route around the Great Masurian Lakes leading through attractive natural and landscape areas of Masuria. “Mazurska Pętla Bicycle” is functionally connected and is complementary to the interregional programme “Bike Routes in Eastern Poland”, as it combines the routes of the southern part of Masuria with the route built as part of this programme running the northern border of the voivodship. Stage II – North-East Cycling Trakt of Great Masurian Lakes Land will be located within the administrative boundaries of the municipalities: Write, Orzysz, Rucian-Nida). Route route: Trumpy – Okartowo – Karwik – Pisz – Wiartel – Karwica – Crosses – Ruciane-Nida – Iznota. The project will create about 91 km of glass, 37 intersections, 10 engineering facilities (bridge facilities, tunnels, culverts, resistance structures), 2 observation towers, 6 cyclists’ service places. The project demonstrates consistency with the objectives of priority axis 6- Culture and heritage of the WiM RPO indicated in SZOOP, as the result will be a bicycle route, which allows to maintain the competitive advantage of Warmia and Mazury over other regions based on natural heritage resources. (English)
21 October 2020
0 references
Identifiers
RPWM.06.02.03-28-0051/17
0 references