Extension, lighting and retrofitting of existing stations for the separate collection of municipal waste in Sheka and Kielce (Q122534): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The project consists of the extension of the existing two separate waste collection points in Sheka and Szulna (gm. Shemd) about the roof of the containers and installation of the lighting. In addition, a total of 2 pieces of industrial instruments and the paving of the part of the PSZOK Kino site are foreseen. Under the Flexibility Instrument, it is planned to carry out an educational and educational campaign for the inhabitants of the munici...)
(‎Created claim: summary (P836): The subject of the project is to expand the two existing sites of selective waste collection in Szemud and Kielce (gm. Szemud) with shelters covering containers and installation of lighting. In addition, the supply of 2 units of industrial weights and the hardening of part of the area PSZOK Kielno are foreseen. The Flexibility Instrument plans to carry out an information and educational campaign for the residents of the municipality covered by t...)
Property / summary
 
The subject of the project is to expand the two existing sites of selective waste collection in Szemud and Kielce (gm. Szemud) with shelters covering containers and installation of lighting. In addition, the supply of 2 units of industrial weights and the hardening of part of the area PSZOK Kielno are foreseen. The Flexibility Instrument plans to carry out an information and educational campaign for the residents of the municipality covered by the project. The aim of the project is to reduce anthropopression on the environment and improve the environmental living conditions of residents by increasing the efficiency of waste management system in the municipality of Szemud. Thanks to the project, 17,060 people will be subject to selective waste collection. (English)
Property / summary: The subject of the project is to expand the two existing sites of selective waste collection in Szemud and Kielce (gm. Szemud) with shelters covering containers and installation of lighting. In addition, the supply of 2 units of industrial weights and the hardening of part of the area PSZOK Kielno are foreseen. The Flexibility Instrument plans to carry out an information and educational campaign for the residents of the municipality covered by the project. The aim of the project is to reduce anthropopression on the environment and improve the environmental living conditions of residents by increasing the efficiency of waste management system in the municipality of Szemud. Thanks to the project, 17,060 people will be subject to selective waste collection. (English) / rank
 
Normal rank
Property / summary: The subject of the project is to expand the two existing sites of selective waste collection in Szemud and Kielce (gm. Szemud) with shelters covering containers and installation of lighting. In addition, the supply of 2 units of industrial weights and the hardening of part of the area PSZOK Kielno are foreseen. The Flexibility Instrument plans to carry out an information and educational campaign for the residents of the municipality covered by the project. The aim of the project is to reduce anthropopression on the environment and improve the environmental living conditions of residents by increasing the efficiency of waste management system in the municipality of Szemud. Thanks to the project, 17,060 people will be subject to selective waste collection. (English) / qualifier
 
point in time: 21 October 2020
Timestamp+2020-10-21T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 09:52, 21 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Extension, lighting and retrofitting of existing stations for the separate collection of municipal waste in Sheka and Kielce
Project in Poland financed by DG Regio

    Statements

    0 references
    339,124.5 zloty
    0 references
    81,389.88 Euro
    13 January 2020
    0 references
    398,970.0 zloty
    0 references
    95,752.8 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    2 April 2018
    0 references
    30 September 2019
    0 references
    GMINA SZEMUD
    0 references
    0 references
    Przedmiotem projektu jest rozbudowa dwóch istniejących punktów selektywnego zbierania odpadów w Szemudzie i Kielnie (gm. Szemud) o wiaty zadaszające kontenery i montaż oświetlenia. Ponadto przewiduje się dostawę 2 szt. wag przemysłowych oraz utwardzenie części terenu PSZOK Kielno. W ramach instrumentu elastyczności planuje się przeprowadzenie kampanii informacyjno – edukacyjnej dla mieszkańców gminy objętych projektem. Celem projektu ograniczenie antropopresji na środowisko i poprawa środowiskowych warunków życia mieszkańców poprzez zwiększenie efektywności systemu gospodarowania odpadami na terenie gminy Szemud. Dzięki realizacji projektu 17 060 osób zostanie objętych selektywnym zbieraniem odpadów. (Polish)
    0 references
    The subject of the project is to expand the two existing sites of selective waste collection in Szemud and Kielce (gm. Szemud) with shelters covering containers and installation of lighting. In addition, the supply of 2 units of industrial weights and the hardening of part of the area PSZOK Kielno are foreseen. The Flexibility Instrument plans to carry out an information and educational campaign for the residents of the municipality covered by the project. The aim of the project is to reduce anthropopression on the environment and improve the environmental living conditions of residents by increasing the efficiency of waste management system in the municipality of Szemud. Thanks to the project, 17,060 people will be subject to selective waste collection. (English)
    21 October 2020
    0 references

    Identifiers

    RPPM.11.02.00-22-0005/17
    0 references