Improving the energy efficiency of the schools of the municipality of Hażach — Phase I (SP Harzhach) (Q124029): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The project is to be carried out on the basis of a thermal renovation of the building of the Primary School in the Hague Street 2. In view of the planned energy efficiency project, a reduction in the demand for utility energy and an increase in the energy efficiency of the plants is expected to be achieved in order to achieve significant heating savings (the building will continue to be heated by natural gas). The aim of the project is to incr...)
(‎Created claim: summary (P836): The subject of the project is the thermal modernisation of the building of the Primary School in Hażlach at ul. Kościelna 2. Due to the planned thermo-modernisation project, a reduction in the demand for useful energy and an increase in the energy efficiency of the facilities, which will allow for significant heating savings (the building will continue to be heated with natural gas). The aim of the project is to increase the energy efficiency of...)
Property / summary
 
The subject of the project is the thermal modernisation of the building of the Primary School in Hażlach at ul. Kościelna 2. Due to the planned thermo-modernisation project, a reduction in the demand for useful energy and an increase in the energy efficiency of the facilities, which will allow for significant heating savings (the building will continue to be heated with natural gas). The aim of the project is to increase the energy efficiency of the building by reducing energy demand. The project meets the statutory conditions – the saving of heat demand will be 64.1 %, i.e. over 30 %. (English)
Property / summary: The subject of the project is the thermal modernisation of the building of the Primary School in Hażlach at ul. Kościelna 2. Due to the planned thermo-modernisation project, a reduction in the demand for useful energy and an increase in the energy efficiency of the facilities, which will allow for significant heating savings (the building will continue to be heated with natural gas). The aim of the project is to increase the energy efficiency of the building by reducing energy demand. The project meets the statutory conditions – the saving of heat demand will be 64.1 %, i.e. over 30 %. (English) / rank
 
Normal rank
Property / summary: The subject of the project is the thermal modernisation of the building of the Primary School in Hażlach at ul. Kościelna 2. Due to the planned thermo-modernisation project, a reduction in the demand for useful energy and an increase in the energy efficiency of the facilities, which will allow for significant heating savings (the building will continue to be heated with natural gas). The aim of the project is to increase the energy efficiency of the building by reducing energy demand. The project meets the statutory conditions – the saving of heat demand will be 64.1 %, i.e. over 30 %. (English) / qualifier
 
point in time: 21 October 2020
Timestamp+2020-10-21T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 11:14, 21 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Improving the energy efficiency of the schools of the municipality of Hażach — Phase I (SP Harzhach)
Project in Poland financed by DG Regio

    Statements

    0 references
    0 references
    670,101.05 zloty
    0 references
    160,824.25 Euro
    13 January 2020
    0 references
    788,354.17 zloty
    0 references
    189,205.0 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    23 May 2016
    0 references
    31 December 2019
    0 references
    GMINA HAŻLACH
    0 references

    49°48'15.5"N, 18°39'52.2"E
    0 references
    Przedmiotem realizacji projektu jest termomodernizacja budynku Szkoły Podstawowej w Hażlachu przy ulicy Kościelnej 2. W związku z planowanym przedsięwzięciem termomodernizacyjnym przewiduje się zmniejszenie zapotrzebowania na energię użytkową oraz zwiększenie efektywności energetycznej obiektów, co pozwoli na uzyskanie znacznych oszczędności związanych z ogrzewaniem (budynek nadal będzie ogrzewany gazem ziemnym). Celem projektu jest zwiększenie efektywności energetycznej ww. budynku poprzez ograniczenie zapotrzebowania na energię. Przedsięwzięcie spełnia warunki ustawowe - oszczędność zapotrzebowania ciepła wyniesie 64,1% czyli powyżej 30%. (Polish)
    0 references
    The subject of the project is the thermal modernisation of the building of the Primary School in Hażlach at ul. Kościelna 2. Due to the planned thermo-modernisation project, a reduction in the demand for useful energy and an increase in the energy efficiency of the facilities, which will allow for significant heating savings (the building will continue to be heated with natural gas). The aim of the project is to increase the energy efficiency of the building by reducing energy demand. The project meets the statutory conditions – the saving of heat demand will be 64.1 %, i.e. over 30 %. (English)
    21 October 2020
    0 references

    Identifiers

    RPSL.04.03.02-24-04HD/17
    0 references