Construction of the sanitary sewerage network and the exchange of the water supply from the AC pipes to the EP tube in Parzimiecha — stage II (Q124220): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The project consists of the construction of a sewerage network and the exchange of the water supply from the AC pipes to the EP tubes in Parzimiecha — in the second stage of the sewerage system of this town. The project shall comprise: Target 1. Works: sanitary sewerage: Sewage system — Sewage connections — press release — wastewater pumping station P3 — Work and replacement works 2. Works: exchange of AC pipe water pipes on EP tubes: — water...)
(‎Created claim: summary (P836): The project consists of building a sanitary sewer system and replacing the water supply from AC pipes with PE pipes in Parzymiechy – within the second stage of the sewerage of this town. The project shall include: Task 1. Construction work: sanitary sewerage: — Sewerage network – Sewerage connections – Pressure pipe – Waste pumping plant P3 – Reconstruction robots Task 2. Construction work: replacement of AC pipes with PE pipes: — Water supply n...)
Property / summary
 
The project consists of building a sanitary sewer system and replacing the water supply from AC pipes with PE pipes in Parzymiechy – within the second stage of the sewerage of this town. The project shall include: Task 1. Construction work: sanitary sewerage: — Sewerage network – Sewerage connections – Pressure pipe – Waste pumping plant P3 – Reconstruction robots Task 2. Construction work: replacement of AC pipes with PE pipes: — Water supply network – Overvoltages of water connections. As a result of the project, household waste water will be discharged to a biological and mechanical sewage treatment plant, commissioned in 2005 for culverts. 500 m³/day, located in Lipie. Once the investment is completed, the share of the population of the municipality of Lipie using a waste water treatment system in accordance with Directive 91/271/EEC will increase and the pollution of the environment (especially water) will be reduced. (English)
Property / summary: The project consists of building a sanitary sewer system and replacing the water supply from AC pipes with PE pipes in Parzymiechy – within the second stage of the sewerage of this town. The project shall include: Task 1. Construction work: sanitary sewerage: — Sewerage network – Sewerage connections – Pressure pipe – Waste pumping plant P3 – Reconstruction robots Task 2. Construction work: replacement of AC pipes with PE pipes: — Water supply network – Overvoltages of water connections. As a result of the project, household waste water will be discharged to a biological and mechanical sewage treatment plant, commissioned in 2005 for culverts. 500 m³/day, located in Lipie. Once the investment is completed, the share of the population of the municipality of Lipie using a waste water treatment system in accordance with Directive 91/271/EEC will increase and the pollution of the environment (especially water) will be reduced. (English) / rank
 
Normal rank
Property / summary: The project consists of building a sanitary sewer system and replacing the water supply from AC pipes with PE pipes in Parzymiechy – within the second stage of the sewerage of this town. The project shall include: Task 1. Construction work: sanitary sewerage: — Sewerage network – Sewerage connections – Pressure pipe – Waste pumping plant P3 – Reconstruction robots Task 2. Construction work: replacement of AC pipes with PE pipes: — Water supply network – Overvoltages of water connections. As a result of the project, household waste water will be discharged to a biological and mechanical sewage treatment plant, commissioned in 2005 for culverts. 500 m³/day, located in Lipie. Once the investment is completed, the share of the population of the municipality of Lipie using a waste water treatment system in accordance with Directive 91/271/EEC will increase and the pollution of the environment (especially water) will be reduced. (English) / qualifier
 
point in time: 21 October 2020
Timestamp+2020-10-21T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 12:29, 21 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Construction of the sanitary sewerage network and the exchange of the water supply from the AC pipes to the EP tube in Parzimiecha — stage II
Project in Poland financed by DG Regio

    Statements

    0 references
    999,982.8 zloty
    0 references
    239,995.87 Euro
    13 January 2020
    0 references
    2,426,553.76 zloty
    0 references
    582,372.9 Euro
    13 January 2020
    0 references
    41.21 percent
    0 references
    4 June 2019
    0 references
    28 December 2019
    0 references
    GMINA LIPIE
    0 references
    0 references

    51°0'45.7"N, 18°47'49.9"E
    0 references
    Projekt polega na budowie sieci kanalizacji sanitarnej oraz wymianie wodociągu z rur AC na rury PE w miejscowości Parzymiechy - w ramach II etapu kanalizacji niniejszej miejscowości. Przedsięwzięcie obejmuje: Zadanie 1. Roboty budowlane: kanalizacja sanitarna: - Sieć kanalizacji sanitarnej - Przyłącza kanalizacyjne - Rurociąg tłoczny - Przepompownia ścieków P3 - Roboty odtworzeniowe Zadanie 2. Roboty budowlane: wymiana wodociągu z rur AC na rury PE: - Sieć wodociągowa - Przepięcia przyłączy wodociągowych. W wyniku realizacji projektu ścieki z gospodarstw domowych będą odprowadzane do biologiczno - mechanicznej oczyszczalni ścieków, oddanej do użytku w 2005r. o przepust. 500 m3/dobę, zlokalizowanej w Lipiu. Po zakończeniu inwestycji zwiększy się udział ludności gminy Lipie korzystającej z systemu oczyszczania ścieków zgodnego z dyrektywą 91/271/EWG, a w konsekwencji nastąpi zmniejszenie zanieczyszczenia środowiska naturalnego (zwłaszcza wód). (Polish)
    0 references
    The project consists of building a sanitary sewer system and replacing the water supply from AC pipes with PE pipes in Parzymiechy – within the second stage of the sewerage of this town. The project shall include: Task 1. Construction work: sanitary sewerage: — Sewerage network – Sewerage connections – Pressure pipe – Waste pumping plant P3 – Reconstruction robots Task 2. Construction work: replacement of AC pipes with PE pipes: — Water supply network – Overvoltages of water connections. As a result of the project, household waste water will be discharged to a biological and mechanical sewage treatment plant, commissioned in 2005 for culverts. 500 m³/day, located in Lipie. Once the investment is completed, the share of the population of the municipality of Lipie using a waste water treatment system in accordance with Directive 91/271/EEC will increase and the pollution of the environment (especially water) will be reduced. (English)
    21 October 2020
    0 references

    Identifiers

    RPSL.05.01.02-24-06D6/17
    0 references