Modernisation of 595 light street lighting lamps based on the use of energy-efficient LED luminaires — Phase I (Q127697): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Fixing rounding issue) |
(Removed claim: summary (P836): The project consists of the modernisation of 595 street lighting lamps in the municipality of Szydłów, based on the use of energy-efficient LED luminaires. The replacement of luminaires in the system will be carried out on one side together with the jibs. Under the project, 74 W luminaires (572 pieces) and 127 W (23 pieces) are planned in order to ensure compliance with the requirements of the lighting standard as far as possible. The benefits...) |
||
Property / summary | |||
Property / summary: The project consists of the modernisation of 595 street lighting lamps in the municipality of Szydłów, based on the use of energy-efficient LED luminaires. The replacement of luminaires in the system will be carried out on one side together with the jibs. Under the project, 74 W luminaires (572 pieces) and 127 W (23 pieces) are planned in order to ensure compliance with the requirements of the lighting standard as far as possible. The benefits of replacing street lighting on an energy-efficient LED chip include, but are not limited to: high cost and energy savings, reduction of emissions of harmful substances into the atmosphere. The annual reduction in energy demand resulting from the investment will be 43 % and the energy saved will be 181.788 MWh/year. The greenhouse gas emissions related to the operation will be reduced by 145,07 tonnes CO2/rok equivalent. The number of projects for which the rationalisation costs have been improved. — 0 spt, Number of persons who are receiving training in the area of comp. -0 persons, Number of persons covered by the number of persons assigned to the number of persons who are not included in the number of persons from the number of persons aged to 0. Amount of saved energy of heat 0 GJ/year, Number of newly created jobs — 0 FTEs, employment growth in the EU. (other than undertakings) -0 FTEs. The project will be put in place in the project “Design and Explosion” in 2019. it is part of the investment priority “promoting low carbon strategies for all types of territories, in particular for urban areas, including support for sustainable multimodal urban mobility and mitigation actions”, will be implemented under measure 3.4 “A low-carbon strategy, fostering sustainable multimodal urban mobility”. The specific objective of this activity is to reduce emissions of particulate matter and pollutants into the atmosphere. The implementation of the project will therefore contribute to the implementation of the assumptions set out in the 2014-2020 ROP WŚ. (English) / rank | |||
Revision as of 12:18, 21 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Modernisation of 595 light street lighting lamps based on the use of energy-efficient LED luminaires — Phase I |
Project in Poland financed by DG Regio |
Statements
877,631.49 zloty
0 references
1,032,507.63 zloty
0 references
85.0 percent
0 references
13 October 2017
0 references
29 November 2019
0 references
GMINA SZYDŁÓW
0 references
Przedmiotem projektu jest modernizacja 595 lamp oświetlenia ulicznego na terenie gminy Szydłów w oparciu o zastosowanie energooszczędnych opraw typu LED. Dokonana będzie wymiana opraw w układzie jeden na jeden wraz z wysięgnikami. W ramach projektu planuje się zastos. opraw o mocy 74 W (572 szt. opraw) i 127 W (23 szt. opraw), dobranych tak aby w jak największym stopniu zapewnić zgodność z wymogami normy oświetleniowej. Korzyści płynące z wymiany oświetlenia ulicznego na energooszczędne oprawy typu LED to m.in.: duże oszczędności kosztów i energii, redukcja emisji szkodliwych substancji do atmosfery. Roczne zmniejszenie zapotrzebowania na energię w wyniku przeprowadzonej inwestycji będzie na poziomie 43%, a ilość zaoszczędzonej energii wynosić będzie 181,788 MWh/rok. Emisja gazów cieplarnianych związana z funkcjon. oświetlenia ulicznego zmniejszy się o 145,07 tony równoważnika CO2/rok. Liczba projektów, w których sfinan. koszty racjon. uspraw. dla osób z niepełn. -0 szt, Liczba osób objętych szkol./doradz. w zakresie komp. klucz.- 0 osób, Liczba obiek. dost. dla potrzeb osób z niepełn.-0 szt. Ilość zaoszcz. energii ciepl.-0 GJ/rok, Liczba nowo utworz. miejsc pracy-pozost. formy - 0 EPC, Wzrost zatrudnienia we wspier. podm. (innych niż przedsięb.)-0 EPC. Rzeczowa realizacja projektu w formule "zaprojektuj i wybuduj" planowana jest na 2019 r. Proj. wpisuje się w priorytet inwestycyjny „promowanie strategii niskoemisyjnych dla wszystkich rodzajów terytoriów, w szczególności dla obszarów miejskich, w tym wspieranie zrównoważonej multimodalnej mobilności miejskiej i działań adaptacyjnych mających oddział. łagodzące na zmiany klimatu”,realizowany będzie w ramach działania 3.4 „Strategia niskoemisyjna, wsparcie zrównoważonej multimodalnej mobilności miejskiej”. Celem szczegółowym tego działania jest ograniczona emisja pyłów i substancji szkodliwych do atmosfery. Realizacja projektu przyczyni się zatem do realizacji założeń określonych w RPO WŚ na lata 2014-2020. (Polish)
0 references
Identifiers
RPSW.03.04.00-26-0010/17
0 references