Solar Gmina Werry (Q123709): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The project involves the installation of RES installations designed for the production of electricity and heat ensuring the maximum possible capacity adjusted to meet the needs of the facility. With the project, there are 85 RES micro-installations — 73 solar installations and 12 solar installations. The main objectives of the project are to improve the energy efficiency of residential buildings and to improve the quality of ambient air within...)
(‎Created claim: summary (P836): The object of the project is the construction of RES installations intended for the production of electricity and heat, which provide the maximum possible performance tailored to the needs of a given facility. Thanks to the project, 85 RES micro-installations – 73 photovoltaic installations and 12 solar installations will be created. The main objectives of the project are to improve the energy efficiency of residential buildings and improve the...)
Property / summary
 
The object of the project is the construction of RES installations intended for the production of electricity and heat, which provide the maximum possible performance tailored to the needs of a given facility. Thanks to the project, 85 RES micro-installations – 73 photovoltaic installations and 12 solar installations will be created. The main objectives of the project are to improve the energy efficiency of residential buildings and improve the quality of atmospheric air in the municipality of Wyry. The project is covered by both Wyry and Gostyń, thanks to which all residents of the municipality will be able to benefit from the project’s effects. Limitation of so-called. ‘low emissions’ will not only have a positive impact on air in the municipality, but will also contribute to improving living conditions in the region. Additionally, the use of RES systems has educational advantages, which will have a positive impact on the ecological awareness of residents of the municipality and visitors. (English)
Property / summary: The object of the project is the construction of RES installations intended for the production of electricity and heat, which provide the maximum possible performance tailored to the needs of a given facility. Thanks to the project, 85 RES micro-installations – 73 photovoltaic installations and 12 solar installations will be created. The main objectives of the project are to improve the energy efficiency of residential buildings and improve the quality of atmospheric air in the municipality of Wyry. The project is covered by both Wyry and Gostyń, thanks to which all residents of the municipality will be able to benefit from the project’s effects. Limitation of so-called. ‘low emissions’ will not only have a positive impact on air in the municipality, but will also contribute to improving living conditions in the region. Additionally, the use of RES systems has educational advantages, which will have a positive impact on the ecological awareness of residents of the municipality and visitors. (English) / rank
 
Normal rank
Property / summary: The object of the project is the construction of RES installations intended for the production of electricity and heat, which provide the maximum possible performance tailored to the needs of a given facility. Thanks to the project, 85 RES micro-installations – 73 photovoltaic installations and 12 solar installations will be created. The main objectives of the project are to improve the energy efficiency of residential buildings and improve the quality of atmospheric air in the municipality of Wyry. The project is covered by both Wyry and Gostyń, thanks to which all residents of the municipality will be able to benefit from the project’s effects. Limitation of so-called. ‘low emissions’ will not only have a positive impact on air in the municipality, but will also contribute to improving living conditions in the region. Additionally, the use of RES systems has educational advantages, which will have a positive impact on the ecological awareness of residents of the municipality and visitors. (English) / qualifier
 
point in time: 21 October 2020
Timestamp+2020-10-21T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 10:38, 21 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Solar Gmina Werry
Project in Poland financed by DG Regio

    Statements

    0 references
    0 references
    844,878.66 zloty
    0 references
    202,770.88 Euro
    13 January 2020
    0 references
    1,578,480.0 zloty
    0 references
    378,835.2 Euro
    13 January 2020
    0 references
    53.52 percent
    0 references
    25 July 2018
    0 references
    14 May 2019
    0 references
    GMINA WYRY
    0 references
    0 references

    50°8'5.6"N, 18°53'55.3"E
    0 references
    Przedmiotem projektu jest wykonanie instalacji OZE przeznaczonych do produkcji energii elektrycznej i cieplnej zapewniających maksymalną możliwą wydajność dostosowaną do potrzeb danego obiektu. Dzięki realizacji projektu powstanie 85 mikroinstalacji OZE - 73 instalacje fotowoltaiczne i 12 instalacji solarnych. Głównymi celami projektu są poprawa efektywności energetycznej budynków mieszkalnych oraz poprawa jakości powietrza atmosferycznego na terenie Gminy Wyry. Projektem są objęte zarówno Wyry jak i Gostyń, dzięki czemu z efektów projektu będą mogli korzystać wszyscy mieszkańcy Gminy. Ograniczenie tzw. "niskiej emisji" wpłynie pozytywnie nie tylko na powietrze w Gminie, ale przyczyni się również do poprawy warunków życiowych w regionie. Dodatkowo zastosowanie systemów OZE posiada walory edukacyjne, które pozytywnie wpłyną na świadomość ekologiczną mieszkańców Gminy oraz przyjezdnych. (Polish)
    0 references
    The object of the project is the construction of RES installations intended for the production of electricity and heat, which provide the maximum possible performance tailored to the needs of a given facility. Thanks to the project, 85 RES micro-installations – 73 photovoltaic installations and 12 solar installations will be created. The main objectives of the project are to improve the energy efficiency of residential buildings and improve the quality of atmospheric air in the municipality of Wyry. The project is covered by both Wyry and Gostyń, thanks to which all residents of the municipality will be able to benefit from the project’s effects. Limitation of so-called. ‘low emissions’ will not only have a positive impact on air in the municipality, but will also contribute to improving living conditions in the region. Additionally, the use of RES systems has educational advantages, which will have a positive impact on the ecological awareness of residents of the municipality and visitors. (English)
    21 October 2020
    0 references

    Identifiers

    RPSL.04.01.01-24-037G/17
    0 references