Thermal modernisation, including reduced energy and low emissions in the building’s indoor team building. (Q123974): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Fixing rounding issue)
(‎Removed claim: summary (P836): The Primary School is located at 3 Port Street. School buildings are located on plots Nos 1809/119, 2190/119 and 2189/119, which are owned by the Municipality of Mszana, which are held in a permanent school management. As part of the task, thermal modernisation of the Primary School’s buildings is planned, in particular: — insulation of external walls styropiate gr.10 and 12 cm insulation of solid mineral wool 22 cm insulation roof and mineral...)
Property / summary
The Primary School is located at 3 Port Street. School buildings are located on plots Nos 1809/119, 2190/119 and 2189/119, which are owned by the Municipality of Mszana, which are held in a permanent school management. As part of the task, thermal modernisation of the Primary School’s buildings is planned, in particular: — insulation of external walls styropiate gr.10 and 12 cm insulation of solid mineral wool 22 cm insulation roof and mineral wool insulation — replacement of window and door frames and gates for installation works, sanitary — modernisation of gas boiler room — installation of a c.o — performance of mechanical ventilation — modernisation of the electrical installation also includes dismantling works and plumbing. (English)
 
Property / summary: The Primary School is located at 3 Port Street. School buildings are located on plots Nos 1809/119, 2190/119 and 2189/119, which are owned by the Municipality of Mszana, which are held in a permanent school management. As part of the task, thermal modernisation of the Primary School’s buildings is planned, in particular: — insulation of external walls styropiate gr.10 and 12 cm insulation of solid mineral wool 22 cm insulation roof and mineral wool insulation — replacement of window and door frames and gates for installation works, sanitary — modernisation of gas boiler room — installation of a c.o — performance of mechanical ventilation — modernisation of the electrical installation also includes dismantling works and plumbing. (English) / rank
Normal rank
 

Revision as of 11:12, 21 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Thermal modernisation, including reduced energy and low emissions in the building’s indoor team building.
Project in Poland financed by DG Regio

    Statements

    0 references
    1,137,930.66 zloty
    0 references
    273,103.36 Euro
    13 January 2020
    0 references
    1,338,741.96 zloty
    0 references
    321,298.07 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    23 May 2017
    0 references
    30 November 2019
    0 references
    GMINA MSZANA
    0 references
    0 references

    49°58'1.2"N, 18°31'30.0"E
    0 references
    Szkoła Podstawowa mieści się przy ulicy Sportowej 3. Budynki szkolne zlokalizowane są na działkach nr 1809/119, 2190/119 i 2189/119, które są własnością Gminy Mszana, będące w trwałym zarządzie szkoły. W ramach zadania planowana jest termomodernizacja budynków Szkoły Podstawowej w Mszanie, w szczególności: - ocieplenie ścian zewnętrznych styropianem gr.10 i 12 cm docieplenie stropów wełną mineralną gr 22cm docieplenie dachu styropapą i wełną mineralną - wymiana stolarki okiennej i drzwiowej zewnętrznej -wykonanie robót instalacyjnych, sanitarnych - modernizacja kotłowni gazowej - wykonanie instalacji c.o - wykonanie wentylacji mechanicznej - modernizacja instalacji elektrycznej Projekt obejmuje też roboty demontaż. oraz instalacyjne hydrauliczne. (Polish)
    0 references

    Identifiers

    RPSL.04.03.02-24-0483/17
    0 references