Improving the energy efficiency of the municipal buildings of the municipality of Krasocin (Q127643): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The project involves carrying out a deep thermal renovation of 4 public works in the municipality: — The former administrative building of the former Post/wójt, dz. Ew.580/2/— Moderate of enclosure walls in the land, internal wall, costume over the last floor, replacement of window frames and performance of auxiliary works, heating installation for heating installation — GOPS/dz.w. 781/2/— moderator of the building envelope. in the ground, int...)
(‎Created claim: summary (P836): The project involves carrying out a deep thermal modernisation of 4 public buildings in the commune: — administrative building. after the former post office/“voiceship”, dz. EW.580/2/-modern. partition of buildings, including walls in the ground, exterior walls, ceiling over the last floor, replacement of the exterior of window joinery and additional works, modern heating installation – GOPS/dz. 781/2/-modern. building partitions including walls...)
Property / summary
 
The project involves carrying out a deep thermal modernisation of 4 public buildings in the commune: — administrative building. after the former post office/“voiceship”, dz. EW.580/2/-modern. partition of buildings, including walls in the ground, exterior walls, ceiling over the last floor, replacement of the exterior of window joinery and additional works, modern heating installation – GOPS/dz. 781/2/-modern. building partitions including walls in ground, exterior walls, roof, exterior doors and additional works, repair of roof covering – SP in Cieślach. EW.354/-modern. partition of buildings including cellar walls, foundation walls, exterior walls, ceiling over the last floor, roof, partial replacement of exterior windows and additional works, modern hot water installation, modern heating system, including replacement of boiler and fittings – UG in Krasocino/dz. EW.580/2/-modern. partition of buildings, including walls in the ground, exterior walls, ceiling over the last floor, replacement of external window joinery and additional works, modern heating installation As part of the task in each of the buildings, among others, indices of heat meters and hot water will be installed. Through the implementation of the project, the efficiency of buildings will be increased, which directly fulfils the specific objective of the action. Add-on actions: execution of design documentation, promotion. Through the implementation of the task, the following indicators are planned to be achieved: — the estimated annual decrease in greenhouse gas emissions – 514.04 tonnes of equilibrium. CO2 – number of modernised heat sources – 1 pcs. — reduction of annual primary energy consumption in publ buildings. — 1681174,00 kWh/year – usable area of buildings undergoing thermal modernisation – 2845.51 m² – number of energy-conditioned buildings – 4 pieces. — reduction of final energy consumption as a result of projects – 5 502.03 GJ/year – amount of thermal energy saved – 5 502,03 GJ/year (English)
Property / summary: The project involves carrying out a deep thermal modernisation of 4 public buildings in the commune: — administrative building. after the former post office/“voiceship”, dz. EW.580/2/-modern. partition of buildings, including walls in the ground, exterior walls, ceiling over the last floor, replacement of the exterior of window joinery and additional works, modern heating installation – GOPS/dz. 781/2/-modern. building partitions including walls in ground, exterior walls, roof, exterior doors and additional works, repair of roof covering – SP in Cieślach. EW.354/-modern. partition of buildings including cellar walls, foundation walls, exterior walls, ceiling over the last floor, roof, partial replacement of exterior windows and additional works, modern hot water installation, modern heating system, including replacement of boiler and fittings – UG in Krasocino/dz. EW.580/2/-modern. partition of buildings, including walls in the ground, exterior walls, ceiling over the last floor, replacement of external window joinery and additional works, modern heating installation As part of the task in each of the buildings, among others, indices of heat meters and hot water will be installed. Through the implementation of the project, the efficiency of buildings will be increased, which directly fulfils the specific objective of the action. Add-on actions: execution of design documentation, promotion. Through the implementation of the task, the following indicators are planned to be achieved: — the estimated annual decrease in greenhouse gas emissions – 514.04 tonnes of equilibrium. CO2 – number of modernised heat sources – 1 pcs. — reduction of annual primary energy consumption in publ buildings. — 1681174,00 kWh/year – usable area of buildings undergoing thermal modernisation – 2845.51 m² – number of energy-conditioned buildings – 4 pieces. — reduction of final energy consumption as a result of projects – 5 502.03 GJ/year – amount of thermal energy saved – 5 502,03 GJ/year (English) / rank
 
Normal rank
Property / summary: The project involves carrying out a deep thermal modernisation of 4 public buildings in the commune: — administrative building. after the former post office/“voiceship”, dz. EW.580/2/-modern. partition of buildings, including walls in the ground, exterior walls, ceiling over the last floor, replacement of the exterior of window joinery and additional works, modern heating installation – GOPS/dz. 781/2/-modern. building partitions including walls in ground, exterior walls, roof, exterior doors and additional works, repair of roof covering – SP in Cieślach. EW.354/-modern. partition of buildings including cellar walls, foundation walls, exterior walls, ceiling over the last floor, roof, partial replacement of exterior windows and additional works, modern hot water installation, modern heating system, including replacement of boiler and fittings – UG in Krasocino/dz. EW.580/2/-modern. partition of buildings, including walls in the ground, exterior walls, ceiling over the last floor, replacement of external window joinery and additional works, modern heating installation As part of the task in each of the buildings, among others, indices of heat meters and hot water will be installed. Through the implementation of the project, the efficiency of buildings will be increased, which directly fulfils the specific objective of the action. Add-on actions: execution of design documentation, promotion. Through the implementation of the task, the following indicators are planned to be achieved: — the estimated annual decrease in greenhouse gas emissions – 514.04 tonnes of equilibrium. CO2 – number of modernised heat sources – 1 pcs. — reduction of annual primary energy consumption in publ buildings. — 1681174,00 kWh/year – usable area of buildings undergoing thermal modernisation – 2845.51 m² – number of energy-conditioned buildings – 4 pieces. — reduction of final energy consumption as a result of projects – 5 502.03 GJ/year – amount of thermal energy saved – 5 502,03 GJ/year (English) / qualifier
 
point in time: 21 October 2020
Timestamp+2020-10-21T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 12:16, 21 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Improving the energy efficiency of the municipal buildings of the municipality of Krasocin
Project in Poland financed by DG Regio

    Statements

    0 references
    1,797,954.7 zloty
    0 references
    431,509.13 Euro
    13 January 2020
    0 references
    2,430,488.56 zloty
    0 references
    583,317.25 Euro
    13 January 2020
    0 references
    73.98 percent
    0 references
    31 January 2017
    0 references
    15 November 2018
    0 references
    GMINA KRASOCIN
    0 references
    Projekt zakłada przeprowadzenie głębokiej termomodernizacji 4 obiektów publicznych w gminie: - budynku administr. po byłej poczcie /"wójtostwo", dz. Ew.580/2/ - modern. przegród budowl. w tym ścian w gruncie, ścian zewn., stropu nad ostatnią kondygnacją, wymiana zewn. stolarki okiennej oraz wykonanie robót dodatkowych, modern. instalacji grzewczej - GOPS /dz.ew. 781/2/ - modern. przegród budowl. w tym ścian w gruncie, ścian zewn., dachu, drzwi zewn. oraz wykonanie robót dodatk., remont pokrycia dachowego - SP w Cieślach /dz. Ew.354/ - modern. przegród budowl. w tym ścian piwnic, ścian fundamentowych, ścian zewn., stropu nad ostatnią kondygnacją, dachu, częściowa wymiana zewn. stolarki okiennej oraz wykonanie robót dodatkowych, modern. instalacji ciepłej wody użytk., modern. instalacji grzewczej, wraz z wymianą kotła i osprzętu - UG w Krasocinie /dz. Ew.580/2/ - modern. przegród budowl. w tym ścian w gruncie, ścian zewn., stropu nad ostatnią kondygnacją, wymiana zewn. stolarki okiennej oraz wykonanie robót dodatkowych, modern. instalacji grzewczej W ramach zadania w każdym z budynków zamontowane zostaną m.in. indyw. liczniki ciepła i ciepłej wody użytkowej. Poprzez realizację projektu zwiększona zostanie efektywność energ. budynków, co bezpośrednio realizuje cel szczegółowy działania. Działaniami dodat.: wykonanie dokumentacji projektowej, promocja. Poprzez realizację zadania planowane są do osiągnięcia następujące wskaźniki: - szacowany roczny spadek emisji gazów cieplarnianych - 514,04 tony równow. CO2 - liczba zmodernizowanych źródeł ciepła - 1 szt. - zmniejszenie rocznego zużycia energii pierwotnej w budynkach publ. - 1 681174,00 kWh/rok - powierzchnia użytkowa budynków poddanych termomodernizacji - 2 845,51 m2 - liczba zmodernizowanych energetycznie budynków - 4 szt. - zmniejszenie zużycia energii końcowej w wyniku realizacji projektów - 5 502,03 GJ/rok - ilość zaoszczędzonej energii cieplnej - 5 502,03 GJ/rok (Polish)
    0 references
    The project involves carrying out a deep thermal modernisation of 4 public buildings in the commune: — administrative building. after the former post office/“voiceship”, dz. EW.580/2/-modern. partition of buildings, including walls in the ground, exterior walls, ceiling over the last floor, replacement of the exterior of window joinery and additional works, modern heating installation – GOPS/dz. 781/2/-modern. building partitions including walls in ground, exterior walls, roof, exterior doors and additional works, repair of roof covering – SP in Cieślach. EW.354/-modern. partition of buildings including cellar walls, foundation walls, exterior walls, ceiling over the last floor, roof, partial replacement of exterior windows and additional works, modern hot water installation, modern heating system, including replacement of boiler and fittings – UG in Krasocino/dz. EW.580/2/-modern. partition of buildings, including walls in the ground, exterior walls, ceiling over the last floor, replacement of external window joinery and additional works, modern heating installation As part of the task in each of the buildings, among others, indices of heat meters and hot water will be installed. Through the implementation of the project, the efficiency of buildings will be increased, which directly fulfils the specific objective of the action. Add-on actions: execution of design documentation, promotion. Through the implementation of the task, the following indicators are planned to be achieved: — the estimated annual decrease in greenhouse gas emissions – 514.04 tonnes of equilibrium. CO2 – number of modernised heat sources – 1 pcs. — reduction of annual primary energy consumption in publ buildings. — 1681174,00 kWh/year – usable area of buildings undergoing thermal modernisation – 2845.51 m² – number of energy-conditioned buildings – 4 pieces. — reduction of final energy consumption as a result of projects – 5 502.03 GJ/year – amount of thermal energy saved – 5 502,03 GJ/year (English)
    21 October 2020
    0 references

    Identifiers

    RPSW.03.03.00-26-0032/16
    0 references