Q124194 (Q124194): Difference between revisions
Jump to navigation
Jump to search
(Created claim: summary (P836): The project concerns the extension of the sanitary sewage system in Kobiór in the area of Kobiór Agglomeration with a size of 5 704 RLM. The scope of the project includes the construction of a sanitary sewer system with a length of 2004.18 mb (including gravity drainage: 1844,30 mb and press pipeline: 159.88 mb) and 1 sewage pumping plants. As a result of the project, residential buildings inhabited by 135 people will be connected to the sewage...) |
(Changed label, description and/or aliases in 1 language: remove_english_label) |
||
label / en | label / en | ||
Revision as of 12:28, 21 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project in Poland financed by DG Regio |
Statements
504,052.65 zloty
0 references
593,003.12 zloty
0 references
85.0 percent
0 references
6 December 2018
0 references
31 July 2019
0 references
GMINA KOBIÓR
0 references
Projekt dotyczy rozbudowy sieci kanalizacji sanitarnej w miejscowości Kobiór na obszarze Aglomeracji Kobiór o wielkości 5 704 RLM. W zakres projektu wchodzi budowa sieci kanalizacji sanitarnej o długości 2004,18 mb (w tym kanalizacja grawitacyjna: 1844,30 mb i rurociąg tłoczny: 159,88 mb) oraz 1 przepompowni ścieków. W wyniku realizacji projektu do kanalizacji zostaną podłączone budynki mieszkalne zamieszkałe przez 135 osób. Ścieki z obszaru objętego planowaną kanalizacją zostaną oczyszczone na istniejącej oczyszczalni ścieków w Kobiórze. (Polish)
0 references
The project concerns the extension of the sanitary sewage system in Kobiór in the area of Kobiór Agglomeration with a size of 5 704 RLM. The scope of the project includes the construction of a sanitary sewer system with a length of 2004.18 mb (including gravity drainage: 1844,30 mb and press pipeline: 159.88 mb) and 1 sewage pumping plants. As a result of the project, residential buildings inhabited by 135 people will be connected to the sewage system. Waste water from the area covered by the planned sewage system will be treated at the existing sewage treatment plant in Kobiora. (English)
21 October 2020
0 references
Identifiers
RPSL.05.01.01-24-06CG/17
0 references