Q122545 (Q122545): Difference between revisions
Jump to navigation
Jump to search
(Created claim: summary (P836): The object of the planned investment is the expansion of the composting plant in the Regional Municipal Waste Processing Plant. A phased expansion is planned. At this stage, the construction of: —3 bioreactors and 1 without armament with process air purification system i.e. biofilter and ventilation system i.e. 3 aeration fans built in a container fan room; compost/stabilisation maturation site; a paved area between the bioreactors and the matur...) |
(Changed label, description and/or aliases in 1 language: remove_english_label) |
||
label / en | label / en | ||
Revision as of 09:52, 21 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project in Poland financed by DG Regio |
Statements
6,133,131.74 zloty
0 references
7,215,449.11 zloty
0 references
85.0 percent
0 references
1 October 2018
0 references
31 December 2019
0 references
ZAKŁAD ZAGOSPODAROWANIA ODPADÓW „CZYSTA BŁĘKITNA KRAINA” SP. Z O.O. W CZARNÓWKU
0 references
Przedmiotem planowanej inwestycji jest rozbudowa kompostowni na terenie Regionalnej Instalacji Przetwarzania Odpadów Komunalnych. Zakłada się rozbudowę etapową. Na obecnym etapie zakłada się budowę : -3 bioreaktorów oraz 1 bez uzbrojenia z instalacją do oczyszczania powietrza procesowego tj. biofiltrem oraz system wentylacji tj. 3 wentylatorów napowietrzających zabudowanych w kontenerowej wentylatorowni; placu dojrzewania kompostu/stabilizatu; utwardzonego plac pomiędzy bioreaktorami a placem dojrzewania – teren manewrowy/plac technologiczny; szczelnego, podziemnego zbiornika na odcieki, dostawę rozdrabniarki. Celem instalacji kompostowania jest: - stabilizacja biologiczna odpadów frakcji 0-80 mm zawierającej odpady biodegradowalne oraz produkcja kompostu z odpadów zielonych i kuchennych z selektywnej zbiórki, a także osadów ściekowych. Przepustowość reaktorów to ok. 9500 Mg/rok. Celem projektu jest redukcja składowania odpadów, zwiększenie recyklingu i poprawa jakości przetwarzania. (Polish)
0 references
The object of the planned investment is the expansion of the composting plant in the Regional Municipal Waste Processing Plant. A phased expansion is planned. At this stage, the construction of: —3 bioreactors and 1 without armament with process air purification system i.e. biofilter and ventilation system i.e. 3 aeration fans built in a container fan room; compost/stabilisation maturation site; a paved area between the bioreactors and the maturation area – the manoeuvring area/technological area; an airtight underground leaching tank, delivery of a shredder. The purpose of the composting installation is to: — biostabilisation of waste fraction 0-80 mm containing biodegradable waste and the production of compost from green and kitchen waste from selective collection, as well as sewage sludge. Reactor capacity is approx. 9500 Mg/year. The aim of the project is to reduce the landfill of waste, increase recycling and improve the quality of treatment. (English)
21 October 2020
0 references
Identifiers
RPPM.11.02.00-22-0014/17
0 references