Exploiting the endogenous potential of the cough district by building a exposed mineral basin. (Q127957): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The project will consist of the construction of a 10 m x 18 m gel pit as well as a m depth max. 1.30 m divided into two parts. 7 m x 10 m and 11 m x 10 m with covering a non-swimming pool with adequate thermal insulation properties to reduce evaporation and heat losses at a time when the swimming pool is not in use and a baby home; the purchase and assembly of the equipment of the complete mineral and sulphide basin; on the beach around the sw...)
(‎Created claim: summary (P836): The project will consist of the building of a basin of reinforced concrete with dimensions of 10 m x 18 m, depth max. 1.30 m divided into two parts. 7 m x 10 m and 11 m x 10 m with pool basin cover with suitable thermal insulation properties to reduce evaporation and heat loss while the pool is not in use and a children’s paddling pool; purchase and assembly of equipment of a complete mineral-sulphur pool technique; the beach around the pool wit...)
Property / summary
 
The project will consist of the building of a basin of reinforced concrete with dimensions of 10 m x 18 m, depth max. 1.30 m divided into two parts. 7 m x 10 m and 11 m x 10 m with pool basin cover with suitable thermal insulation properties to reduce evaporation and heat loss while the pool is not in use and a children’s paddling pool; purchase and assembly of equipment of a complete mineral-sulphur pool technique; the beach around the pool with drains, finished with non-slip and antibacterial material in the colouring of the environment; equipment with benches, deck chairs, etc.; a building in a shape referring to megalithic tombs discovered in Słonowice (Gmina Kazimierza Wielka), in which there is a salt chamber, two toilets with showers, a room for lifeguards, a bar room, a room for archaeological expositions; fence of existing objects; go from the existing building of the pool to a new building and a sulphide pool; the parking lot and the fence. The infrastructure will be adapted to the needs of people with disabilities. The direct objective: developing endogenous potential by increasing access to and development of specific natural and cultural resources; Intermediate objective: accelerating economic development and increasing investment attractiveness of the county-promotion of health tourism with the generation of demand for rehabilitation and massage services; strategic importance for the development of the region-an increase in the number of tourists visiting the county; increasing the attractiveness of the county as a place of residence-reducing external migration. The project will affect the implementation of the following indicators: 1. Number of projects which financed the costs of rational improvement for people with disabilities [pcs] – 1, 2. Number of facilities adapted to the needs of people with disabilities [pc.] – 1, 3. Employment growth in supported entities (other than enterprises) [EPC] – 5,5. (English)
Property / summary: The project will consist of the building of a basin of reinforced concrete with dimensions of 10 m x 18 m, depth max. 1.30 m divided into two parts. 7 m x 10 m and 11 m x 10 m with pool basin cover with suitable thermal insulation properties to reduce evaporation and heat loss while the pool is not in use and a children’s paddling pool; purchase and assembly of equipment of a complete mineral-sulphur pool technique; the beach around the pool with drains, finished with non-slip and antibacterial material in the colouring of the environment; equipment with benches, deck chairs, etc.; a building in a shape referring to megalithic tombs discovered in Słonowice (Gmina Kazimierza Wielka), in which there is a salt chamber, two toilets with showers, a room for lifeguards, a bar room, a room for archaeological expositions; fence of existing objects; go from the existing building of the pool to a new building and a sulphide pool; the parking lot and the fence. The infrastructure will be adapted to the needs of people with disabilities. The direct objective: developing endogenous potential by increasing access to and development of specific natural and cultural resources; Intermediate objective: accelerating economic development and increasing investment attractiveness of the county-promotion of health tourism with the generation of demand for rehabilitation and massage services; strategic importance for the development of the region-an increase in the number of tourists visiting the county; increasing the attractiveness of the county as a place of residence-reducing external migration. The project will affect the implementation of the following indicators: 1. Number of projects which financed the costs of rational improvement for people with disabilities [pcs] – 1, 2. Number of facilities adapted to the needs of people with disabilities [pc.] – 1, 3. Employment growth in supported entities (other than enterprises) [EPC] – 5,5. (English) / rank
 
Normal rank
Property / summary: The project will consist of the building of a basin of reinforced concrete with dimensions of 10 m x 18 m, depth max. 1.30 m divided into two parts. 7 m x 10 m and 11 m x 10 m with pool basin cover with suitable thermal insulation properties to reduce evaporation and heat loss while the pool is not in use and a children’s paddling pool; purchase and assembly of equipment of a complete mineral-sulphur pool technique; the beach around the pool with drains, finished with non-slip and antibacterial material in the colouring of the environment; equipment with benches, deck chairs, etc.; a building in a shape referring to megalithic tombs discovered in Słonowice (Gmina Kazimierza Wielka), in which there is a salt chamber, two toilets with showers, a room for lifeguards, a bar room, a room for archaeological expositions; fence of existing objects; go from the existing building of the pool to a new building and a sulphide pool; the parking lot and the fence. The infrastructure will be adapted to the needs of people with disabilities. The direct objective: developing endogenous potential by increasing access to and development of specific natural and cultural resources; Intermediate objective: accelerating economic development and increasing investment attractiveness of the county-promotion of health tourism with the generation of demand for rehabilitation and massage services; strategic importance for the development of the region-an increase in the number of tourists visiting the county; increasing the attractiveness of the county as a place of residence-reducing external migration. The project will affect the implementation of the following indicators: 1. Number of projects which financed the costs of rational improvement for people with disabilities [pcs] – 1, 2. Number of facilities adapted to the needs of people with disabilities [pc.] – 1, 3. Employment growth in supported entities (other than enterprises) [EPC] – 5,5. (English) / qualifier
 
point in time: 21 October 2020
Timestamp+2020-10-21T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 13:23, 21 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Exploiting the endogenous potential of the cough district by building a exposed mineral basin.
Project in Poland financed by DG Regio

    Statements

    0 references
    3,372,291.12 zloty
    0 references
    809,349.87 Euro
    13 January 2020
    0 references
    3,967,401.32 zloty
    0 references
    952,176.32 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 January 2018
    0 references
    31 December 2020
    0 references
    POWIAT KAZIMIERSKI
    0 references
    Q2534656 (Deleted Item)
    0 references
    Projekt będzie polegał na bud. niecki basenowej żelbetowej o wymiarach 10m x 18m, głębokości max. 1,30 m podzielonej na dwie części o wym. 7m x 10m i 11m x 10m wraz z pokryciem niecek basenowych materiałem o odpowiednich właściwościach termoizolacyjnych w celu ograniczenia parowania i straty ciepła w czasie gdy basen nie będzie użytkowany oraz brodzika dla dzieci; zakupie i montażu urządzeń techniki kompletnego basenu mineralno-siarczkowego; wyk. plaży wokół basenu z odpływami, wykończonej materiałem antypoślizgowym i antybakteryjnym w kolorystyce uwzgl. środowisko; wyposażeniu w ławki, leżaki, itp.; wyk. budynku w kształcie nawiązującym do grobowców megalitycznych odkrytych w Słonowicach (gm. Kazimierza Wielka), w którym przewiduje się komorę solną, dwa WC z prysznicami, pomieszcz. dla ratowników, pomieszcz. baru, pomieszcz. na ekspozycje archeologiczne; ogrodzenie powstałych obiektów; wyk. przejść z istniejącego budynku basenu do nowego budynku oraz basenu siarczkowego; wyk. parkingu wraz z ogrodzeniem. Powstała infrastruktura będzie dostosow. do potrzeb osób z niepełnosprawnościami. Cel bezpośredni: rozwój potencjału endogenicznego poprzez zwiększenie dostępu do określonych zasobów naturalnych i kulturalnych oraz ich rozwój; Cel pośredni: przyspieszenie rozwoju gospodarcz. i wzrost atrakcyjności inwestycyjnej powiatu–oferta turystyki prozdrowotnej wraz z generowaniem popytu na usługi rehabilitacji i masażu; strategiczne znaczenie dla rozwoju regionu-wzrost liczby turystów odwiedzających powiat; wzrost atrakcyjności powiatu jako miejsca zamieszkania-zmniejszenie migracji zewn. Projekt wpłynie na realizację nast. wskaźników: 1. Liczba projektów, w których sfinansowano koszty racjonalnych usprawnień dla osób z niepełnosprawnościami [szt.] - 1, 2. Liczba obiektów dostosowanych do potrzeb osób z niepełnosprawnościami [szt.]- 1, 3. Wzrost zatrudnienia we wspieranych podmiotach (innych niż przedsiębiorstwa) [EPC] - 5,5. (Polish)
    0 references
    The project will consist of the building of a basin of reinforced concrete with dimensions of 10 m x 18 m, depth max. 1.30 m divided into two parts. 7 m x 10 m and 11 m x 10 m with pool basin cover with suitable thermal insulation properties to reduce evaporation and heat loss while the pool is not in use and a children’s paddling pool; purchase and assembly of equipment of a complete mineral-sulphur pool technique; the beach around the pool with drains, finished with non-slip and antibacterial material in the colouring of the environment; equipment with benches, deck chairs, etc.; a building in a shape referring to megalithic tombs discovered in Słonowice (Gmina Kazimierza Wielka), in which there is a salt chamber, two toilets with showers, a room for lifeguards, a bar room, a room for archaeological expositions; fence of existing objects; go from the existing building of the pool to a new building and a sulphide pool; the parking lot and the fence. The infrastructure will be adapted to the needs of people with disabilities. The direct objective: developing endogenous potential by increasing access to and development of specific natural and cultural resources; Intermediate objective: accelerating economic development and increasing investment attractiveness of the county-promotion of health tourism with the generation of demand for rehabilitation and massage services; strategic importance for the development of the region-an increase in the number of tourists visiting the county; increasing the attractiveness of the county as a place of residence-reducing external migration. The project will affect the implementation of the following indicators: 1. Number of projects which financed the costs of rational improvement for people with disabilities [pcs] – 1, 2. Number of facilities adapted to the needs of people with disabilities [pc.] – 1, 3. Employment growth in supported entities (other than enterprises) [EPC] – 5,5. (English)
    21 October 2020
    0 references

    Identifiers

    RPSW.07.02.00-26-0026/16
    0 references