Water — wastewater management in the agglomeration of the roots (Q127763): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The main objective of the project is to increase the population using the waste water treatment system within the agglomeration of Sroot. As a result of the realisation of the investment, the 3490 inhabitants of the area of Górno (the agglomeration of the root) will be able to connect to the network. Investment consisting of: 1th construction of the wastewater treatment plant in the Sroot with capacity of Qdśr = 1 200 m³/d with the possibility...) |
(Created claim: summary (P836): The main objective of the project is to increase the population using the sewage treatment system in the Skorzeszyce agglomeration. As a result of the investment, 3490 inhabitants from Górno commune (Skorzeszyce agglomeration) will be able to connect to the network. Investment consisting of: 1. construction of sewage treatment plant in Skorzeszyce with capacity Qdśr=1200 m³/d with possibility of extension to Qdśr= 1800 m³/d, 2. construction of s...) |
||||||||||||||
Property / summary | |||||||||||||||
The main objective of the project is to increase the population using the sewage treatment system in the Skorzeszyce agglomeration. As a result of the investment, 3490 inhabitants from Górno commune (Skorzeszyce agglomeration) will be able to connect to the network. Investment consisting of: 1. construction of sewage treatment plant in Skorzeszyce with capacity Qdśr=1200 m³/d with possibility of extension to Qdśr= 1800 m³/d, 2. construction of sewage system in Skorzeszyce with a length of 16,802 km; 3. construction of sanitary sewage system in Wola Jachowa with a length of 14.814 km; 4. construction of sanitary sewage system in Górno with a length of 7.084 km. Total of 38.7 km 5.assembly of intelligent water sewage network management systems (GIS, SCAD, telemetric system monitoring of water supply networks – telemetry poles (the undertaking will save water). The implementation of the project will contribute to: 1. solutions to the problems of sewage management in the area of Skorzeszyce agglomeration and thus the whole commune of Górno, 2. protection of surface and groundwater against pollution (decommissioning of waste water and illegal direct discharges of waste water to the receiver), 3. protection of natural valuable areas located in the area of the agglomeration and municipality, 4. improvement of living conditions of local residents (increasing access to sanitary sewage). Indicators: 1. The number of additional persons benefiting from improved waste water treatment (CI 19) – 3490; 2. The volume of waste water cargo undergoing improved treatment – 11668; 3. Length of built sanitary sewage system – 38,7; 4. Number of urban waste water treatment plants built-1. The scope of project implementation in the competition is consistent with the scope of the project submitted to the Master Plan. (English) | |||||||||||||||
Property / summary: The main objective of the project is to increase the population using the sewage treatment system in the Skorzeszyce agglomeration. As a result of the investment, 3490 inhabitants from Górno commune (Skorzeszyce agglomeration) will be able to connect to the network. Investment consisting of: 1. construction of sewage treatment plant in Skorzeszyce with capacity Qdśr=1200 m³/d with possibility of extension to Qdśr= 1800 m³/d, 2. construction of sewage system in Skorzeszyce with a length of 16,802 km; 3. construction of sanitary sewage system in Wola Jachowa with a length of 14.814 km; 4. construction of sanitary sewage system in Górno with a length of 7.084 km. Total of 38.7 km 5.assembly of intelligent water sewage network management systems (GIS, SCAD, telemetric system monitoring of water supply networks – telemetry poles (the undertaking will save water). The implementation of the project will contribute to: 1. solutions to the problems of sewage management in the area of Skorzeszyce agglomeration and thus the whole commune of Górno, 2. protection of surface and groundwater against pollution (decommissioning of waste water and illegal direct discharges of waste water to the receiver), 3. protection of natural valuable areas located in the area of the agglomeration and municipality, 4. improvement of living conditions of local residents (increasing access to sanitary sewage). Indicators: 1. The number of additional persons benefiting from improved waste water treatment (CI 19) – 3490; 2. The volume of waste water cargo undergoing improved treatment – 11668; 3. Length of built sanitary sewage system – 38,7; 4. Number of urban waste water treatment plants built-1. The scope of project implementation in the competition is consistent with the scope of the project submitted to the Master Plan. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The main objective of the project is to increase the population using the sewage treatment system in the Skorzeszyce agglomeration. As a result of the investment, 3490 inhabitants from Górno commune (Skorzeszyce agglomeration) will be able to connect to the network. Investment consisting of: 1. construction of sewage treatment plant in Skorzeszyce with capacity Qdśr=1200 m³/d with possibility of extension to Qdśr= 1800 m³/d, 2. construction of sewage system in Skorzeszyce with a length of 16,802 km; 3. construction of sanitary sewage system in Wola Jachowa with a length of 14.814 km; 4. construction of sanitary sewage system in Górno with a length of 7.084 km. Total of 38.7 km 5.assembly of intelligent water sewage network management systems (GIS, SCAD, telemetric system monitoring of water supply networks – telemetry poles (the undertaking will save water). The implementation of the project will contribute to: 1. solutions to the problems of sewage management in the area of Skorzeszyce agglomeration and thus the whole commune of Górno, 2. protection of surface and groundwater against pollution (decommissioning of waste water and illegal direct discharges of waste water to the receiver), 3. protection of natural valuable areas located in the area of the agglomeration and municipality, 4. improvement of living conditions of local residents (increasing access to sanitary sewage). Indicators: 1. The number of additional persons benefiting from improved waste water treatment (CI 19) – 3490; 2. The volume of waste water cargo undergoing improved treatment – 11668; 3. Length of built sanitary sewage system – 38,7; 4. Number of urban waste water treatment plants built-1. The scope of project implementation in the competition is consistent with the scope of the project submitted to the Master Plan. (English) / qualifier | |||||||||||||||
point in time: 21 October 2020
|
Revision as of 12:59, 21 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Water — wastewater management in the agglomeration of the roots |
Project in Poland financed by DG Regio |
Statements
25,135,306.59 zloty
0 references
31,419,133.23 zloty
0 references
80.0 percent
0 references
1 March 2018
0 references
31 December 2021
0 references
GMINA GÓRNO
0 references
Celem głównym projektu jest zwiększenie liczby ludności korzystającej z systemu oczyszczania ścieków na terenie aglomeracji Skorzeszyce. W wyniku realizacji inwestycji 3490 mieszkańców z terenu gminy Górno (aglomeracja Skorzeszyce) uzyska możliwość podłączenia się do sieci. Inwestycja polegającej na: 1. budowie oczyszczalni ścieków w Skorzeszycach o wydajności Qdśr=1200m3/d z możliwością rozbudowy do Qdśr= 1800m3/d, 2. budowie kanalizacji sanitarnej w miejscowości Skorzeszyce o długości 16,802 km; 3. budowie kanalizacji sanitarnej w miejscowości Wola Jachowa o długości 14,814 km; 4. budowie kanalizacji sanitarnej w miejscowości Górno o długości 7,084 km. RAZEM 38,7 km 5.montażu inteligentnych systemów zarządzania sieciami wodnokanalizacyjnymi (System GIS, SCAD, system telemetryczny monitoringu sieci wodociągowej - słupki telemetryczne (przedsięwzięcie zapewni oszczędność wody). Realizacja projektu przyczyni się do: 1. rozwiązania problemów gospodarki ściekowej na terenie aglomeracji Skorzeszyce a tym samym całej Gminy Górno, 2. ochrony wód powierzchniowych i podziemnych przed zanieczyszczeniami (likwidacji zbiorników bezodpływowych oraz nielegalnych bezpośrednich zrzutów ścieków do odbiornika), 3. ochrony obszarów cennych przyrodniczo znajdujących się na obszarze aglomeracji i gminy, 4. poprawy warunków życia mieszkańców gminy (zwiększenie dostępu do kanalizacji sanitarnej). Wskaźniki: 1. Liczba dodatkowych osób korzystających z ulepszonego oczyszczania ścieków (CI 19) - 3490; 2. Wielkość ładunku ścieków poddanych ulepszonemu oczyszczaniu - 11668; 3. Długość wybudowanej kanalizacji sanitarnej - 38,7; 4. Liczba wybudowanych oczyszczalni ścieków komunalnych-1. Zakres realizacji projektu w ramach konkursu jest zgodny z zakresem projektu zgłoszonego do Master planu. (Polish)
0 references
The main objective of the project is to increase the population using the sewage treatment system in the Skorzeszyce agglomeration. As a result of the investment, 3490 inhabitants from Górno commune (Skorzeszyce agglomeration) will be able to connect to the network. Investment consisting of: 1. construction of sewage treatment plant in Skorzeszyce with capacity Qdśr=1200 m³/d with possibility of extension to Qdśr= 1800 m³/d, 2. construction of sewage system in Skorzeszyce with a length of 16,802 km; 3. construction of sanitary sewage system in Wola Jachowa with a length of 14.814 km; 4. construction of sanitary sewage system in Górno with a length of 7.084 km. Total of 38.7 km 5.assembly of intelligent water sewage network management systems (GIS, SCAD, telemetric system monitoring of water supply networks – telemetry poles (the undertaking will save water). The implementation of the project will contribute to: 1. solutions to the problems of sewage management in the area of Skorzeszyce agglomeration and thus the whole commune of Górno, 2. protection of surface and groundwater against pollution (decommissioning of waste water and illegal direct discharges of waste water to the receiver), 3. protection of natural valuable areas located in the area of the agglomeration and municipality, 4. improvement of living conditions of local residents (increasing access to sanitary sewage). Indicators: 1. The number of additional persons benefiting from improved waste water treatment (CI 19) – 3490; 2. The volume of waste water cargo undergoing improved treatment – 11668; 3. Length of built sanitary sewage system – 38,7; 4. Number of urban waste water treatment plants built-1. The scope of project implementation in the competition is consistent with the scope of the project submitted to the Master Plan. (English)
21 October 2020
0 references
Identifiers
RPSW.04.03.00-26-0001/18
0 references