Q124207 (Q124207): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): The subject of the project is the construction of a sanitary drainage system in the area of Gostyń with a total length of 7588 m and reconstruction of the water supply system on a measuring street with a length of 1585.2 m. As a result of the project, 464 inhabitants will be connected to the sewage network, while 100 inhabitants will use the reconstructed water supply., translated_summary)
(‎Changed label, description and/or aliases in 1 language: remove_english_label)
label / enlabel / en
Construction of a pressure sewage system in Gostynia (Pszczyńska Street, Moderate, Rybnicka, Rybnicki, Forestry and acacia) with the reconstruction of the water mains on a graduated street

Revision as of 12:29, 21 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
No label defined
Project in Poland financed by DG Regio

    Statements

    0 references
    0 references
    3,005,158.0 zloty
    0 references
    721,237.92 Euro
    13 January 2020
    0 references
    3,667,108.64 zloty
    0 references
    880,106.07 Euro
    13 January 2020
    0 references
    81.95 percent
    0 references
    7 July 2016
    0 references
    10 August 2018
    0 references
    GMINA WYRY
    0 references
    0 references

    50°8'5.6"N, 18°53'55.3"E
    0 references
    Przedmiotem projektu jest budowa kanalizacji sanitarnej ciśnieniowej na terenie miejscowości Gostyń o łącznej długości 7 588 m oraz przebudowa sieci wodociągowej na ulicy Miarowej o długości 1 585,2 m. W wyniku realizacji projektu do sieci kanalizacyjnej podłączonych zostanie 464 mieszkańców, natomiast z przebudowanego wodociągu będzie korzystało 100 mieszkańców. (Polish)
    0 references
    The subject of the project is the construction of a sanitary drainage system in the area of Gostyń with a total length of 7588 m and reconstruction of the water supply system on a measuring street with a length of 1585.2 m. As a result of the project, 464 inhabitants will be connected to the sewage network, while 100 inhabitants will use the reconstructed water supply. (English)
    21 October 2020
    0 references

    Identifiers

    RPSL.05.01.01-24-0765/16
    0 references