Modernising social infrastructure III Cologne — restoring infrastructure for society (Q126059): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Fixing rounding issue)
(‎Removed claim: summary (P836): The project is the adaptation of a degraded residential building at ul.Dworwa 33 in Knurów for the establishment of a Social Initiatives Support Centre MOPS Knurów, through which a complementary ESF project will be implemented. The material scope includes the renovation of the building with the replacement of the electrical system, the water supply and the replacement of the boiler, the insulation of the roof, the replacement of window and doo...)
Property / summary
The project is the adaptation of a degraded residential building at ul.Dworwa 33 in Knurów for the establishment of a Social Initiatives Support Centre MOPS Knurów, through which a complementary ESF project will be implemented. The material scope includes the renovation of the building with the replacement of the electrical system, the water supply and the replacement of the boiler, the insulation of the roof, the replacement of window and door frames and the development of the bypass around the building. The total surface area of the renovated building will be 286.95 m². The project also foresees a revitalisation of the urban rock in the vicinity of the planned Centre, with a view to providing space for social activation and integration of the local population. Upgrading of rocks will include redevelopment of pavements, planting of green areas, installation of a small architecture, fencing, lighting and the construction of an outdoor playground with an external chamber. (English)
 
Property / summary: The project is the adaptation of a degraded residential building at ul.Dworwa 33 in Knurów for the establishment of a Social Initiatives Support Centre MOPS Knurów, through which a complementary ESF project will be implemented. The material scope includes the renovation of the building with the replacement of the electrical system, the water supply and the replacement of the boiler, the insulation of the roof, the replacement of window and door frames and the development of the bypass around the building. The total surface area of the renovated building will be 286.95 m². The project also foresees a revitalisation of the urban rock in the vicinity of the planned Centre, with a view to providing space for social activation and integration of the local population. Upgrading of rocks will include redevelopment of pavements, planting of green areas, installation of a small architecture, fencing, lighting and the construction of an outdoor playground with an external chamber. (English) / rank
Normal rank
 

Revision as of 10:29, 21 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Modernising social infrastructure III Cologne — restoring infrastructure for society
Project in Poland financed by DG Regio

    Statements

    0 references
    2,328,899.21 zloty
    0 references
    558,935.81 Euro
    13 January 2020
    0 references
    2,739,881.42 zloty
    0 references
    657,571.54 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 April 2016
    0 references
    31 December 2019
    0 references
    GMINA KNURÓW
    0 references
    0 references
    Przedmiotem projektu jest adaptacja zdegradowanego budynku mieszkalnego przy ul.Dworcowej 33 w Knurowie na potrzeby utworzenia Centrum Wsparcia Inicjatyw Społecznych MOPS Knurów, poprzez które realizowany będzie komplementarny projekt EFS. Zakres rzeczowy obejmuje remont budynku z wymianą instalacji elektrycznej, wod-kan, co wraz z wymianą kotła, docieplenie dachu, wymiana stolarki okiennej i drzwiowej oraz zagospodarowanie obejścia wokół budynku. Łączna powierzchnia budynku poddanego rewitalizacji wyniesie 286,95 m2. W ramach projektu przewiduje się także rewitalizację skweru miejskiego, położonego nieopodal planowanego Centrum, celem udostępnienia przestrzeni do aktywizacji społecznej i integracji społeczności lokalnej. Modernizacja skweru obejmie przebudowę chodników, nasadzenie zieleni, montaż małej architektury, ogrodzenia, oświetlenia oraz budowę placu zabaw z siłownią zewnętrzną. (Polish)
    0 references

    Identifiers

    RPSL.10.03.01-24-00DC/18
    0 references