“Redeployment of a district heating system, including reconstruction of a residential district heating system and a network with high parametric buildings to buildings in the area of ul. Mokotowska, Czerniakowska and passers-by in Debirch, with the aim of reducing greenhouse gas emissions and improving efficiency.’ (Q122473): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The project will be based on the modernisation of the boiler in Debirch at ul. 22 and the construction of high performance district heating networks with connections to buildings of total length. 760Mb and heating substations (15 items) in the area ul. Czerniakowska, mokovska and Przewoku. In the boiler, 3 coal boilers will be liquidated and a 1.5 MW biomass boiler will be installed together with the installations, accessories, the investment...) |
(Created claim: summary (P836): The planned project will consist of modernisation of the boiler room in Debrzno on ul. Nice 22 and construction of high-parameter heating networks with connections to buildings with a total length of approx. 760mb and heat nodes (15 units) in the area of ul. Czerniakowska, Mokotowska and Przechodnia. In the boiler room 3 coal boilers will be liquidated, in place of which a 1.5 MW biomass boiler with a capacity of 1.5 MW together with installatio...) |
||||||||||||||
Property / summary | |||||||||||||||
The planned project will consist of modernisation of the boiler room in Debrzno on ul. Nice 22 and construction of high-parameter heating networks with connections to buildings with a total length of approx. 760mb and heat nodes (15 units) in the area of ul. Czerniakowska, Mokotowska and Przechodnia. In the boiler room 3 coal boilers will be liquidated, in place of which a 1.5 MW biomass boiler with a capacity of 1.5 MW together with installations, fittings, investment will also include the construction of a silo for biomass and land development. The project will be completed in stages – the first will include the construction of the network (2019-2020), then the boiler room (2019-2021) will be modernised. The objectives of the project shall be: modernisation of the urban heating system in Debrzno through partial exchange of heat sources with a higher thermal efficiency and network construction, enabling new connections, increasing the share of RES fuels in heat production (min.51 %) – which will reduce low emissions in Debrzno. (English) | |||||||||||||||
Property / summary: The planned project will consist of modernisation of the boiler room in Debrzno on ul. Nice 22 and construction of high-parameter heating networks with connections to buildings with a total length of approx. 760mb and heat nodes (15 units) in the area of ul. Czerniakowska, Mokotowska and Przechodnia. In the boiler room 3 coal boilers will be liquidated, in place of which a 1.5 MW biomass boiler with a capacity of 1.5 MW together with installations, fittings, investment will also include the construction of a silo for biomass and land development. The project will be completed in stages – the first will include the construction of the network (2019-2020), then the boiler room (2019-2021) will be modernised. The objectives of the project shall be: modernisation of the urban heating system in Debrzno through partial exchange of heat sources with a higher thermal efficiency and network construction, enabling new connections, increasing the share of RES fuels in heat production (min.51 %) – which will reduce low emissions in Debrzno. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The planned project will consist of modernisation of the boiler room in Debrzno on ul. Nice 22 and construction of high-parameter heating networks with connections to buildings with a total length of approx. 760mb and heat nodes (15 units) in the area of ul. Czerniakowska, Mokotowska and Przechodnia. In the boiler room 3 coal boilers will be liquidated, in place of which a 1.5 MW biomass boiler with a capacity of 1.5 MW together with installations, fittings, investment will also include the construction of a silo for biomass and land development. The project will be completed in stages – the first will include the construction of the network (2019-2020), then the boiler room (2019-2021) will be modernised. The objectives of the project shall be: modernisation of the urban heating system in Debrzno through partial exchange of heat sources with a higher thermal efficiency and network construction, enabling new connections, increasing the share of RES fuels in heat production (min.51 %) – which will reduce low emissions in Debrzno. (English) / qualifier | |||||||||||||||
point in time: 21 October 2020
|
Revision as of 09:40, 21 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | “Redeployment of a district heating system, including reconstruction of a residential district heating system and a network with high parametric buildings to buildings in the area of ul. Mokotowska, Czerniakowska and passers-by in Debirch, with the aim of reducing greenhouse gas emissions and improving efficiency.’ |
Project in Poland financed by DG Regio |
Statements
2,436,000.0 zloty
0 references
3,897,000.0 zloty
0 references
62.51 percent
0 references
1 March 2019
0 references
30 September 2022
0 references
ZAKŁAD INNOWACYJNY TECHNIK ENERGETYCZNYCH PROMAT SP Z O.O.
0 references
Planowane przedsięwzięcie polegać będzie na modernizacji kotłowni w Debrznie przy ul. Miłej 22 oraz na budowie wysokoparametrowych sieci ciepłowniczych z przyłączami do budynków o łącznej długości ok. 760mb i węzłami cieplnymi (15 szt.) w rejonie ul. Czerniakowskiej, Mokotowskiej i Przechodniej. W kotłowni zostaną zlikwidowane 3 kotły węglowe, w ich miejsce zostanie zamontowany kocioł na biomasę o mocy 1,5MW wraz z instalacjami, osprzętem, inwestycja obejmie też budowę silosa na biomasę i zagospodarowanie terenu. Projekt zostanie zrealizowany etapami - pierwszy obejmie budowę sieci (2019-2020), następnie zostanie zmodernizowana kotłownia (2019-2021). Celami przedsięwzięcia są: modernizacja miejskiego systemu ciepłowniczego w Debrznie poprzez częściową wymianę źródeł ciepła na proekologiczne o wyższej sprawności cieplnej i budowę sieci, umożliwienie nowych podłączeń, wzrost udziału paliw OZE w produkcji ciepła (min.51%)- co pozwoli na zmniejszenie niskiej emisji w Debrznie. (Polish)
0 references
The planned project will consist of modernisation of the boiler room in Debrzno on ul. Nice 22 and construction of high-parameter heating networks with connections to buildings with a total length of approx. 760mb and heat nodes (15 units) in the area of ul. Czerniakowska, Mokotowska and Przechodnia. In the boiler room 3 coal boilers will be liquidated, in place of which a 1.5 MW biomass boiler with a capacity of 1.5 MW together with installations, fittings, investment will also include the construction of a silo for biomass and land development. The project will be completed in stages – the first will include the construction of the network (2019-2020), then the boiler room (2019-2021) will be modernised. The objectives of the project shall be: modernisation of the urban heating system in Debrzno through partial exchange of heat sources with a higher thermal efficiency and network construction, enabling new connections, increasing the share of RES fuels in heat production (min.51 %) – which will reduce low emissions in Debrzno. (English)
21 October 2020
0 references
Identifiers
RPPM.10.04.00-22-0002/19
0 references