Thermal modernisation of the building keeper of the TSO in Koniecko (Q127651): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The main objective of the project is to increase the energy efficiency of buildings of general interest. The investment is part of the specific objective of Measure 3.3. Energy from renewable energy sources in the pul sector and in the population., Osi priorit.3. Efficient and green energy with the possibility of financing projects to increase the impact. Buildings of general interest. The project will be implemented in the following period: A...) |
(Created claim: summary (P836): The main objective of the project is to increase the energy efficiency of public buildings. The investment is in line with the specific objective of Measure 3.3 Improving effects. Energy. from the use of renewable energy sources in the publ. and residential sector, Axis priory.3. Efficient and green energy, where the possibility of dofinan. projects aimed at increasing results is foreseen. Energy. Public buildings. The project will be implemente...) |
||||||||||||||
Property / summary | |||||||||||||||
The main objective of the project is to increase the energy efficiency of public buildings. The investment is in line with the specific objective of Measure 3.3 Improving effects. Energy. from the use of renewable energy sources in the publ. and residential sector, Axis priory.3. Efficient and green energy, where the possibility of dofinan. projects aimed at increasing results is foreseen. Energy. Public buildings. The project will be implemented during the period of: And 2018 to VI 2020. The work related to the project will include: retrofitting inst. WHAT IS IT; the warming of the ceiling; replacement of windows, replacement of external doors, warming of the walls of the interiors and the walls of the remembrance of the ground, replacement of lighting, PV installation. The owner of the facility in which the thermal modernisation works will be carried out is the OSP Koniemłoty. The efficiency of the project is 5387.33zł/MWh/year. The energy efficiency improvement rate is 83.57 %. The ecological effect is 98.88 %. Energy savings of 83.38 % with the use of RES. Limit CO2 emissions to air 53.11MgCo2/year. It is a public utility building with social and rescue functions. The energy effect is 27.98 kWh/m². Proj. has dokum. tech. and required admin decisions. Project will be implemented in the PR area. Indicators: Amount of electricity saved: 3,37 MWh/year; Amount of thermal energy saved: 293,18GJ/year; Reduction of final energy consumption as a result of projects: 355,56GJ/year; Estimated annual decrease in greenhouse gas emissions:53.11 tonnes of CO2/year; The number of modernises. Energy of buildings: 1pcs; Space. usable buildings subjected to thermomometers.:562,9 m²; Reducing annual primary energy consumption in public buildings: 211525 kWh/year; Number of heat sources: 1 pcs. L. build one electricity generation from RES 1pcs. The OSP Koniemłoty will carry out an ex-post audit within 14 months of the investment.FNPV/C=630395,60;FRR/C=10,52 %. The fixed assets acquired will be new. (English) | |||||||||||||||
Property / summary: The main objective of the project is to increase the energy efficiency of public buildings. The investment is in line with the specific objective of Measure 3.3 Improving effects. Energy. from the use of renewable energy sources in the publ. and residential sector, Axis priory.3. Efficient and green energy, where the possibility of dofinan. projects aimed at increasing results is foreseen. Energy. Public buildings. The project will be implemented during the period of: And 2018 to VI 2020. The work related to the project will include: retrofitting inst. WHAT IS IT; the warming of the ceiling; replacement of windows, replacement of external doors, warming of the walls of the interiors and the walls of the remembrance of the ground, replacement of lighting, PV installation. The owner of the facility in which the thermal modernisation works will be carried out is the OSP Koniemłoty. The efficiency of the project is 5387.33zł/MWh/year. The energy efficiency improvement rate is 83.57 %. The ecological effect is 98.88 %. Energy savings of 83.38 % with the use of RES. Limit CO2 emissions to air 53.11MgCo2/year. It is a public utility building with social and rescue functions. The energy effect is 27.98 kWh/m². Proj. has dokum. tech. and required admin decisions. Project will be implemented in the PR area. Indicators: Amount of electricity saved: 3,37 MWh/year; Amount of thermal energy saved: 293,18GJ/year; Reduction of final energy consumption as a result of projects: 355,56GJ/year; Estimated annual decrease in greenhouse gas emissions:53.11 tonnes of CO2/year; The number of modernises. Energy of buildings: 1pcs; Space. usable buildings subjected to thermomometers.:562,9 m²; Reducing annual primary energy consumption in public buildings: 211525 kWh/year; Number of heat sources: 1 pcs. L. build one electricity generation from RES 1pcs. The OSP Koniemłoty will carry out an ex-post audit within 14 months of the investment.FNPV/C=630395,60;FRR/C=10,52 %. The fixed assets acquired will be new. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The main objective of the project is to increase the energy efficiency of public buildings. The investment is in line with the specific objective of Measure 3.3 Improving effects. Energy. from the use of renewable energy sources in the publ. and residential sector, Axis priory.3. Efficient and green energy, where the possibility of dofinan. projects aimed at increasing results is foreseen. Energy. Public buildings. The project will be implemented during the period of: And 2018 to VI 2020. The work related to the project will include: retrofitting inst. WHAT IS IT; the warming of the ceiling; replacement of windows, replacement of external doors, warming of the walls of the interiors and the walls of the remembrance of the ground, replacement of lighting, PV installation. The owner of the facility in which the thermal modernisation works will be carried out is the OSP Koniemłoty. The efficiency of the project is 5387.33zł/MWh/year. The energy efficiency improvement rate is 83.57 %. The ecological effect is 98.88 %. Energy savings of 83.38 % with the use of RES. Limit CO2 emissions to air 53.11MgCo2/year. It is a public utility building with social and rescue functions. The energy effect is 27.98 kWh/m². Proj. has dokum. tech. and required admin decisions. Project will be implemented in the PR area. Indicators: Amount of electricity saved: 3,37 MWh/year; Amount of thermal energy saved: 293,18GJ/year; Reduction of final energy consumption as a result of projects: 355,56GJ/year; Estimated annual decrease in greenhouse gas emissions:53.11 tonnes of CO2/year; The number of modernises. Energy of buildings: 1pcs; Space. usable buildings subjected to thermomometers.:562,9 m²; Reducing annual primary energy consumption in public buildings: 211525 kWh/year; Number of heat sources: 1 pcs. L. build one electricity generation from RES 1pcs. The OSP Koniemłoty will carry out an ex-post audit within 14 months of the investment.FNPV/C=630395,60;FRR/C=10,52 %. The fixed assets acquired will be new. (English) / qualifier | |||||||||||||||
point in time: 21 October 2020
|
Revision as of 12:16, 21 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Thermal modernisation of the building keeper of the TSO in Koniecko |
Project in Poland financed by DG Regio |
Statements
405,215.5 zloty
0 references
476,724.12 zloty
0 references
85.0 percent
0 references
31 January 2018
0 references
30 June 2020
0 references
OCHOTNICZA STRAŻ POŻARNA W KONIEMŁOTACH
0 references
Głównym celem proj. jest zwiększona efektywność energ. budynków użyteczności publicznej. Inwestycja wpisuje się w cel szczegółowy Działania 3.3 Poprawa efekty. Energ. z wykorzysta. odnawialnych źródeł energii w sektorze publ. i mieszk., Osi prioryt.3. Efektywna i zielona energia, gdzie przewidziano możliwość dofinan. przedsięwzięć mających na celu zwiększenie efekty. Energ. budynków użyteczności publicznej. Projekt realizowany będzie w okresie: I 2018 do VI 2020. Prace związane z projektem będą polegały m.in. na: modernizacji inst. CO; ociepleniu stropu; wymianie okien, wymianie drzwi zewnętrznych, ociepleniu ścian zewnęt. oraz ścian zewnęt. przy gruncie, wymianie oświetlenia, instalacji PV. Właścicielem obiektu, w którym zostaną przeprowadzone prace termomodernizacyjne jest OSP Koniemłoty. Efektywność dofinan. projektu wynosi 5387,33zł/MWh/rok. Stopień poprawy efektywności energetycznej wynosi 83,57%. Efekt ekologiczny 98,88%. Oszczędność energii ciepła o 83,38% z wykorzystaniem OZE. Ograniczenie emisji CO2 do powietrza 53,11MgCo2/rok. Jest to budynek użyteczności publicznej pełniący funkcje społeczne i ratownicze. Efekt energ. wynosi 27,98kWh/m2. Proj. posiada dokum. tech. oraz wymagane decyzje admin. Proj. realizowany będzie na obszarze PR. Wskaźniki: Ilość zaoszczędzonej energii elektr.:3,37MWh/rok; Il. zaoszczędzonej energii cieplnej:293,18GJ/rok; Zmniejszenie zużycia energii końcowej w wyniku realizacji projektów: 355,56GJ/rok; Szacowany roczny spadek emisji gazów cieplarnianych:53,11 tony równoważnika CO2/rok; Liczba zmodernizo. Energ. budynków: 1szt; Powierz. użytkowa budynków poddanych termomoder.:562,9m2; Zmniejszenie rocznego zużycia energii pierwotnej w budynkach publicznych: 211525 kWh/rok; Liczba zmoder. źródeł ciepła:1szt. L. wybud. jedn. wytwarzania energii elektr. z OZE 1szt. OSP Koniemłoty dokona audytu energ. ex-post w terminie 14 m-cy od zak. inwestycji.FNPV/C=630395,60;FRR/C=10,52%. Nabywane środki trwałe będą nowe. (Polish)
0 references
The main objective of the project is to increase the energy efficiency of public buildings. The investment is in line with the specific objective of Measure 3.3 Improving effects. Energy. from the use of renewable energy sources in the publ. and residential sector, Axis priory.3. Efficient and green energy, where the possibility of dofinan. projects aimed at increasing results is foreseen. Energy. Public buildings. The project will be implemented during the period of: And 2018 to VI 2020. The work related to the project will include: retrofitting inst. WHAT IS IT; the warming of the ceiling; replacement of windows, replacement of external doors, warming of the walls of the interiors and the walls of the remembrance of the ground, replacement of lighting, PV installation. The owner of the facility in which the thermal modernisation works will be carried out is the OSP Koniemłoty. The efficiency of the project is 5387.33zł/MWh/year. The energy efficiency improvement rate is 83.57 %. The ecological effect is 98.88 %. Energy savings of 83.38 % with the use of RES. Limit CO2 emissions to air 53.11MgCo2/year. It is a public utility building with social and rescue functions. The energy effect is 27.98 kWh/m². Proj. has dokum. tech. and required admin decisions. Project will be implemented in the PR area. Indicators: Amount of electricity saved: 3,37 MWh/year; Amount of thermal energy saved: 293,18GJ/year; Reduction of final energy consumption as a result of projects: 355,56GJ/year; Estimated annual decrease in greenhouse gas emissions:53.11 tonnes of CO2/year; The number of modernises. Energy of buildings: 1pcs; Space. usable buildings subjected to thermomometers.:562,9 m²; Reducing annual primary energy consumption in public buildings: 211525 kWh/year; Number of heat sources: 1 pcs. L. build one electricity generation from RES 1pcs. The OSP Koniemłoty will carry out an ex-post audit within 14 months of the investment.FNPV/C=630395,60;FRR/C=10,52 %. The fixed assets acquired will be new. (English)
21 October 2020
0 references
Identifiers
RPSW.03.03.00-26-0046/17
0 references