Construction of the N-S Routes in Ruda Śląska connecting the motorway bridge motorway from the A4 motorway — Stage II (Q124482): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Fixing rounding issue) |
(Removed claim: summary (P836): The object of the project is the construction of the most recent section of the N-S route, which is aimed at creating a connecting distance between Road Routes and the A4 motorway. This section includes the construction of the N-S route with a length of 1 670 m from ul. Kotten to connect to the A4 motorway in the ‘Wirek’ node. The project provided for the construction, inter alia, of the following: — Engineering structures — elements of a syst...) |
||
Property / summary | |||
Property / summary: The object of the project is the construction of the most recent section of the N-S route, which is aimed at creating a connecting distance between Road Routes and the A4 motorway. This section includes the construction of the N-S route with a length of 1 670 m from ul. Kotten to connect to the A4 motorway in the ‘Wirek’ node. The project provided for the construction, inter alia, of the following: — Engineering structures — elements of a system of drainage systems — pavements and cycle paths — road safety features such as: safety barriers, road markings and road signs — lighting along the entire route — culverts integrated for small animals. Project objectives: — increasing the availability of DTŚ and of the A4 motorway — a seamless connection between the DTŚ and the A4 motorway — an increase in the capacity of DW 925 in the ‘-pd’ direction. — to increase traffic safety to the street 1 May — shortened journey times between towns and cities: 1 May — improving the investment attractiveness of land located in the street 1 May and N-S (English) / rank | |||
Revision as of 10:13, 21 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Construction of the N-S Routes in Ruda Śląska connecting the motorway bridge motorway from the A4 motorway — Stage II |
Project in Poland financed by DG Regio |
Statements
110,483,864.63 zloty
0 references
165,395,006.93 zloty
0 references
66.8 percent
0 references
7 October 2014
0 references
23 December 2020
0 references
MIASTO RUDA ŚLĄSKA
0 references
Przedmiotem projektu jest budowa ostatniego odcinka trasy N-S, która ma na celu utworzenie bezkolizyjnego połączenia Drogowej Trasy Średnicowej z autostradą A4. Odcinek ten obejmuje budowę trasy N-S o długości 1670 m od ul. Kokota do połączenia z autostradą A4 w węźle „Wirek”. W ramach projektu przewidziano budowę m.in.: - obiektów inżynierskich - elementów systemu odwodnienia - chodników i ścieżek rowerowych - elementów bezpieczeństwa ruchu drogowego takich jak: bariery ochronne, oznakowanie poziome i pionowe - oświetlenia wzdłuż całej trasy - przepustów zintegrowanych z przejściem dla małych zwierząt. Celem projektu jest: - zwiększenie dostępności DTŚ i autostrady A4 - bezkolizyjne połączenie DTŚ z autostradą A4 - zwiększenie przepustowości DW 925 w kierunku pn.– pd. - zwiększenie bezpieczeństwa ruchu na ul. 1 Maja - skrócenie czasu przejazdu pomiędzy pn. i pd. dzielnicami miasta oraz ul. 1 Maja - podniesienie atrakcyjności inwestycyjnej terenów położonych w ciągu ul. 1 Maja i N-S (Polish)
0 references
Identifiers
RPSL.06.01.00-24-09EE/16
0 references