Extension, lighting and retrofitting of existing stations for the separate collection of municipal waste in Sheka and Kielce (Q122534): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Fixing rounding issue) |
(Removed claim: summary (P836): The project consists of the extension of the existing two separate waste collection points in Sheka and Szulna (gm. Shemd) about the roof of the containers and installation of the lighting. In addition, a total of 2 pieces of industrial instruments and the paving of the part of the PSZOK Kino site are foreseen. Under the Flexibility Instrument, it is planned to carry out an educational and educational campaign for the inhabitants of the munici...) |
||
Property / summary | |||
Property / summary: The project consists of the extension of the existing two separate waste collection points in Sheka and Szulna (gm. Shemd) about the roof of the containers and installation of the lighting. In addition, a total of 2 pieces of industrial instruments and the paving of the part of the PSZOK Kino site are foreseen. Under the Flexibility Instrument, it is planned to carry out an educational and educational campaign for the inhabitants of the municipality concerned. The objective of the project is to reduce anthropogenic pressure on the environment and improve the environmental conditions of the inhabitants by increasing the efficiency of the waste management system in the municipality of Sheemid. With the implementation of the project, 17 060 will benefit from a selective waste collection. (English) / rank | |||
Revision as of 09:52, 21 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Extension, lighting and retrofitting of existing stations for the separate collection of municipal waste in Sheka and Kielce |
Project in Poland financed by DG Regio |
Statements
339,124.5 zloty
0 references
398,970.0 zloty
0 references
85.0 percent
0 references
2 April 2018
0 references
30 September 2019
0 references
GMINA SZEMUD
0 references
Przedmiotem projektu jest rozbudowa dwóch istniejących punktów selektywnego zbierania odpadów w Szemudzie i Kielnie (gm. Szemud) o wiaty zadaszające kontenery i montaż oświetlenia. Ponadto przewiduje się dostawę 2 szt. wag przemysłowych oraz utwardzenie części terenu PSZOK Kielno. W ramach instrumentu elastyczności planuje się przeprowadzenie kampanii informacyjno – edukacyjnej dla mieszkańców gminy objętych projektem. Celem projektu ograniczenie antropopresji na środowisko i poprawa środowiskowych warunków życia mieszkańców poprzez zwiększenie efektywności systemu gospodarowania odpadami na terenie gminy Szemud. Dzięki realizacji projektu 17 060 osób zostanie objętych selektywnym zbieraniem odpadów. (Polish)
0 references
Identifiers
RPPM.11.02.00-22-0005/17
0 references