Construction of units for the generation of electricity and heat from renewable sources and infrastructure for the distribution of the generated energy (Q127691): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The purpose of the project is to reduce the emissions of dusts and pollutants into the atmosphere and to base the heat demand of the project, energy from heat pumps using geothermal waters from the H1 well. Scope: to modernise the GT-1 well; implementation in the town of Kazimierz Wielkie, the depth of the absorbence approximately. 750 m with the necessary associated infrastructure, the delivery of a compression line linking the wells of the G...)
(‎Created claim: summary (P836): The aim of the project is to reduce the emission of dust and harmful substances into the atmosphere and to base the demand for thermal energy of the projects included in the project, energy from heat pumps using geothermal water from the GT 1 well in Cudzynowice. Scope: modernising the GT-1 well; construction of a well in the town of Kazimierza Wielka with a depth of approx. 750 m, together with the necessary accompanying infrastructure, constru...)
Property / summary
 
The aim of the project is to reduce the emission of dust and harmful substances into the atmosphere and to base the demand for thermal energy of the projects included in the project, energy from heat pumps using geothermal water from the GT 1 well in Cudzynowice. Scope: modernising the GT-1 well; construction of a well in the town of Kazimierza Wielka with a depth of approx. 750 m, together with the necessary accompanying infrastructure, construction of a press pipeline connecting the wells GT-1 and GT-2 with accompanying infrastructure, modernisation of the boiler room in Cudzynowice, powering the ZSR and ZPSWRZ buildings in heat; modernisation of the boiler room in Kazimierzy Wielka supplying the buildings ZAPOW and KOS (Basen); modernisation of the oil boiler room supplying the Sports Hall – transforming it into a reserve heat source; new connection of the current boiler room building to the buildings of ZPSWRw Cudzynowice; making the connection from the planned geothermal boiler room in Kazimierza Wielka to the current boiler room building; making a new connection from the building of the current oil boiler room (Sport Hall) to the CAPOW building in Kazimierza Wielka; modernisation of the internal central heating system in ZPSWR in Cudzynowice; installation of photovoltaic panels with total power approx. 160 kWp. Energy from photovoltaic panels will be used to drive heat pumps and pumps. The project will be implemented in the years 2017-2020. The primary target is identical to the objective of Action 3.4. The following result indicators will be achieved through its implementation: The amount of thermal energy saved 6389,28 GJ/year, Estimated annual decrease in greenhouse gas emissions of 554,82 MgCO2/year and product: Number of upgraded heat sources 3 pcs, Number of built units of thermal energy from RES: 3 units, Number of reconstructed units of heat generation from RES: 1 pcs, Length of built heating network 3.39 km, Length of modernised heating network 0.13 km (English)
Property / summary: The aim of the project is to reduce the emission of dust and harmful substances into the atmosphere and to base the demand for thermal energy of the projects included in the project, energy from heat pumps using geothermal water from the GT 1 well in Cudzynowice. Scope: modernising the GT-1 well; construction of a well in the town of Kazimierza Wielka with a depth of approx. 750 m, together with the necessary accompanying infrastructure, construction of a press pipeline connecting the wells GT-1 and GT-2 with accompanying infrastructure, modernisation of the boiler room in Cudzynowice, powering the ZSR and ZPSWRZ buildings in heat; modernisation of the boiler room in Kazimierzy Wielka supplying the buildings ZAPOW and KOS (Basen); modernisation of the oil boiler room supplying the Sports Hall – transforming it into a reserve heat source; new connection of the current boiler room building to the buildings of ZPSWRw Cudzynowice; making the connection from the planned geothermal boiler room in Kazimierza Wielka to the current boiler room building; making a new connection from the building of the current oil boiler room (Sport Hall) to the CAPOW building in Kazimierza Wielka; modernisation of the internal central heating system in ZPSWR in Cudzynowice; installation of photovoltaic panels with total power approx. 160 kWp. Energy from photovoltaic panels will be used to drive heat pumps and pumps. The project will be implemented in the years 2017-2020. The primary target is identical to the objective of Action 3.4. The following result indicators will be achieved through its implementation: The amount of thermal energy saved 6389,28 GJ/year, Estimated annual decrease in greenhouse gas emissions of 554,82 MgCO2/year and product: Number of upgraded heat sources 3 pcs, Number of built units of thermal energy from RES: 3 units, Number of reconstructed units of heat generation from RES: 1 pcs, Length of built heating network 3.39 km, Length of modernised heating network 0.13 km (English) / rank
 
Normal rank
Property / summary: The aim of the project is to reduce the emission of dust and harmful substances into the atmosphere and to base the demand for thermal energy of the projects included in the project, energy from heat pumps using geothermal water from the GT 1 well in Cudzynowice. Scope: modernising the GT-1 well; construction of a well in the town of Kazimierza Wielka with a depth of approx. 750 m, together with the necessary accompanying infrastructure, construction of a press pipeline connecting the wells GT-1 and GT-2 with accompanying infrastructure, modernisation of the boiler room in Cudzynowice, powering the ZSR and ZPSWRZ buildings in heat; modernisation of the boiler room in Kazimierzy Wielka supplying the buildings ZAPOW and KOS (Basen); modernisation of the oil boiler room supplying the Sports Hall – transforming it into a reserve heat source; new connection of the current boiler room building to the buildings of ZPSWRw Cudzynowice; making the connection from the planned geothermal boiler room in Kazimierza Wielka to the current boiler room building; making a new connection from the building of the current oil boiler room (Sport Hall) to the CAPOW building in Kazimierza Wielka; modernisation of the internal central heating system in ZPSWR in Cudzynowice; installation of photovoltaic panels with total power approx. 160 kWp. Energy from photovoltaic panels will be used to drive heat pumps and pumps. The project will be implemented in the years 2017-2020. The primary target is identical to the objective of Action 3.4. The following result indicators will be achieved through its implementation: The amount of thermal energy saved 6389,28 GJ/year, Estimated annual decrease in greenhouse gas emissions of 554,82 MgCO2/year and product: Number of upgraded heat sources 3 pcs, Number of built units of thermal energy from RES: 3 units, Number of reconstructed units of heat generation from RES: 1 pcs, Length of built heating network 3.39 km, Length of modernised heating network 0.13 km (English) / qualifier
 
point in time: 21 October 2020
Timestamp+2020-10-21T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 12:17, 21 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Construction of units for the generation of electricity and heat from renewable sources and infrastructure for the distribution of the generated energy
Project in Poland financed by DG Regio

    Statements

    0 references
    7,999,599.67 zloty
    0 references
    1,919,903.92 Euro
    13 January 2020
    0 references
    10,095,405.95 zloty
    0 references
    2,422,897.43 Euro
    13 January 2020
    0 references
    79.24 percent
    0 references
    7 April 2017
    0 references
    31 December 2020
    0 references
    POWIAT KAZIMIERSKI
    0 references
    Q2534656 (Deleted Item)
    0 references
    Celem przedsięwzięcia jest ograniczona emisja pyłów i substancji szkodliwych do atmosfery oraz oparcie zapotrzebowania na energie cieplną obiektów ujętych projektem, energią z pomp ciepła wykorzystujących wody geotermalne z odwiertu GT 1 w Cudzynowicach. Zakres: zmodernizowanie odwiertu GT-1; wykonanie w miejscowości Kazimierza Wielka odwiertu chłonnego o głębokości ok. 750 m wraz z niezbędna infrastrukturą towarzyszącą, wykonanie rurociągu tłocznego łączącego odwierty GT-1 i GT-2 wraz z infrastrukturą towarzyszącą, modernizacja kotłowni w Cudzynowicach zasilającej w en cieplną budynki ZSR i ZPSWRZ;modernizacja kotłowni w Kazimierzy Wielkiej zasilającej budynki ZAPOW i KOS (Basen); modernizację kotłowni olejowej zasilającej Halę Sportową – przekształcenie jej w rezerwowe źródło ciepła; wykonanie nowego przyłącza budynku obecnej kotłowni do budynków ZPSWRw Cudzynowicach; wykonanie przyłącza z planowanej kotłowni geotermalnej w Kazimierzy Wielkiej do budynku obecnej kotłowni ;wykonanie nowego przyłącza z budynku obecnej kotłowni olejowej (Hala Sportowa) do budynku CAPOW w Kazimierzy Wielkiej; wykonanie modernizacji wewnętrznej instalacji centralnego ogrzewania w ZPSWR w Cudzynowicach; montaż na dachach w/w budynków paneli fotowoltaicznych o łącznej mocy ok. 160 kWp. Energia z paneli fotowoltaicznych wykorzystywana będzie do napędu pomp ciepła i pomp tłocznych. Projekt będzie realizowany w latach 2017-2020. Cel główny jest tożsamy z celem Działania 3.4. Dzięki jego realizacji osiągnięte zostaną następujące wskaźniki rezultatu: Ilość zaoszczędzonej energii cieplnej 6389,28 GJ/rok, Szacowany roczny spadek emisji gazów cieplarnianych 554,82 MgCO2/rok oraz produktu: Liczba zmodernizowanych źródeł ciepła 3 szt, Liczba wybudowanych jednostek wytwarzania energii cieplnej z OZE: 3 szt, Liczba przebudowanych jednostek wytwarzania energii cieplnej z OZE: 1 szt, Długość wybudowanej sieci ciepłowniczej 3,39 km, Długość zmodernizowanej sieci ciepłowniczej 0,13 km (Polish)
    0 references
    The aim of the project is to reduce the emission of dust and harmful substances into the atmosphere and to base the demand for thermal energy of the projects included in the project, energy from heat pumps using geothermal water from the GT 1 well in Cudzynowice. Scope: modernising the GT-1 well; construction of a well in the town of Kazimierza Wielka with a depth of approx. 750 m, together with the necessary accompanying infrastructure, construction of a press pipeline connecting the wells GT-1 and GT-2 with accompanying infrastructure, modernisation of the boiler room in Cudzynowice, powering the ZSR and ZPSWRZ buildings in heat; modernisation of the boiler room in Kazimierzy Wielka supplying the buildings ZAPOW and KOS (Basen); modernisation of the oil boiler room supplying the Sports Hall – transforming it into a reserve heat source; new connection of the current boiler room building to the buildings of ZPSWRw Cudzynowice; making the connection from the planned geothermal boiler room in Kazimierza Wielka to the current boiler room building; making a new connection from the building of the current oil boiler room (Sport Hall) to the CAPOW building in Kazimierza Wielka; modernisation of the internal central heating system in ZPSWR in Cudzynowice; installation of photovoltaic panels with total power approx. 160 kWp. Energy from photovoltaic panels will be used to drive heat pumps and pumps. The project will be implemented in the years 2017-2020. The primary target is identical to the objective of Action 3.4. The following result indicators will be achieved through its implementation: The amount of thermal energy saved 6389,28 GJ/year, Estimated annual decrease in greenhouse gas emissions of 554,82 MgCO2/year and product: Number of upgraded heat sources 3 pcs, Number of built units of thermal energy from RES: 3 units, Number of reconstructed units of heat generation from RES: 1 pcs, Length of built heating network 3.39 km, Length of modernised heating network 0.13 km (English)
    21 October 2020
    0 references

    Identifiers

    RPSW.03.04.00-26-0002/18
    0 references