Comprehensive thermal modernisation of the Primary School in Rakuszczyce (Q124006): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The project is a thermal renovation of the school building. It aims to improve the comfort, thermal comfort of the building and reduce emissions of harmful substances. According to the energy audit, the most optimal option of the thermal modernisation project is chosen according to which the following works will be carried out: 1. Replacement of window and door frames 2. Insulation of external walls (Styropian gr. 15 cm) and tipping (at 10 cm)...) |
(Created claim: summary (P836): The subject of the project is the thermomodernisation of the school building. It is designed to improve comfort of use, thermal comfort of the building and reduce emissions of harmful substances. According to the energy audit, the most optimal option of the thermo-modernisation project has been chosen, according to which the following works will be carried out: 1. Replacement of window and door carpentry. 2. Warming of external walls (styrofoam...) |
||||||||||||||
Property / summary | |||||||||||||||
The subject of the project is the thermomodernisation of the school building. It is designed to improve comfort of use, thermal comfort of the building and reduce emissions of harmful substances. According to the energy audit, the most optimal option of the thermo-modernisation project has been chosen, according to which the following works will be carried out: 1. Replacement of window and door carpentry. 2. Warming of external walls (styrofoam gr. 15 cm) and cellars (hungry gr. 10 cm). Due to the guidelines of the provincial monument conservator, two walls in the older part of the school will be insulated with mineral insulating plates of 8 cm thick (walls) and 3 cm (spray). 3. Roof warming with mineral wool thickness 25 cm. 4. Modernisation of heating and hot water systems together with replacement of the boiler with solid fuel. 5. Mechanical ventilation with heat recovery in certain rooms. 6. Implementation of modernisation of internal lighting. (English) | |||||||||||||||
Property / summary: The subject of the project is the thermomodernisation of the school building. It is designed to improve comfort of use, thermal comfort of the building and reduce emissions of harmful substances. According to the energy audit, the most optimal option of the thermo-modernisation project has been chosen, according to which the following works will be carried out: 1. Replacement of window and door carpentry. 2. Warming of external walls (styrofoam gr. 15 cm) and cellars (hungry gr. 10 cm). Due to the guidelines of the provincial monument conservator, two walls in the older part of the school will be insulated with mineral insulating plates of 8 cm thick (walls) and 3 cm (spray). 3. Roof warming with mineral wool thickness 25 cm. 4. Modernisation of heating and hot water systems together with replacement of the boiler with solid fuel. 5. Mechanical ventilation with heat recovery in certain rooms. 6. Implementation of modernisation of internal lighting. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The subject of the project is the thermomodernisation of the school building. It is designed to improve comfort of use, thermal comfort of the building and reduce emissions of harmful substances. According to the energy audit, the most optimal option of the thermo-modernisation project has been chosen, according to which the following works will be carried out: 1. Replacement of window and door carpentry. 2. Warming of external walls (styrofoam gr. 15 cm) and cellars (hungry gr. 10 cm). Due to the guidelines of the provincial monument conservator, two walls in the older part of the school will be insulated with mineral insulating plates of 8 cm thick (walls) and 3 cm (spray). 3. Roof warming with mineral wool thickness 25 cm. 4. Modernisation of heating and hot water systems together with replacement of the boiler with solid fuel. 5. Mechanical ventilation with heat recovery in certain rooms. 6. Implementation of modernisation of internal lighting. (English) / qualifier | |||||||||||||||
point in time: 21 October 2020
|
Revision as of 11:13, 21 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Comprehensive thermal modernisation of the Primary School in Rakuszczyce |
Project in Poland financed by DG Regio |
Statements
313,009.34 zloty
0 references
368,246.29 zloty
0 references
85.0 percent
0 references
29 June 2017
0 references
3 November 2017
0 references
GMINA LYSKI
0 references
Przedmiotem projektu jest termomodernizacja budynku szkoły. Ma ona za zadanie poprawę komfortu użytkowania, komfortu cieplnego budynku i ograniczenie emisji substancji szkodliwych. Zgodnie z opracowanym audytem energetycznym wybrano najbardziej optymalny wariant przedsięwzięcia termomodernizacyjnego, zgodnie z którym zostaną wykonane następujące prace: 1. Wymiana stolarki okiennej i drzwiowej. 2. Docieplenie ścian zewnętrznych (styropian gr. 15 cm) i piwnicznych (styrodur gr. 10 cm). Ze względu na wytyczne wojewódzkiego konserwatora zabytków dwie ściany w starszej części szkoły będą docieplone od wewnątrz mineralnymi płytami izolacyjnymi grubości 8 cm (ściany) i 3 cm (nadproża). 3. Docieplenie dachu wełną mineralna grubości 25 cm. 4. Modernizacja systemu grzewczego i ciepłej wody użytkowej wraz z wymianą kotła na paliwo stałe. 5. Wykonanie wentylacji mechanicznej z odzyskiem ciepła w niektórych pomieszczeniach. 6. Wykonanie modernizacji oświetlenia wewnętrznego. (Polish)
0 references
The subject of the project is the thermomodernisation of the school building. It is designed to improve comfort of use, thermal comfort of the building and reduce emissions of harmful substances. According to the energy audit, the most optimal option of the thermo-modernisation project has been chosen, according to which the following works will be carried out: 1. Replacement of window and door carpentry. 2. Warming of external walls (styrofoam gr. 15 cm) and cellars (hungry gr. 10 cm). Due to the guidelines of the provincial monument conservator, two walls in the older part of the school will be insulated with mineral insulating plates of 8 cm thick (walls) and 3 cm (spray). 3. Roof warming with mineral wool thickness 25 cm. 4. Modernisation of heating and hot water systems together with replacement of the boiler with solid fuel. 5. Mechanical ventilation with heat recovery in certain rooms. 6. Implementation of modernisation of internal lighting. (English)
21 October 2020
0 references
Identifiers
RPSL.04.03.02-24-04E3/17
0 references