Support for urban mobility — design of facilities for cyclists in Siemianowice Ślasie city (Q124104): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The project involves the construction of integrated connecting hubs (ZCP) in Siemianowice (ZCP) in Siemianowice, and the creation of a network of cycle paths. The CP will be located in: — in the Centre’s district at ul. Świeczewski, at the site of two existing bus stops (varnish). Katowice and varnish. DK 94). The newly designed stop will be composed of three main components forming a coherent whole: the wake event, the B & R car park and the...)
(‎Created claim: summary (P836): The object of the project is to build in Siemianowice Silesian Integrated Interchange Centres (ZCP), objects of key points of the city, as well as the creation of a network of cycle lines. ZCPs will be located: — in the district of the Centre on ul. Świerczewski, in place of two existing bus stops (in the directions. Katowice and the Hearts. DK 94. The newly designed stops will consist of three main elements, forming a coherent whole: reconstruc...)
Property / summary
 
The object of the project is to build in Siemianowice Silesian Integrated Interchange Centres (ZCP), objects of key points of the city, as well as the creation of a network of cycle lines. ZCPs will be located: — in the district of the Centre on ul. Świerczewski, in place of two existing bus stops (in the directions. Katowice and the Hearts. DK 94. The newly designed stops will consist of three main elements, forming a coherent whole: reconstructed stop shelter, car park B&R and closed bicycle boxes. By complementing ZCP, they will be located in the immediate vicinity of one of the stops B&R (20 parking spaces). — for the districts of Michałkowice, Bańgów and Bytków, it is planned to create on the outskirts of the city, ZCP with facilities like B&R and P&R in the vicinity of existing bus stops. A joint element of the project will be the construction of a network of cycling routes with a total length of 17 km, which communicates with each other the main districts of the city. (English)
Property / summary: The object of the project is to build in Siemianowice Silesian Integrated Interchange Centres (ZCP), objects of key points of the city, as well as the creation of a network of cycle lines. ZCPs will be located: — in the district of the Centre on ul. Świerczewski, in place of two existing bus stops (in the directions. Katowice and the Hearts. DK 94. The newly designed stops will consist of three main elements, forming a coherent whole: reconstructed stop shelter, car park B&R and closed bicycle boxes. By complementing ZCP, they will be located in the immediate vicinity of one of the stops B&R (20 parking spaces). — for the districts of Michałkowice, Bańgów and Bytków, it is planned to create on the outskirts of the city, ZCP with facilities like B&R and P&R in the vicinity of existing bus stops. A joint element of the project will be the construction of a network of cycling routes with a total length of 17 km, which communicates with each other the main districts of the city. (English) / rank
 
Normal rank
Property / summary: The object of the project is to build in Siemianowice Silesian Integrated Interchange Centres (ZCP), objects of key points of the city, as well as the creation of a network of cycle lines. ZCPs will be located: — in the district of the Centre on ul. Świerczewski, in place of two existing bus stops (in the directions. Katowice and the Hearts. DK 94. The newly designed stops will consist of three main elements, forming a coherent whole: reconstructed stop shelter, car park B&R and closed bicycle boxes. By complementing ZCP, they will be located in the immediate vicinity of one of the stops B&R (20 parking spaces). — for the districts of Michałkowice, Bańgów and Bytków, it is planned to create on the outskirts of the city, ZCP with facilities like B&R and P&R in the vicinity of existing bus stops. A joint element of the project will be the construction of a network of cycling routes with a total length of 17 km, which communicates with each other the main districts of the city. (English) / qualifier
 
point in time: 21 October 2020
Timestamp+2020-10-21T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 11:39, 21 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Support for urban mobility — design of facilities for cyclists in Siemianowice Ślasie city
Project in Poland financed by DG Regio

    Statements

    0 references
    6,071,467.6 zloty
    0 references
    1,457,152.22 Euro
    13 January 2020
    0 references
    7,142,903.05 zloty
    0 references
    1,714,296.73 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    21 December 2015
    0 references
    29 June 2018
    0 references
    GMINA SIEMIANOWICE ŚLĄSKIE
    0 references
    0 references

    50°18'46.4"N, 19°1'4.1"E
    0 references
    Przedmiotem projektu jest wybudowanie na terenie Siemianowic Śląskich Zintegrowanych Centrów Przesiadkowych (ZCP), obiektów kluczowych punktach miasta, a także stworzenie sieci ciągów rowerowych. ZCP zlokalizowane będą: - w dzielnicy Centrum przy ul. Świerczewskiego, w miejscu dwóch istniejących przystanków autobusowych (w kier. Katowic oraz w kier. DK 94). Nowo projektowane przystanki, składać się będą z trzech głównych elementów, tworzących spójną całość: przebudowanej wiaty przystankowej, parkingu B&R oraz zamykanych boksów rowerowych. Dopełnieniem ZCP, będą zlokalizowane w bezpośrednim sąsiedztwie jednego z przystanków obiekty typu B&R (20 miejsc parkingowych). - dla dzielnic Michałkowice, Bańgów i Bytków, planuje się utworzenie na obrzeżach miasta, ZCP z obiektami typu B&R i P&R w sąsiedztwie istniejących przystanków autobusowych. Elementem spajającym projekt, będzie budowa sieci tras rowerowych o łącznej długości 17km, komunikujących ze sobą główne dzielnice miasta. (Polish)
    0 references
    The object of the project is to build in Siemianowice Silesian Integrated Interchange Centres (ZCP), objects of key points of the city, as well as the creation of a network of cycle lines. ZCPs will be located: — in the district of the Centre on ul. Świerczewski, in place of two existing bus stops (in the directions. Katowice and the Hearts. DK 94. The newly designed stops will consist of three main elements, forming a coherent whole: reconstructed stop shelter, car park B&R and closed bicycle boxes. By complementing ZCP, they will be located in the immediate vicinity of one of the stops B&R (20 parking spaces). — for the districts of Michałkowice, Bańgów and Bytków, it is planned to create on the outskirts of the city, ZCP with facilities like B&R and P&R in the vicinity of existing bus stops. A joint element of the project will be the construction of a network of cycling routes with a total length of 17 km, which communicates with each other the main districts of the city. (English)
    21 October 2020
    0 references

    Identifiers

    RPSL.04.05.01-24-03G1/16
    0 references